Misplaced Pages

Dalanzadgad New Wastewater Treatment Plant

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by Chongkian (talk | contribs) at 06:30, 17 December 2024 (add mn name). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 06:30, 17 December 2024 by Chongkian (talk | contribs) (add mn name)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff) Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia

Dalanzadgad New Wastewater Treatment Plant
Даланзадгад хотын шинэ цэвэрлэх байгууламж
General information
Typewastewater treatment plant
Town or cityDalanzadgad, Ömnögovi
CountryMongolia
Coordinates43°36′50.1″N 104°29′00.7″E / 43.613917°N 104.483528°E / 43.613917; 104.483528
Groundbreaking4 January 2018
OpenedJune 2020
CostUS$21.17 million
Design and construction
Main contractorN A.B, S&A Trade, San and Baiguulamj

The Darkhan New Wastewater Treatment Plant (

This template should not be used in citation templates such as Citation Style 1 and Citation Style 2, because it includes markup that will pollute the COinS metadata they produce; see Misplaced Pages:COinS.
This template should not be substituted.


This template uses Lua:

Usage

Lua error in Module:Lang/documentor_tool at line 59: attempt to index local 'content' (a nil value). The language template {{dalanzadgad New Wastewater Treatment Plant}} identifies Error: unrecognized language tag: zadgad New Wastewater Treatment Plant text: Template:Dalanzadgad New Wastewater Treatment Plant. The term or phrase is the only mandatory parameter. The text is formatted according to recommendations in Misplaced Pages:Manual of Style/Text formatting § Foreign terms; italics for languages that use the Latin alphabet, normal for others.

The template should generally be placed after the English translation of the foreign term or phrase.

The parameter |links=no prevents the language name from being linked.

The parameter |translit= allows for a romanization to be identified. The templates that have this parameter are listed here. (This parameter is not supported by lang-x templates for languages that are already written in Latin script.)

The parameter |lit= enables a literal translation (in English) to be given. It is being rolled out to these templates and so may be available for {{dalanzadgad New Wastewater Treatment Plant}}.

Parameters

TemplateData

This is the TemplateData for this template used by TemplateWizard, VisualEditor and other tools. See a monthly parameter usage report for Template:Dalanzadgad New Wastewater Treatment Plant in articles based on its TemplateData.

TemplateData for Dalanzadgad New Wastewater Treatment Plant

Indicates to readers the original form of a term or phrase in a foreign language.

Template parameters

ParameterDescriptionTypeStatus
Text1

The foreign text to display.

Stringrequired
Display linklinks link

Set to 'no' to disable the link to the article's language.

Booleanoptional
Literal translationlit translation

The literal translation of the foreign text.

Stringoptional
Transliterationtranslit

The transliteration of the foreign text, for languages that do not use the Latin alphabet. This field is ignored for languages that do use the Latin alphabet.

Stringoptional
Language labellabel

If 'none', suppresses language link and label. Other options may be available depending on the language.

Example
none
Lineoptional


See also

]) is a wastewater treatment in Dalanzadgad, Ömnögovi Province, Mongolia.

History

The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.

Technical specifications

The plant has a water processing capacity of 3,000 m per day.

Finance

The plant was constructed with a cost of US$21.17 million. About 92% of the funding was provided by a loan from Asian Development Bank and the remaining 8% was provided by the Government of Mongolia.

See also

References

  1. ^ O., Onon (4 January 2018). "Construction of Wastewater Treatment Plant in Dalanzadgad begins". Mongolian National News Agency. Retrieved 17 December 2024.


Stub icon

This article about a building or structure in Mongolia is a stub. You can help Misplaced Pages by expanding it.

Categories: