This is an old revision of this page, as edited by Garzfoth (talk | contribs) at 03:20, 7 May 2018 (infobox improvements, update stats). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 03:20, 7 May 2018 by Garzfoth (talk | contribs) (infobox improvements, update stats)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)Point Beach Nuclear Plant | |
---|---|
Point Beach Nuclear Plant | |
Location in Wisconsin##Location in the United States | |
Country | United States |
Location | Town of Two Creeks, Manitowoc County, near Two Rivers, Wisconsin |
Coordinates | 44°16′52″N 87°32′12″W / 44.28111°N 87.53667°W / 44.28111; -87.53667 |
Status | Operational |
Construction began | Unit 1: July 19, 1967 Unit 2: July 25, 1968 |
Commission date | Unit 1: December 21, 1970 Unit 2: October 1, 1972 |
Construction cost | $589.1 million (2007 USD) |
Owner | NextEra Energy Resources |
Operator | NextEra Energy Resources |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Westinghouse |
Thermal capacity | 2 × 1800 MWth |
Power generation | |
Units operational | 2 × 591 MW |
Make and model | WH 2-loop (DRYAMB) |
Nameplate capacity | 1182 MW |
Capacity factor | 93.24% (2017) 82.80% (lifetime) |
Annual net output | 9654 GWh (2017) |
External links | |
Website | Point Beach Nuclear Plant |
Commons | Related media on Commons |
[edit on Wikidata] |
Point Beach Nuclear Plant is a nuclear power plant located on Lake Michigan north of Two Rivers, Wisconsin, USA.
The plant is currently owned and operated by NextEra Energy Resources (prior to 2009 - FPL Energy), of Juno Beach, Florida. The plant was built by Wisconsin Electric Power Company (now We Energies, a subsidiary of Wisconsin Energy Corporation), and previously operated by the Nuclear Management Company.
NextEra Energy Resources purchased the plant from Wisconsin Electric Power Company in October 2007. As part of the sale, We Energies agreed to repurchase all of the power produced by the plant for at least 20 years. In 2000–2007 the plant was managed by the Nuclear Management Company.
This plant has two, two-loop Westinghouse pressurized water reactors. There is also a visitors' center located at the Point Beach plant. The original letter of intent to purchase a single 454 megawatt (MW) nuclear unit from Westinghouse Electric for a fixed-price was issued by Wisconsin Electric and Wisconsin Michigan Power Company (a Wisconsin Electric subsidiary) on December 30, 1965. The right was reserved to order a second, duplicate unit under the same terms. In May, 1966, the announcement was made that the plant would be built on a 1,200 acre site in the town of Two Creeks.
On November 28, 1966, following Public Service Commission of Wisconsin (PSCW) endorsement and a brief public hearing, Alfred Gruhl, Glenn Reed, and Sol Burstein turned the first symbolic spades of dirt for the official ground-breaking. In May, 1967, the Atomic Energy Commission (AEC), predecessor to the Nuclear Regulatory Commission (NRC), issued the official construction permit (number 32) for Point Beach Unit 1. The Unit 2 construction permit (number 47) was issued approximately a year later.
On October 5, 1970, the AEC issued its full-term, full-power Operating License (DPR-24) for Point Beach Unit 1. The loading fuel into the reactor commenced almost immediately. On November 2, 1970, operators achieved initial criticality, with the nuclear-powered electricity being produced for days later, on November 6. Full commercial service was reached on December 21, 1970, just 49 months from the initial groundbreaking ceremony. After delays from nuclear power opponents, Unit 2 was granted a full-term, full-power operating license (DPR-27) on March 8, 1973, almost 1 1/2 years behind the original schedule.
Due to steam generator tube degradation and failures caused by intergranular stress corrosion cracking, Unit 1 was operated at approximately 75-80% of full power from December, 1979 until October 1983, when replacement steam generators were installed. The Unit 2 steam generators were replaced in 1996-97.
In 2005, the approved the license renewal application for the Point Beach plant, extending the operating license from forty years to sixty. in 2011, the NRC approved a 17% increase in power output (a.k.a. extended power uprate) from both units. This entailed significant upgrades to several plant systems and components, including safety-related pumps and valves, as well as the turbine-generator sets.
Most of the power from this plant goes to the Green Bay area and communities along the Lake Michigan shoreline of Southeastern Wisconsin. The plant is connected to the grid by four 345 kV lines, one of which travels northwest towards Green Bay and then on to the We Energies North Appleton substation located about 12 miles north of Appleton, Wisconsin, and the other one interconnecting with the now-closed Kewaunee Nuclear Generating Station located a short distance away to the north from Point Beach. The other 345 kV lines going out of the plant go south towards Milwaukee. Several 138 kV lines going out of the plant supply electricity to the surrounding area.
Surrounding population
The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.
The 2010 U.S. population within 10 miles (16 km) of Point Beach was 19,975, a decrease of 6.7 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 777,556, an increase of 10.0 percent since 2000. Cities within 50 miles include Green Bay (28 miles to city center).
Seismic risk
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Point Beach was 1 in 90,909, according to an NRC study published in August 2010. This was tied for 62 in a list of 104 with #1 being most at risk.
References
- "EIA - State Nuclear Profiles". www.eia.gov. Retrieved 3 October 2017.
- "Wisconsin Energy Transfers Ownership of Point Beach Nuclear Plant to FPL Energy". 2007-10-01.
- "WEC History". www.wecenergygroup.com. Retrieved 2017-05-11.
- ^ 20th Anniversary Point Beach Nuclear Plant. Wisconsin Electric Power Company. 1991. pp. 1–2.
- 20th Anniversary Point Beach Nuclear Plant. Wisconsin Electric Power Company. pp. 35–36.
- "NextEra Energy Point Beach Fact Sheet" (PDF). NextEra Energy Resources.
{{cite web}}
: Cite has empty unknown parameter:|dead-url=
(help) - "RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-24" (PDF). NRC.gov.
{{cite web}}
: Cite has empty unknown parameter:|dead-url=
(help) - "RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-27" (PDF). USNRC.
{{cite web}}
: Cite has empty unknown parameter:|dead-url=
(help) - "Regulatory approval for Point Beach uprate". www.world-nuclear-news.org. Retrieved 2017-05-11.
- Matthew L. Wald (May 7, 2013). "As Price of Nuclear Energy Drops, a Wisconsin Plant Is Shut". The New York Times. Retrieved May 8, 2013.
- "Backgrounder on Emergency Preparedness at Nuclear Power Plants". NRC.gov. Archived from the original on 2006-10-02.
- Dedman, Bill (April 14, 2011). "Nuclear neighbors: Population rises near US reactors". msnbc.com. Retrieved May 1, 2011.
- Dedman, Bill (March 17, 2011). "What are the odds? US nuke plants ranked by quake risk". msnbc.com. Retrieved April 19, 2011.
- Hiland, Patrick (September 2, 2010). "Safety / Risk Assessment Results for Generic Issue 199" (PDF). msnbc.com. Office of Nuclear Regulatory Research.
External links
- NukeWorker
- "Wisconsin Nuclear Plants#Point Beach". Energy Information Administration, U.S. Department of Energy (DOE). September 1, 2010. Retrieved 2011-03-16.
- "Point Beach 1 Pressurized Water Reactor". Operating Nuclear Power Reactors. U.S. Nuclear Regulatory Commission (NRC). February 14, 2008. Retrieved 2008-11-21.
- "Point Beach 2 Pressurized Water Reactor". Operating Nuclear Power Reactors. NRC. February 14, 2008. Retrieved 2008-11-21.
Nuclear power in the United States | |
---|---|
NRC Region I (Northeast) | |
NRC Region II (South) | |
NRC Region III (Midwest) | |
NRC Region IV (West) | |
Converted | |
Closed |
|
Cancelled (incomplete list, whole plants only) |
|
Future | |