Aghajari Gas Injection Project

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article needs to be updated. Please help update this article to reflect recent events or newly available information. (November 2010)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Aghajari Gas Injection Project" – news · newspapers · books · scholar · JSTOR (March 2009) (Learn how and when to remove this message)
(Learn how and when to remove this message)
It has been suggested that this article be merged into National Iranian South Oil Company. (Discuss) Proposed since December 2024.

Aghajari Gas Injection Project is the world’s biggest enhanced oil recovery) project to be inaugurated in Iran in late 2008.

The reservoir dimension of Aghajari fields is 56×6 km with the original oil-in-place of 28 billion barrels (4.5×10 m) and 10.2 billion barrels of recoverable oil (based on latest studies). The total quantities extracted since the start of operations at Aghajari till this date have been 8.8 bn barrels.

However, production has been on the decline because of loss of pressure and oil extraction, so that current output is 180,000 barrels (29,000 m) a day.

With injection of 3.6 billion cubic feet (100,000,000 m) of gas per day (20 trillion cubic feet (570 km) of gas in total) from the south pars field and subsequent buildup of pressure, an additional quantity of 1.2 billion barrels (190,000,000 m) of oil will be produced. It is also estimated that daily crude oil output of the field will increase to 300,000 barrels per day (48,000 m/d).

Project consists of three main parts;

  • Upstream:

Development of South Pars phases 6, 7 and 8.

  • Midstream:

The 504-km long, 56-inch pipeline for transfer of sour gas from the South Pars gas field phases 6,7 and 8 to be injected to Aghajari oilfield.

  • Downstream:

Installation of a gas-compression station, drilling of 19 new wells, work over of 3 existing wells for gas injection, installing pipelines on 2 existing gas injecting wells.