Caihong Bridge 彩虹桥 | |||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The artistic concourse of Caihongqiao Station | |||||||||||||||||||||||||||||||
Chinese name | |||||||||||||||||||||||||||||||
Simplified Chinese | 彩虹桥站 | ||||||||||||||||||||||||||||||
Traditional Chinese | 彩虹橋站 | ||||||||||||||||||||||||||||||
Literal meaning | Rainbow Bridge | ||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||
Other names | Caihongqiao (official name until 27 December 2024) | ||||||||||||||||||||||||||||||
Location | Liwan Road (荔湾路) and West Dongfeng Road (东风西路) Liwan District, Guangzhou, Guangdong China | ||||||||||||||||||||||||||||||
Coordinates | 23° 7′ 58″ N, 113° 14′ 26″ E, 23.132778, 113.240556 | ||||||||||||||||||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||||||||||||||||||||
Line(s) | |||||||||||||||||||||||||||||||
Platforms | 4 (1 island platform and 2 side platforms in Spanish solution format) | ||||||||||||||||||||||||||||||
Tracks | 6 | ||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||
Station code | 811 1116 | ||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||
Opened | 28 September 2022; 2 years ago (2022-09-28) (Line 8) 28 December 2024; 19 days ago (2024-12-28) (Line 11) | ||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
Caihong Bridge Station (simplified Chinese: 彩虹桥站; traditional Chinese: 彩虹橋站; pinyin: Cǎihóngqiáo Zhàn; Jyutping: Coihungkiu Zaam; lit. 'Rainbow Bridge') is an interchange station between Line 8 and Line 11 of the Guangzhou Metro. It is situated underground near the Southwest gate of the Liuhua Lake Park.
Due to construction delays, the station could not open with the rest of the northern extension of Line 8 in 2020 and was hence delayed to open on 28 September 2 years later. Line 11 opened at this station on December 28, 2024.
Station Layout
G | - | Exits |
L2 Concourse |
North Lobby (Lines 11 & 13; U/C) | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
Line 22 Lobby (U/C) | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities | |
Transfer Linkway (U/C) | Paid transfer link between Lines 8, 11, 13 & 22 | |
South Lobby (Lines 8) | Customer Service, Shops, Vending machines, ATMs | |
L3 Line 8 Mezzanine 11 and 13 platforms | ||
Line 8 Buffer Area | Station equipment | |
Platform 5 | 11 Outer Circle (Zhongshanba) | |
Island platform, doors open on the left for 11 & right for 13 | ||
Platform 8 | 13 reserved platform | |
Platform 7 | 13 reserved platform | |
Island platform, doors open on the left for 11 & right for 13 | ||
Platform 6 | 11 Inner Circle (Liuhua) | |
L4 8 Platforms Line 22 Mezzanine (U/C) | ||
Side platform, doors will open on the right for alighting only | ||
Platform 3 ↑ Platform 1 ↓ |
8 towards Jiaoxin (Xicun) | |
Island platform, doors will open on the left for boarding only | ||
Platform 2 ↑ Platform 4 ↓ |
8 towards Wanshengwei (Chen Clan Academy) | |
Side platform, doors will open on the right for alighting only | ||
Line 22 Buffer Area | Station equipment | |
L5 22 Platforms (U/C) |
Platform 10 | 22 towards Panyu Square (Fangcun) |
Island platform, doors will open on the left (U/C) | ||
Platform 9 | 22 towards Airport North (Terminal 2) (Guangzhou Railway Station) |
Exits
Exit letter | Exit location | Nearby | ||
---|---|---|---|---|
A | Xihua Road | Simachong Cultural square State Taxation Administration Guangzhou Liwan District Headquarters Guangzhou No.17 Middle School | ||
Exit B | U/C | Unopened | ||
Exit C | Dongfeng Road West | Liuhua Road Liuhua Lake Park Guangzhou Children’s Palace | ||
Exit D | Liwan Road | Caihong Cultural Square Guangzhou Bureau of Planning and Natural Resources |
Gallery
Future Developments
Caihongqiao station will have interchange with Line 13 Phase 2 by 2025. Cross-platform interchange will be utilised between lines 11 and 13 at 1 level above Line 8. The station will also interchange with Line 22 Northern extension by 2027 and its platforms will be 1 level below Line 8. Paid linkways linking all concourses between all 4 lines will be built at Basement 2 of the whole Caihongqiao station.
References
- "彩虹桥地铁站".
- "广州地铁八号线彩虹桥站将开通运营". 2022-09-26.
Liwan District | |
---|---|
Areas | |
Landmarks | |
Transport Metro stations | |
Education | |
This list is incomplete. Fangcun District was merged into Liwan in 2005. |