This is an old revision of this page, as edited by Chongkian (talk | contribs) at 04:57, 17 December 2024 (←Created page with '{{Short description|Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia}} {{Use dmy dates|date=December 2024}} {{Infobox building | name = Dalanzadgad New Wastewater Treatment Plant | native_name = | native_name_lang = | logo = | logo_size = | logo_alt = | logo_caption = | image = | image_size = | image_alt = <!-- or |alt= --> | image_ca...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 04:57, 17 December 2024 by Chongkian (talk | contribs) (←Created page with '{{Short description|Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia}} {{Use dmy dates|date=December 2024}} {{Infobox building | name = Dalanzadgad New Wastewater Treatment Plant | native_name = | native_name_lang = | logo = | logo_size = | logo_alt = | logo_caption = | image = | image_size = | image_alt = <!-- or |alt= --> | image_ca...')(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff) Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia
Dalanzadgad New Wastewater Treatment Plant | |
---|---|
General information | |
Type | wastewater treatment plant |
Town or city | Dalanzadgad, Ömnögovi |
Country | Mongolia |
Coordinates | 43°36′50.1″N 104°29′00.7″E / 43.613917°N 104.483528°E / 43.613917; 104.483528 |
Groundbreaking | 4 January 2018 |
Opened | June 2020 |
Cost | US$21.17 million |
Design and construction | |
Main contractor | N A.B, S&A Trade, San and Baiguulamj |
The Darkhan New Wastewater Treatment Plant is a wastewater treatment in Dalanzadgad, Ömnögovi Province, Mongolia.
History
The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.
Technical specifications
The plant has a water processing capacity of 3,000 m per day.
Finance
The plant was constructed with a cost of US$21.17 million. About 92% of the funding was provided by a loan from Asian Development Bank and the remaining 8% was provided by the Government of Mongolia.
See also
References
- ^ O., Onon (4 January 2018). "Construction of Wastewater Treatment Plant in Dalanzadgad begins". Mongolian National News Agency. Retrieved 17 December 2024.
This article about a building or structure in Mongolia is a stub. You can help Misplaced Pages by expanding it. |