This is an old revision of this page, as edited by Bobrayner (talk | contribs) at 09:20, 11 July 2023 (+ complaints from residents). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 09:20, 11 July 2023 by Bobrayner (talk | contribs) (+ complaints from residents)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)Riga station is a planned Brussels Metro station, on line 3, between Linde / Tilleul and Verboekhoven station.
The station is on Avenue Huart Hamoir.
The design of Riga station had to be changed, after complaints from residents. The new Northern section of line 3, which includes Riga station, is the most difficult part of the construction project. Completion could take ten years. In June 2023, Beliris asked for help from the Belgian government, following a series of delays and cost overruns. As of December 2022, construction of the new line was expected to be complete in 2032.
Further reading
- (in Dutch) Riga
References
- https://www.arcadis.com/en/projects/europe/belgium/uitbreiding-metro-noord-brussel
- https://www.lesoir.be/115310/article/2017-09-21/une-station-de-metro-sous-leglise-de-helmet
- https://www.bruzz.be/mobiliteit/gezien-toekomstig-metrostation-verboekhoven-2019-01-22
- https://www.thebulletin.be/stib-reveals-metro-3-line-could-take-10-years-complete
- https://www.railwaygazette.com/metros/funding-crisis-hits-brussels-metro-line-3-project/64330.article
This article about a Belgian railway station is a stub. You can help Misplaced Pages by expanding it. |
This Brussels Metro article is a stub. You can help Misplaced Pages by expanding it. |