Misplaced Pages

300 East station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

300 East
300 East platform
General information
Location2240 South 300 East
South Salt Lake, Utah
United States
Coordinates40°43′20″N 111°52′56″W / 40.72222°N 111.88222°W / 40.72222; -111.88222
Owned byUtah Transit Authority (UTA)
Platforms2 side platforms
Tracks2
Construction
Structure typeAt-grade
AccessibleYes
History
OpenedDecember 8, 2013; 11 years ago (2013-12-08)
RebuiltJune 2018–April 2019; 5 years ago (2019-04)
Services
Preceding station Utah Transit Authority Following station
South Salt Laketoward Central Pointe S Line 500 Easttoward Fairmont
Location

300 East is a streetcar stop in South Salt Lake, Utah, served by Utah Transit Authority's (UTA) S Line (previously known as the Sugar House Streetcar). The S Line provides service from the Sugar House neighborhood of Salt Lake City to the city of South Salt Lake (where it connects with UTA's TRAX light rail system).

Description

The 300 East stop is located at 2240 South 300 East, immediately east of South 300 East. The two side platforms are located on the far north and south sides of the tracks. There is very limited street-side parking possible nearby. The stop began service on December 8, 2013 and is operated by Utah Transit Authority.

When the S Line opened in December 2013, the line was almost entirely single-tracked, with passing tracks at the 500 East stop where the two cars typically operating on the line could pass each other. This layout enabled 20 minute frequencies on the line. In June 2017 it was announced that Salt Lake County would provide $4.5 million, and the federal government would provide $1.9 million through its Congestion Mitigation and Air Quality Improvement program, to double-track the portion of the S Line from just west of the 300 East stop, through to just east of the 500 East stop, enabling improved 15 minute frequencies on the line. Construction began in June 2018, and was completed in April 2019.

References

  1. Davidson, Lee (August 28, 2013). "Sugar House streetcar testing begins next week". The Salt Lake Tribune. Salt Lake City: MediaNews Group. Retrieved April 5, 2014.
  2. Wanek-Libman, Mischa (April 10, 2019). "UTA completes S-Line double track project". Mass Transit (magazine). Retrieved July 4, 2022.

External links

Media related to 300 East station at Wikimedia Commons


Utah Transit Authority
Rail lines
Bus Rapid Transit
Police
Former lines
Categories: