Misplaced Pages

Adriatic–Ionian motorway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Future road in Europe
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Adriatic–Ionian motorway" – news · newspapers · books · scholar · JSTOR (December 2011) (Learn how and when to remove this message)
Adriatic–Ionian Motorway
Major junctions
FromTrieste, Italy
ToKalamata, Greece
Location
CountriesItaly, Slovenia, Croatia, Bosnia and Herzegovina, Montenegro, Albania, Greece
Major citiesTrieste, Rijeka, Split, Dubrovnik, Podgorica, Shkodër, Tirana, Gjirokastër, Ioannina, Patras, Kalamata
Highway system

Adriatic–Ionian motorway (Albanian: Autostrada Adriatiko-Joniane; Bosnian and Croatian: Jadransko-jonska autocesta; Montenegrin and Serbian: Jadransko-jonski autoput / Јадранско-јонски аутопут; Greek: Aftokinitodromos Adriatikis-Ioniou; Italian: Autostrada Adriatico-Ionica) or the Blue Corridor, is a future motorway that will stretch along the entire eastern shore of the Adriatic and Ionian seas, spanning the western coast of the Balkan Peninsula from Italy in the north through Slovenia, Croatia, Montenegro, Albania to Greece in the south.

Overview

The road is planned to be built to full motorway standards. It will start in Trieste, Italy, pass through Slovenia, enter Croatia near Rijeka, and continue through Croatia as part of A1 motorway. The road will be connected to Montenegro through Croatia if via Pelješac Bridge. Passing Ulcinj, the motorway will enter Albania south of Lake Skadar, and continue south, passing Shkodër, Tirana, Rrogozhinë, Fier and Gjirokastër. Exiting Albania, the motorway will follow the A5 motorway in Greece, ending at Kalamata.

The road is seen as a matter of national importance to Croatia, Montenegro and Albania. Those countries have launched an initiative to list the motorway with Pan-European corridors in order to be able to secure foreign funding.

Italy

With starting of Adriatic–Ionian motorway at Trieste, the already existing feeder road RA 13 to the Slovenian border is used. The RA 13 is connected to the Slovenian A3 highway.

Slovenia

The Slovenian section starts with the already existing A3 from the Italian border at Sežana to the interconnection with the A1. The further route is not planned yet, but will lead to the Croatian border near Jelšane where it will be connected with the Croatian A7 highway. Until construction of that part, the traffic is passed over a national road.

Croatia

Krka River Bridge at Skradin
Krka River Bridge carrying the A1 motorway south of Skradin, in immediate vicinity of Krka National Park

In Croatia, the Adriatic–Ionian motorway is planned to follow routes of the A7 motorway along its entire length, and the A1 motorway from the Žuta Lokva interchange to the Border crossing Nova Sela.

So far, Croatia has made the biggest progress on its section by completing significant parts of the A7 motorway and the A1 motorway.

The A7 is completed from the Slovenian border at Rupa, bypassing Rijeka and connecting to the A6. Construction of the part from this junction to a planned interchange with the A1 at Žuta Lokva is currently slowed down and planned as a long-term project. Until completion of this sector, the traffic may either use an indirect route to the A1 via the A6 motorway (to the junction of the A1 and A6 motorways at Bosiljevo 2 interchange) or a more direct route to the A1 via the D8 state road (also known as Adriatic Highway).

Adriatic-Ionian motorway follows the route of the A1 motorway from the Žuta Lokva interchange to the Border crossing Nova Sela where it connects to the A1 motorway in Bosnia and Herzegovina.

Route
Road Section Length Status
A7 border Slovenia / Rupa - Matulji 16 km completed
Matulji - Orehovica 12 km completed (cca 135 km from Orehovica taking the existing motorway A6/A1 via Bosiljevo to Žuta Lokva)
Orehovica - Sveti Kuzam - Križišće 14 km completed
Križišće - Novi Vinodolski 17.5 km competition for construction underway
Novi Vinodolski bypass 6.5 km under construction as two-lane road; in future to be upgraded on four-lane
Novi Vinodolski - Senj 21 km design started in 2023
Senj - Žuta Lokva 10.8 km planned
A1 Žuta Lokva - Zadar - Split - Nova Sela 360 km completed

Bosnia and Herzegovina

It has not yet been defined whether a motorway will pass through southern Bosnia and Herzegovina near Trebinje. A route passing through the Trebinje field would require approval of both the Herzegovina-Neretva Canton and Republika Srpska.

Montenegro

Main article: Motorways in Montenegro
Corridors of future motorways in Montenegro. Adriatic - Ionian motorway is marked in blue

In the Spatial Plan of Montenegro, route of the Adriatic – Ionian motorway is currently defined as following:

Thus, Government of Montenegro has considered only the option of motorway crossing southern Bosnia and Herzegovina near Trebinje. A parallel expressway along the coast is also planned, that will connect directly to Croatian road network at Debeli Brijeg, however, this is not considered a part of Adriatic – Ionian route, and will not be built to full motorway standard. This route is intended to relieve Adriatic Highway, and will follow the Montenegrin coastline closely, with Verige bridge included in its route.

Approximate length of motorway through Montenegro is 100 km, of which 10 km between Mareza and Smokovac is shared with Belgrade–Bar motorway.

Building of the Belgrade–Bar motorway is currently a priority for Montenegro, and concrete activities on building Adriatic – Ionian motorway are yet to begin.

Albania

Main article: Highways in Albania

Albania has mostly completed its north-south corridor (SH1 and SH4) connecting Montenegro with Greece. Remaining parts of the corridor are planned to be expanded to full motorway standard like building new sections between Muriqan/Sukobin border crossing to SH1 at Bushat south of Shkodër, Thumane-Kashar-Rrogozhinë highway part of Milot-Fier upgrade to motorway standard linking with Fier Bypass, and expanding SH4 south of Fier with slight deviation at Pocem near Memaliaj. The motorway in Albania will pass on the current stretch along the western lowland, bypass Tirana through newly planned Thumane-Kashar-Rrogozhine motorway, continue south on the existing SH4, and enter inland at Fier towards Tepelene and Gjirokaster. Less than half of the above segments are single carriageways known as superstradë, while segments SH4 Rrogozhine-Fier and A1 Milot-Thumanë have been widened to dual carriageways known as autostradë.

routing
road stretch distance status
SH1 Montenegro border / Muriqan - Bushat ca. 20 km new section planned between Muriqan/Sukobin border crossing and SH1 at Melgushe near Bushat, south of Shkodër
SH1 Melgushe - Balldren - Milot ca. 45 km completed as single carriageway, to be expanded to motorway standard, new Lezhë Bypass section in the form of tunnel at Balldren.
A1 Milot - Thumane ca. 14 km completed as a dual carriageway (autostradë)
A1 Thumane - Kashar ca. 21 km completed as a dual carriageway (autostradë)
SH2 - SH85 - SH4 Kashar - Rrogozhine ca. 55 km new section planned to link Tirana with current SH4 at Rrogozhine
SH4 Rrogozhine - Fier (Levan) ca. 60 km completed as a dual carriageway (autostradë), Fier Bypass is completed
SH4 Fier (Levan) - Fratar ca. 52 km completed as a single carriageway (superstradë)
SH4 Fratar - Memaliaj ca. 28 km new section to be constructed deviating from current SH4
SH4 Memaliaj - Tepelene - Gjirokaster ca. 35 km completed as a single carriageway (superstradë), Tepelene and Gjirokaster Bypasses to be completed
SH4 Gjirokaster - Kakavija / Greece border ca. 30 km completed as a single carriageway (superstradë)


Greece

In Greece the Adriatic-Ionian motorway follows the GR-5 from the Albanian Border at Kakavia up to Ioannina, a section planned to be upgraded to a motorway. From there it follows the A5 motorway (Ionia Odos) up until Antirrio where it crosses the Corinthian Gulf via the Rio-Antirrio bridge to meet the A8 motorway (Olympia Odos) at Rio.

From Rio to Pyrgos, another motorway (which is going to be the extension of the Olympia Odos-A5), is under construction to replace that section of the existing national road GR-9. The other section from Pyrgos to Kalo Nero is delayed due to environmental concerns about the Kaiafas Lake. The Kalo Nero - Tsakona road is a branch of the GR-9 and it leads to the intersection with the A7 motorway, near the city of Kalamata.

routing
road stretch distance status
N22 Albania border / Kakavia - Ioannina (A2 junction) ca. 50 km National road, upgrade to motorway planned
A5 Ioannina (A2 junction) - Filippiada ca. 50 km Completed in August 2017
A5 Filippiada - Arta south (Arta bypass) ca. 17 km Completed in 2003
A5 Amfilochia - Arta ca. 34 km Completed in August 2017
A5 Kouvaras - Amfilochia ca. 26 km Completed in December 2016
A5 Kouvaras - Etoliko (Agrinio bypass) ca. 34 km Completed in May 2009
A5 Etoliko - Antirrio ca. 45 km Completed in June 2017
A5 Antirrio - Rio (Rio-Antirrio bridge) ca. 5 km Completed in 2004
A5 Rio - Mintilogli (Patras bypass) ca. 20 km Completed in 2002
TBD Mintilogli - Pyrgos ca. 75 km Completion due in 2025
TBD Pyrgos - Kalo Nero ca. 50 km Delayed because of environmental concerns
TBD Kalo Nero - Tsakona ca. 30 km To be upgraded to motorway

See also

References

  1. Ravlić, Anto (3 January 2024). "HAC raspisao natječaj: traži se izvođač za dionicu Križišće – Selce" [HAC has announced a tender: a contractor is wanted for the section Križišće - Selce]. Tunera (in Croatian). Retrieved 4 January 2024.
  2. Deranja, Franjo (11 September 2021). "Projekt obilaznice Novog Vinodolskog će riješiti ljetne prometne zastoje: Evo planova i rokova gradnje" [The Novi Vinodolski bypass project will solve summer traffic jams: Here are the plans and deadlines for construction]. Novi List (in Croatian). Retrieved 10 October 2021.
  3. "Odbijena žalba na natječaj za gradnju novljanske obilaznice" [The appeal against the tender for the construction of the Novi bypass was rejected]. točkanai.hr (in Croatian). 25 June 2021. Retrieved 19 May 2023.
  4. "Izrada projektne dokumentacije i provedba upravnog postupka do lokacijske dozvole za autocestu A7, dionica Senj - Žuta Lokva" [Creation of project documentation and implementation of the administrative procedure for the location permit for the A7 highway, section Senj - Žuta Lokva]. Hrvatske Autoceste (in Croatian). Retrieved 14 December 2023.
  5. ""Autostrada blu" na kushton 2.2 MLD Euro". 18 April 2019.

External links

Categories: