Baogang Dadao 宝岗大道 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 宝岗大道站 | ||||||||||
Traditional Chinese | 寶崗大道站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Haizhu District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 8 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
History | |||||||||||
Opened | 3 November 2010 | ||||||||||
Services | |||||||||||
| |||||||||||
Baogang Dadao Station (Chinese: 宝岗大道站; lit. 'Baogang Avenue station'), known as Changgang Zhonglu Station (昌岗中路站) during planning, is a metro station on Line 8 of the Guangzhou Metro. The underground station is located on Changgang Middle Road in the Haizhu District. The station opened on November 3, 2010 after a delay caused by the cooling tower at Shayuan Station.
Station layout
G | - | Exits |
L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
L2 Platforms |
Platform 1 | 8 towards Jiaoxin (Shayuan) |
Island Platform, doors will open on the left | ||
Platform 2 | 8 towards Wanshengwei (Changgang) |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Changgang Zhonglu | |
Exit C | Changgang Zhonglu | |
Exit D | Baogang Dadao |
References
- simplified Chinese: 昌岗中路; traditional Chinese: 昌崗中路; pinyin: Chānggǎng Zhōnglù; Jyutping: coenggong zunglou
- 沙园站冷却塔昨复工 (in Simplified Chinese). 2010-09-02.
23°05′10″N 113°16′10″E / 23.08601°N 113.26937°E / 23.08601; 113.26937
Categories: