Misplaced Pages

UTY EMU-250

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by LandAndTree (talk | contribs) at 17:17, 24 December 2024. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 17:17, 24 December 2024 by LandAndTree (talk | contribs)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
UTY EMU-250
KTX-Eum (EMU-250)
In service2027- (planned)
ManufacturerHyundai Rotem
Constructed2025- (planned)
Entered service2027- (planned))
Number built42 vehicles (6 sets)
Number in service7 vehicles (1 sets) (April 2027-) (planned)
42 vehicles (6 sets) (September 2027-) (planned)
OperatorsUzbek Railways
Lines servedTashkent–Bukhara high-speed rail line (2027-) (planned)
Specifications
Width3,150mm
Height13.1t

UTY EMU-250 is the high-speed electric multiple unit trainset derived from the South Korean KTX family for Afrosiyob, Uzbekistan's high-speed rail line. The trains were manufactured in South Korea by Hyundai Rotem, marking the first time South Korean KTX trains have been exported overseas. This export model to Uzbekistan will be partially modified from the KTX-Eum to suit local conditions in the country.

History

On June 14, 2024, Hyundai Rotem won a KR\270 billion order for the Supply and Maintenance of Distributed Power High-Speed ​​rail' from the Uzbekistan Railways(UTY). Specifically, the company signed a contract to supply vehicles and provide maintenance (2 years of light maintenance and 9 months of heavy maintenance) to the Uzbek Railways, and the railways of both countries and the company of Hyundai Rotem signed a Memorandum of understanding (MOU) for high-speed rail operation and maintenance.

A total of 42 units (6 trains) of UTY EMU-250, based on the KTX-Eum model, will be delivered, with the first train scheduled for April 2027, and all 6 trains scheduled for operation in September of the same year.

Specifications

UTY EMU-250 is 175m long per train and can accommodate up to 389 seats. Also, KTX-Eum or EMU-250 will be improved according to the Uzbekistan's needs. The main differences are as follows.

UTY EMU-250 EMU-250
Formation 7 cars per train 6 cars per train
Class VIP room, business room, general room, etc. Premium Room, General Room
Broad gauge 1,520mm 1,435mm
Steps X

If the UTY EMU-250 is introduced in Uzbekistan, it will be the country's first Multiple unit. The reason for the addition of steps for boarding and disembarking inside the vehicle is that the station platform height in Uzbekistan is 200mm, which is relatively lower than in Korea.

The speed is 250 km/h. South Korean products account for 87% of vehicle parts.

References

  1. "시속 250㎞대 확장형 'KTX-이음' 우즈벡 달린다…첫 KTX 수출". Seoul Daily. 16 June 2024.
  2. ^ "KTX 세계진출 시작됐다…현대로템 KTX-이음 기반 국산차량 수출". Yonhap News Agency. 14 June 2024.
  3. "KTX 세계진출 시작됐다…현대로템 KTX-이음 기반 국산차량 수출". Yonhap News Agency. 14 June 2024.
Categories: