This is an old revision of this page, as edited by Jason Lagos (talk | contribs) at 14:19, 11 July 2023 (Added short description, tags, links & FR-NL translations as per Brussels naming conventions). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 14:19, 11 July 2023 by Jason Lagos (talk | contribs) (Added short description, tags, links & FR-NL translations as per Brussels naming conventions)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff) Planned metro station in Brussels, Belgium
Verboekhoven is a planned Brussels Metro station on line 3, between Colignon and Riga.
The station's design had to be changed after complaints from residents. The new northern section of line 3, which includes the station, is the most difficult part of the construction project. Completion could take ten years. In June 2023, Beliris asked for help from the Belgian Government, following a series of delays and cost overruns. As of December 2022, construction of the new line was expected to be complete in 2032.
The station's entrance will be a short distance from the Place Eugène Verboekhoven/Eugène Verboekhovenplein. Construction requires expropriation of two large buildings.
Further reading
- (in Dutch) Verboekhoven
References
- https://www.bruzz.be/mobiliteit/gezien-toekomstig-metrostation-verboekhoven-2019-01-22
- https://www.thebulletin.be/stib-reveals-metro-3-line-could-take-10-years-complete
- https://www.railwaygazette.com/metros/funding-crisis-hits-brussels-metro-line-3-project/64330.article
- https://www.bruzz.be/actua/diepe-put-voor-metrostation-verboekhoven-2017-01-25
This article about a Belgian railway station is a stub. You can help Misplaced Pages by expanding it. |
This Brussels Metro article is a stub. You can help Misplaced Pages by expanding it. |