Misplaced Pages

1995 Base Realignment and Closure Commission

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "1995 Base Realignment and Closure Commission" – news · newspapers · books · scholar · JSTOR (September 2022) (Learn how and when to remove this message)

The 1995 Base Realignment and Closure Commission preliminary list was released by the United States Department of Defense in 1995 as part of the Base Realignment and Closure Commission. It recommended closing 32 major United States military bases.

Commissioners

Justification

Over the past 57 years military base closures have taken place though various processes. The Secretary of Defense implemented closures on an ad-hoc basis during 1961 - 1979. Individual service Chiefs and Congress strengthened its veto power for closures during 1980 to 1987. These changes lead to a few major bases being closed and none actually being closed. This being an issue, Congress finally granted authority to an independent Defense Base Closure and Realignment (BRAC) commission to work with the Department of Defense (DoD) to identify bases and installations to the executive and legislative branches for closure or realignment between 1988 and 1995. The BRAC had to responsibility of selecting which bases were to close throughout four rounds of base closures. Even though these BRAC actions represented a large amount of physical reductions in installations and associated units, the DoD continued to request more infrastructure cuts to offset reduced congressional funding for defense. Additional BRAC rounds were requested by the United States Department of Defense (DoD) because there continues to be a significant disparity between support structure capacity versus the number of units and associated military personnel levels. Congress however delayed providing additional BRAC legislation until the fall/winter of 2002.

DoD had reported to congress that billions of dollars could be saved annually if excess base infrastructure could be eliminated .

All three of the BRAC rounds of the 1990s (1991, 1993, and 1995) were authorized under the same law, Public Law 101-510.

Recommendations

Major facilities slated for closure included:

See also

References

  1. "97-305 -- Military Base Closures: A Historical Review from 1988 to 1995". everycrsreport.com. 18 October 2004.
  2. "Al Cornella" (PDF). archive.rcgov.org.
  3. "Kling, 79, was philanthropist, businessman". 5 August 2008.
  4. "2016, Major General Josue (Joe) Robles, Jr., USA (Ret.)". 26 August 2019.
  5. "Win or Lose, Communities Can be Proud". 7 July 1995.
  6. Kehl, B., & Rowley, Charles K. (2003). The Pentagon vs. Congress: The Political Economy of Military Base Closures during BRAC, ProQuest Dissertations and Theses.
  7. Webster, S., & Lyons, Donald I. (2004). National Patterns and Community Impacts of Major Domestic United States Military Base Closures, 1988--present, ProQuest Dissertations and Theses.
  8. "Prior BRAC".

External links

Categories: