This is an old revision of this page, as edited by Bobrayner (talk | contribs) at 08:34, 11 July 2023 (new article: Colignon station). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 08:34, 11 July 2023 by Bobrayner (talk | contribs) (new article: Colignon station)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)Colignon station is a planned Brussels Metro station, on line 3, between Liedts station and Verboekhoven station.
The new Northern section of line 3, which includes Colignon station, is the most difficult part of the construction project. Completion could take ten years. In June 2023, Beliris asked for help from the Belgian government, following a series of delays and cost overruns. As of December 2022, construction of the new line was expected to be complete in 2032.
The station is next to Schaerbeek Municipal Hall.
Further reading
- (in Dutch) Colignon
References
- https://buur.be/en/project/voetgangerssimulatie-metrostation-collignon-brussel/
- https://www.thebulletin.be/stib-reveals-metro-3-line-could-take-10-years-complete
- https://www.railwaygazette.com/metros/funding-crisis-hits-brussels-metro-line-3-project/64330.article
- https://www.bruzz.be/actua/diepe-put-voor-metrostation-verboekhoven-2017-01-25
This article about a Belgian railway station is a stub. You can help Misplaced Pages by expanding it. |
This Brussels Metro article is a stub. You can help Misplaced Pages by expanding it. |