The Bazhong–Dazhou railway (Chinese: 巴达铁路) is a railway line in Sichuan, China.
History
Construction on the line began on 27 September 2009. It opened on 10 January 2016.
Specification
At Bazhong railway station the line continues as the Guangyuan–Bazhong railway. The line joins the Xiangyang–Chongqing railway north of Dushi railway station. The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph).
References
- ^ "巴达铁路正式通车 巴中到重庆仅5个多小时". Sina (in Chinese). 2016-01-11. Archived from the original on 2016-09-17. Retrieved 2021-12-03.
- "巴达铁路正式通车" (in Chinese). CTN. 2016-01-11. Retrieved 2021-12-03.
- "巴达铁路(达州段)建设工程全速推进". The People's Government of Sichuan Province (in Chinese). 2011-05-09. Archived from the original on 2011-10-28. Retrieved 2021-12-06.