Misplaced Pages

Bekasi Line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Bekasi Line (Greater Jakarta LRT)) Light rapid transit line in Indonesia
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Bekasi Line" – news · newspapers · books · scholar · JSTOR (May 2020) (Learn how and when to remove this message)
Not to be confused with KAI Commuter Cikarang Loop Line, formerly called Bekasi Line.
Bekasi Line
One of the trainsets preparing to board passengers at Jatimulya Station
Overview
Other name(s)Service line 3 of LRT Jabodebek (working name)
Native nameLin Bekasi
StatusOperational
OwnerMinistry of Transportation
LocaleJakarta, West Java
Termini
Stations22 (14 operational, 8 planned)
Service
TypeLight rapid transit
SystemJabodebek LRT
Services1
Operator(s)Kereta Api Indonesia
Depot(s)Jatimulya
History
OpenedAugust 28, 2023 (2023-08-28)
Completed2022
Technical
Line length29.54 km (18.36 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC Third rail system
Route map

Legend
planned extension to Grogol
BNI City
Dukuh Atas BNI
Sudirman
DA Dukuh Atas BNI
ST Setiabudi
RS Rasuna Said
KN Kuningan
Jakarta Inner Ring Road
PC Pancoran Bank BJB
CK Cikoko
Cawang
CL Ciliwung
CW Cawang
to Harjamukti
Jagorawi Toll RoadJIRR
Jakarta-Cikampek Toll Road
HL Halim High-speed rail in Indonesia
Special Capital Region of Jakarta
West Java
JB Jati Bening Baru
CR Cikunir 1
Jakarta Outer Ring Road
CR 2 Cikunir 2
BB Bekasi Barat
JM Jati Mulya
Jatimulya Depot
This diagram:

The Jabodebek LRT Bekasi Line (Indonesian: LRT Jabodebek Lin Bekasi) is one of the two light rapid lines of the Jabodebek LRT which serves trips from Dukuh Atas station to Jatimulya station. The distance traveled in this fully-elevated line is 29.54 km.

The Pancoran–Jatimulya section of the line runs along the Jakarta Inner Ring Road, Jakarta–Cikampek Toll Road, and the Jakarta–Cikampek Elevated Toll Road.

History

Main article: Jabodebek LRT § Background
The elevated route is built parallel with the Jagorawi Toll Road.

Like other public transportation systems in Jabodetabek area, the Jabodebek LRT system was built to break down congestion. The construction of the Cawang–Bekasi LRT Line and other lines in the first phase of the Jabodebek LRT construction began with the groundbreaking on 9 September 2015 by President Joko Widodo.

Initially the phase 1 was targeted to be completed before the 2018 Asian Games. However, until the Asian Games were held, the overall progress was still 45%, thus it was unable to be commercially run as targeted.

On October 11, 2019, the first train of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from INKA factory in Madiun, East Java. For the time being, the train has been parked near Harjamukti station of the Cibubur Line; considering that the LRT depot construction in Jatimulya, which is this line's terminus, has not yet been completed.

In October 2020, the Jabodebek LRT trains began their trials.

Network

Route

The Bekasi Line has a track length of 29.54 kilometers. Most of the trajectory of this route is using an elevated structure. From Dukuh Atas to Cawang, this line shares the route with Cibubur Line, goes along Jalan Rasuna Said then turns to the south side of the Jakarta Inner Ring Road (Cawang–Pluit section). In Cawang station, the two lines split and the line follows the Jakarta–Cikampek Toll Road alignment. The network's depot is located at the Jatimulya terminus, thus the tracks continue to Jatimulya depot after the Jatimulya station.

List of stations

Station Transfer/Notes Location
Number Name City/Regency Province
Phase 1: Bekasi–Dukuh Atas
BK01 CB01 Dukuh Atas BNI Terminus station.

Dukuh Atas BNI

Sudirman

BNI City

Dukuh Atas (Planned)

List of Transjakarta corridors#Corridor 1 List of TransJakarta corridors#Cross-corridor routes Dukuh Atas

List of Transjakarta corridors#Corridor 4 List of TransJakarta corridors#Corridor 6 Galunggung

South Jakarta Jakarta
BK02 CB02 Setiabudi List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 6 List of TransJakarta corridors#Cross-corridor routes Setiabudi
BK03 CB03 Rasuna Said List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 6 List of TransJakarta corridors#Cross-corridor routes Rasuna Said
BK04 CB04 Kuningan List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 6 List of TransJakarta corridors#Cross-corridor routes Kuningan

(PT) Kuningan (Planned)

BK05 CB05 Pancoran Bank BJB List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Pancoran
BK06 CB06 Cikoko Cawang

List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Cikoko

BK07 CB07 Ciliwung List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Ciliwung East Jakarta
BK08 CB08 Cawang Interchange station to

List of Transjakarta corridors#Cross-corridor routes List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 7 List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Cawang

BK09 Halim Halim

Halim (Planned)

BK10 Jati Bening Baru Bekasi West Java
BK11 Cikunir 1
BK12 Cikunir 2
BK13 Bekasi Barat  K1  Stasiun LRT Bekasi Barat

 K1  Lobby Revo Mall

(BE) Bekasi Barat (Planned)

BK14 Jati Mulya Terminus station. Bekasi Regency
Phase 2: Jati Mulya–Cibatu (under feasibility study)
Tambun Selatan Bekasi Regency West Java
Lambangsari
Cibuntu
Danau Indah
Cikarang Barat (LT) Cikarang Barat (Planned)
Cibatu

Future development

According to current JUTPI 3 proposal, Bekasi Line will be extended to South Cikarang in Bekasi Regency.

References

  1. "Cara Naik LRT Jabodebek yang Baru Diresmikan Jokowi Hari Ini". CNN Indonesia (in Indonesian). August 28, 2023. Retrieved August 29, 2023.
  2. "Proyek LRT Jabodebek Molor ke 2022" (in Indonesian). June 5, 2020. Retrieved June 27, 2020.
  3. Lidyana, Vadhia. "Penampakan LRT Jabodebek yang Tiba di Jakarta". detikfinance (in Indonesian). Retrieved January 4, 2023.
  4. "Fakta-Fakta Terbaru LRT Jabodebek, Termasuk Tarif Rp12.000 Semua Halaman". merdeka.com. October 15, 2019. Retrieved January 4, 2023.
  5. Media, Kompas Cyber (July 27, 2019). "Panduan Lengkap LRT Jabodebek, Rute dan Stasiun". KOMPAS.com (in Indonesian). Retrieved January 4, 2023.
Indonesia Urban transit in Indonesia
National
Perum DAMRI
Teman Bus [id]
BisKita [id]
Sumatra
Aceh
North Sumatra
South Sumatra
West Sumatra
Other
Java
Greater Jakarta
Rail
Bus
Banten
West Java
Central Java
Yogyakarta
East Java
Bali
(Lesser Sunda Islands)
Kalimantan
West Kalimantan
Central Kalimantan
East Kalimantan
South Kalimantan
Sulawesi
Papua
(Western New Guinea)
Other
Note
Except Transjakarta, BRT in Indonesia is commonly merely a bus with shelter and not isolated from traffic.
Urban rail transit in Southeast Asia
Indonesia Indonesia
Java
Sumatra
Lesser Sunda Islands
Laos Laos
Malaysia Malaysia
Peninsular Malaysia
East Malaysia
Myanmar Myanmar
Philippines Philippines
Luzon
Visayas
Mindanao
Singapore Singapore
Thailand Thailand
Bangkok Metropolitan
Provincial
Vietnam Vietnam
Note: Under construction & planned lines are in Italics
Categories: