Misplaced Pages

Dalanzadgad New Wastewater Treatment Plant

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by Chongkian (talk | contribs) at 04:57, 17 December 2024 (Created page with '{{Short description|Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia}} {{Use dmy dates|date=December 2024}} {{Infobox building | name = Dalanzadgad New Wastewater Treatment Plant | native_name = | native_name_lang = | logo = | logo_size = | logo_alt = | logo_caption = | image = | image_size = | image_alt = <!-- or |alt= --> | image_ca...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 04:57, 17 December 2024 by Chongkian (talk | contribs) (Created page with '{{Short description|Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia}} {{Use dmy dates|date=December 2024}} {{Infobox building | name = Dalanzadgad New Wastewater Treatment Plant | native_name = | native_name_lang = | logo = | logo_size = | logo_alt = | logo_caption = | image = | image_size = | image_alt = <!-- or |alt= --> | image_ca...')(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff) Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia

Dalanzadgad New Wastewater Treatment Plant
General information
Typewastewater treatment plant
Town or cityDalanzadgad, Ömnögovi
CountryMongolia
Coordinates43°36′50.1″N 104°29′00.7″E / 43.613917°N 104.483528°E / 43.613917; 104.483528
Groundbreaking4 January 2018
OpenedJune 2020
CostUS$21.17 million
Design and construction
Main contractorN A.B, S&A Trade, San and Baiguulamj

The Darkhan New Wastewater Treatment Plant is a wastewater treatment in Dalanzadgad, Ömnögovi Province, Mongolia.

History

The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.

Technical specifications

The plant has a water processing capacity of 3,000 m per day.

Finance

The plant was constructed with a cost of US$21.17 million. About 92% of the funding was provided by a loan from Asian Development Bank and the remaining 8% was provided by the Government of Mongolia.

See also

References

  1. ^ O., Onon (4 January 2018). "Construction of Wastewater Treatment Plant in Dalanzadgad begins". Mongolian National News Agency. Retrieved 17 December 2024.


Stub icon

This article about a building or structure in Mongolia is a stub. You can help Misplaced Pages by expanding it.

Categories: