Misplaced Pages

Atiak–Laropi Road

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Ugandan road

Atiak–Laropi Road
Route information
Length41 mi (66 km)
HistoryDesignated in 2020
Completion in 2023 (Expected)
Major junctions
South endAtiak
Major intersectionsZapi
Adjumani
North endLaropi
Location
CountryUganda
Highway system

The Atiak–Laropi Road is a road in the Northern Region of Uganda. The road connects the urban centers of Atiak, in Amuru District to Adjumani, in Adjumani District to end in the town of Laropi, in Moyo District.

Location

The road starts at Atiak and continues in a general northwesterly direction, through the towns of Zapi, Pekelle and Adjumani, to end at the shores of the Albert Nile at Laropi, in Moyo District, a total distance of approximately 66 kilometres (41 mi).

Overview

The Atiak–Laropi Road, is a component of the 105 kilometres (65 mi) Atiak–Adjumani–Moyo–Afoji Road. The gravel-surfaced road is dusty and pot-holed during the dry season. In the rainy season, the road develops gullies and presents navigational challenges.

Upgrading to bitumen

The upgrade of the road to grade II bitumen standard, with culverts, shoulders and drainage channels began in 2020. The work was contracted to Strabag International, a construction multinational, headquartered in Vienna, Austria. The construction bill is calculated at €54 million, jointly funded by the government of Uganda (10 percent) and the European Development Fund (90 percent). Work started in March 2020, with completion expected in 2023. The work includes the construction of landing piers on both banks of the Albert Nile, one at Umi, Adjumani District and another, directly across the river at Laropi, Moyo District.

The engineering supervision contract, worth €3.8 million (UGX:15.5 billion), was awarded to Eptisa Engineering Services (Spanish: Eptisa Servicios de Ingenieria SL), a company from Spain. Civil works were commissioned on 11 September 2020. Completion is expected in 2023.

See also

References

  1. "Map Showing Atiak–Laropi Road in the Town of Pakelle, Adjumani District" (Map). Google Maps. Retrieved 5 July 2020.
  2. ^ Strabag (13 January 2020). "Upgrading of Atiak–Laropi Road (66 km) to Paved Standard". Vienna, Austria: Strabag SE. Retrieved 5 July 2020.
  3. Felix Warom Okello and Scovin Iceta (21 November 2015). "President to compensate Moyo locals". Daily Monitor. Kampala. Retrieved 5 June 2020.
  4. M.J. Woof (13 February 2020). "Strabag Wins Uganda Road Contract". World Highways. Retrieved 5 July 2020.
  5. Alon Mwesigwa (2 December 2019). "Spanish Firm Wins Tender to Supervise Atiak-Laropi Road Construction". Kampala: Uganda Radio Network. Retrieved 5 June 2020.
  6. Scovin Iceta (15 September 2020). "Joy as Atiak road works begin". Daily Monitor. Kampala. Retrieved 15 September 2020.

External links


Amuru District
Capital: Amuru
Towns and villages
Geography
  • Unyama River
Economy
Transport
Notable people
Adjumani District
Capital: Adjumani
Towns and
villages
Geography
Economy
Transport
Health
Notable people
Moyo District
Capital: Moyo
Towns and
villages
Geography
Economy
Energy
Health
Transport
Notable people

03°23′28″N 31°57′05″E / 3.39111°N 31.95139°E / 3.39111; 31.95139

Categories: