This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Bebington railway station" – news · newspapers · books · scholar · JSTOR (October 2024) (Learn how and when to remove this message) |
Bebington | |||||
---|---|---|---|---|---|
A Merseyrail Class 508 at Bebington. | |||||
General information | |||||
Location | Bebington, Wirral England | ||||
Coordinates | 53°21′27″N 3°00′11″W / 53.3574°N 3.0031°W / 53.3574; -3.0031 | ||||
Grid reference | SJ333850 | ||||
Managed by | Merseyrail | ||||
Transit authority | Merseytravel | ||||
Platforms | 2 | ||||
Other information | |||||
Station code | BEB | ||||
Fare zone | B1 | ||||
Classification | DfT category E | ||||
Passengers | |||||
2019/20 | 1.003 million | ||||
2020/21 | 0.279 million | ||||
2021/22 | 0.678 million | ||||
2022/23 | 0.750 million | ||||
2023/24 | 0.806 million | ||||
|
Bebington railway station serves the town of Bebington in Merseyside, England. The station is situated on the Chester and Ellesmere Port branches of the Wirral Line, forming part of the Merseyrail network.
History
The station is on the former Chester and Birkenhead Railway, opening in 1840 as Bebington before being renamed 'Bebington and New Ferry' on 1 May 1895.
The name was changed back to just Bebington on 6 May 1974.
Direct train services to Liverpool began in 1985, when the line between Rock Ferry and Hooton was electrified; previously passengers for Liverpool had to change at Rock Ferry. Further electrification in the early-1990s allowed electric train services to be extended, first to Chester in 1993 and then Ellesmere Port in 1994.
In June 2014 it was announced that the station would be among a small number across the Merseyrail network that would be renovated as part of a £3.7m programme of improvements, namely refurbishment and improvement of passenger areas, lighting and CCTV coverage. Between February and March 2015, the subway leading to Platform 1 was refurbished. An electronic information board was also added at the street entrance.
Facilities
The station is staffed during all opening hours and has platform CCTV. There is a payphone, a vending machine and a booking office. There are live departure and arrival screens on the platform, for passenger information. Each of the two platforms has sheltered seating. The station has a free car park, with 24 spaces and also a cycle locker with 25 spaces. Access to the station and both platforms is by ramp, allowing easy access for passengers with wheelchairs or prams.
Services
Trains operate every 15 minutes between Chester and Liverpool on weekdays and Saturdays, until late evening when the service becomes half-hourly, as it is on Sundays. Additionally there is a half-hourly service between Liverpool and Ellesmere Port all day, every day. Northbound trains operate via Birkenhead Hamilton Square station in Birkenhead and the Mersey Railway Tunnel to Liverpool. Southbound trains all proceed as far as Hooton, where the lines to Chester and Ellesmere Port divide. These services are all provided by Merseyrail's fleet of Class 507 and Class 777 EMUs.
References
- Slater, J.N., ed. (July 1974). "Notes and News: Stations renamed by LMR". Railway Magazine. 120 (879). London: IPC Transport Press Ltd: 363. ISSN 0033-8923.
- Bebington Subway Closure
- Station Facilities for Bebington Accessed 2013-12-20
- Bebington train station facilities, Merseyrail Accessed 2013-12-20
- Bebington Station Plan Archived 20 December 2013 at the Wayback Machine Accessed 2013-12-20
- "Wirral Line timetable" (PDF). Merseyrail. Archived from the original (PDF) on 19 December 2013. Retrieved 18 December 2013.
Further reading
- Mitchell, Vic; Smith, Keith (2012). Chester to Birkenhead. Middleton Press. figs. 61-62. ISBN 9781908174215. OCLC 811323335.
External links
- Train times and station information for Bebington railway station from National Rail
- Station information for Bebington railway station from Merseyrail
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Port Sunlight towards Chester or Ellesmere Port |
Merseyrail Wirral Line Ellesmere Port/Chester |
Rock Ferry Liverpool Central | ||
Historical railways | ||||
Port Sunlight Line and station open |
GWR & LNWR Chester and Birkenhead Railway |
Rock Lane Line open, station closed |
Merseyrail Wirral Line stations | |
---|---|
New Brighton Branch | |
West Kirby Branch | |
Northern Branch | |
Liverpool Loop | |
Southern Branch | |
Chester Branch | |
Ellesmere Port Branch |