This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Building in Illinois, United States
300 West Adams Building | |
---|---|
Building from North East corner | |
Location within Central ChicagoShow map of Central Chicago300 West Adams Building (Illinois)Show map of Illinois300 West Adams Building (the United States)Show map of the United States | |
General information | |
Architectural style | Gothic Revival |
Location | Chicago Loop, Illinois |
Country | United States |
Coordinates | 41°52′47″N 87°38′09″W / 41.87972°N 87.63583°W / 41.87972; -87.63583 |
Completed | 1927 |
Owner | Alliance HSP |
Landlord | Adams Management LLC, Stone Real Estate Corp |
Technical details | |
Floor count | 12 |
Design and construction | |
Architect(s) | Jens J. Jensen |
Main contractor | McLennan Construction Company |
Website | |
http://www.300adams.com/# | |
References | |
The 300 West Adams Building (also 300 West Adams Street) is an office building in the West Loop area of Chicago, Illinois, United States. The twelve-story building was designed in the Gothic Revival architectural style, with architectural terracotta cladding. Built in the 1920s, the building was developed as part of the outward expansion of Chicago's business district from its historic core into former warehouse districts along the Chicago River.
Early history
Before the Chicago Fire, the area directly along the river was predominantly commercial warehouses. In April 1879, one such warehouse was constructed at the northwest corner of Adams Street and Franklin Street on the site of today's 300 West Adams. Originally it was built for the Armour-Dole Grain Company. Later the building was converted into a wholesale store for Carson Pirie Scott and Company. By 1905, the warehouse was surrounded by similar structures.
As commercial real estate pressure increased, the area saw a trend of redevelopment. With the completion of Union Station in 1925, Carson Pirie Scott began plans to create office space in place of their warehouse. In January 1926, Carson Piri Scott announced that their wholesale building at Adams and Franklin would be remodeled into a "High class office building," while retaining its six-story height. Only a few months later, the plan was revised to include the demolition of the existing structure and its replacement with an entirely new twelve-story office building.
Before ground had broken on the site, substantial space had already been leased to the U.S. Gypsum Co.; the R.G. Dun & Co.; the Transportation Freight Bureau, and the General Chemical Co.
The McLennan Construction company was the general contractor, and the building was completed by April 1, 1927.
References
- "300 West Adams". Emporis. Archived from the original on September 27, 2019. Retrieved September 27, 2019.
- "300 West Adams". Chicago Architecture Info. Archived from the original on September 27, 2019. Retrieved September 27, 2019.
- Mosena, David; Baird, John; Ellin, Phyllis; Raguso, Chris; Reed, Christopher; Scudiero, Patricia; Torrez, Edward; Weese, Ben; Wong, Ernest (February 2009). LANDMARK DESIGNATION REPORT 300 West Adams Street Office Building (PDF). COMMISSION ON CHICAGO LANDMARKS. p. 3.