Belgrade tram network | |||
---|---|---|---|
CAF Urbos and Tatra KT4 trams at Block 45 | |||
Overview | |||
Owner | GSP Belgrade | ||
Locale | Belgrade, Serbia | ||
Transit type | Tram | ||
Number of lines | 10 lines and 2 temporarily discountinued (all daytime) Same as in 2022 | ||
Website | GSP (in Serbian) | ||
Operation | |||
Began operation | 14 October 1892 (horse tram) 5 June 1894 (first electric tram) 1904 (fully electric tram grid) | ||
Operator(s) | GSP Belgrade | ||
Number of vehicles | 197 trams and 32 trailers as of 2023 2 trams and 1 trailer less than in 2022 | ||
Technical | |||
System length | Network length-double track: 47 km (29 mi) Line length: 131.4 km (81.6 mi) Same as in 2022 | ||
Track gauge | 1,000 mm (3 ft 3+3⁄8 in) metre gauge | ||
Electrification | 600 V DC | ||
|
The Belgrade tram system is a 1000 mm gauge network that in 2021 had 12 routes running on 43.5 kilometres (27.0 mi) of (at least mostly double) track in the city of Belgrade, Serbia. It is operated with 231 trams, including ČKD Tatra KT4, CAF Urbos, and Duewag Be 4/6 trams. The first tram line was introduced on 14 October 1892. In the late 2000s, complete reconstruction of the system commenced.
Lines
As of late 2024, there are ten tram lines: six serve the larger part of the city on the right bank of Sava, while four reach New Belgrade on the left bank. All trams run during the daytime: the once-existing night lines have been abolished.
- Line 2 - Pristanište - Vukov spomenik - Pristanište. A famous circle line introduced in 1892, Line 2 runs around the city centre.
- Line 3 - Omladinski stadium - Kneževac. It was launched in 1894, reaching from Terazije to Topčider and temporarily closed in 2019 due to repairs on Patriarch Pavel Boulevard. It was supposed to be re-opened in summer 2024, but the reconstruction is yet to be finished.
- Line 3A - Beograd na vodi - Kneževac. It was established as a bus line replacing a part of Line 3 in 2019.
- Line 3L - Tašmajdan - Topčider railway station. The line was established on 12 July 2018 alongside bus line 38A to reach the station which then briefly served as the starting point of the Belgrade–Bar railway. The line was discountinued alongside line 3 in 2019, while the station was closed down in 2021.
- Line 5 - Kalemegdan /Donji Grad/ - Ustanička.
- Line 6 - Tašmajdan - Ustanička.
- Line 7 and Line 9 (Ustanička - Block 45 and Banjica - Block 45, respectively) were introduced on 1 January 1958, becoming the second and the third lines to connect the older part of the city to New Belgrade after Line 11. Both lines were re-routed to the Ada Bridge on 2 November 2024 after the Old Sava Bridge was shut down as 7L and 9L, respectively.
- Line 9A - Slavija Square - Block 45. This bus line was launched on 2 November 2024 to cover the area near Ušće and Blocks 21, 22 and 23 previously served by lines 7 and 9.
- Line 10 - Kalemegdan /Donji Grad/ - Banjica.
- Line 11 - Kalemegdan /Donji Grad/ - Block 45. It was established in 1984 as the first line reaching New Belgrade, having crossed Sava via the Old Sava Bridge. It was discontinued in 2012 because of low ridership and subsequently re-established in 2015, this time via the new Ada Bridge.
- Line 12 - Omladinski stadion - Banovo brdo. It was first introduced in 1932 between Prince Mihailo Monument and Dedinje By 1986, it was re-directed to connect Dimitrije Tucović Square, now known as Slavija Square to Banovo brdo. With line 3 temporarily shut down, it is the only line reaching Omladinski stadion.
- Line 13 - Banovo brdo - Block 45. Likewise, it was originally launched in 1932 to serve older parts of Čukarica and then discountinued in 1969. It was reestablished in 1986 as a line between Banovo brdo and Kalemegdan, and then re-routed again towards Block 45.
- Line 14 - Ustanička - Banjica.
Former lines
On current infrastructure
These lines ran on the current tram network, all these services were discontinued in the early 1990s.
- Line 1: Kalemegdan – Main Railway Station – Rakovica – Kneževac
- Line 4: Kalemegdan – Dorćol – Omladinski Stadion
- Line 8: Voždovac - Slavija - Omladinski Stadion
Another line was discontinued in 2012 after re-routing of the line 12 in Resavska street and extension of the line 3 to Omladinski Stadion through Slavija Square:
- Line 7L: Tašmajdan – New Belgrade Block 45
Another 2 lines were discontinued in 2006 after moving on night buses:
- Line 7N: Block 45 – New Belgrade – Railway Station – Slavija Square – Vukov Spomenik – Ustanička (discontinued 1 January 2017)
- Line 9N: Block 45 – New Belgrade – Railway Station – Slavija Square – Banjica (discontinued 1 July 2009)
Pre-WW2
Overall, Belgrade had 12 tram lines by the end of 1938, with 11 criss-crossing the city and the twelfth one reaching towards Zemun.
- Line 1: Kalemegdan - Slavija Square. It was the first line line ever launched in Belgrade in 1892, running until 1947, when it was discontinued and replaced by a trolleybus. The line was briefly restored in 1978 to reach from Kalemegdan to Rakovica and then extended to Kneževac, but was shut down again in 1985.
- Line 1A: Savinac - Prištinska.
- Line 2: King Dušan Street - Slavija - King Dušan Street. Just like today, it was a circular line, reaching Pristanište, the main railway station and then going to the Slavija Square via Nemanjina Street. From there, it headed towards modern-day Vukov spomenik, before circling back towards Dorćol and the main power plant.
- Line 3 - Prince Mihailo Monument - Topčider.
- Line 6 - Prince Mihailo Monument - King Alexander Settlement.
- Line 7 - Kalemegdan - New Cemetery.
- Line 9 - National Theatre - Prince Paul Settlement. It was first launched in 1925 and eventually extended to Prince Mihailo Monument, before being closed down in 1939 and replaced by a bus line.
- Line 9A - Prince Paul Settlement - New Cemetery.
- Line 10 - Slavija Square - to Kraljice Marije suburb.
- Line 12 - Prince Mihailo Monument - Dedinje. Going across the modern Theodore Dreiser Street, it was known for its views towards Sava and Danube from Topčidersko brdo. It suffered from two accidents owing to its hilly route before the war and then a third one during the occupation, which led to it being discontinued in 1942.
- Line 13 - Gospodarska mehana - Čukarica.
- Line 14 - Belgrade - Zemun. Line 14 was the first and as of today only tram line to connect the city to Zemun, crossing Sava via the King Alexander Bridge. It was launched on 5 November 1935, precisely 17 years after Serbian troops entered Zemun. The line had first been 6.2 kilometres long and had had seven stations, the first one being the House of the National Assembly; it was subsequently extended towards the New Cemetery, becoming the longest public transit line in Belgrade at the time. There were also plans for the line to go below the city downtown: if they had ever been realized, it would have been the beginning of Belgrade's metro.
History
From 1892 to World War I
Belgrade administration signed a contract with Periklos Tziklos from Milan, Italy, in 1891, regarding construction of 21 km (13 mi) long tram grid ("city railway"). Tziklos headed the Serbian-French Society and was concurrently awarded with the concession on introduction of the electricity in Belgrade.
On 14 October 1892, the first tram line in Belgrade was opened. It went from Kalemegdan to Slavija and was horse-powered. A large festivity was organized in the city for this occasion and two cars were placed in front of the municipal building (Belgrade was organized as a municipality at the time). First passengers were municipal president (mayor) Milovan Marinković and members of the municipal administration (deputies, clerks, etc.). The tram started its inaugural ride at 11:00 AM, in the direction of the central Terazije square, where several thousand of citizens gathered to greet "city train", and where the Metropolitan of Belgrade, Mihailo Jovanović, blessed the first tram.
The line had a total of 8 cars, operated by two horses each. The interval between the cars was 10–12 minutes and the total duration of the line was 18 minutes. Each car had 6 horses assigned to it, which changed shifts at every 2 hours. There were no designated stops except at the terminuses. The passengers were simply stopping the trams wherever they needed to get on or off. Each car had room for 16 sitting and 16 standing passengers. Second line was Slavija-Belgrade Central railway station-Sava Port, and the third was Terazije-Belgrade New Cemetery.
First chief of the tram transportation in Belgrade was Czech émigré Vinčenc Blažek, while the treasurer was Jean Salot from France. The horses were stationed in the tram depot, built along the Tsarigrad Road, modern Depo in Bulevar Kralja Aleksandra. The complex was called "tram stables". Despite the introduction of the electricity powered trams two years later, the horses continued to be used until 1904.
The first electric line was introduced on 5 June 1894. The first electric line (fourth in total, with "tracks for technical power") connected Terazije, the very downtown of Belgrade, with Topčider, at the time a suburban forest and an excursion area. By the second half of the 1890s, the city already had 10 km (6.2 mi) of tracks. The route to Topčider went down the steep Topčider Road (modern Kneza Miloša Street), which caused frequent derails of the trams and subsequent constant complains from the citizens. Then for about 10 years, from the end of 1894, there were no works on modernization and widening of the tram system. It was not until 1903, when the operations related to the construction and exploitation of tram transport and electric lighting were passed, that the electrification of tram lines sped up.
In 1894, the first strike occurred, which halted trams for several days. Employees had only 2 days off in a month and the bosses wanted to abolish that, too. In the end, the company raised wages for 10 dinars per month. Citizens often made official complaints to the city regarding trams. Main complaints were: that trams were getting late already at the start; general unreliability of the organized transportation; deliberate reducing of number of the cars by the Society, below the number of trams stipulated by the contract with the city; frequent stopping of the trams due to the voltage and ensuing fighting with the conductors which were supposed to refund the passengers in these cases but were refusing to do so; inadequacy of the "summer cars" and "winter cars". According to the archived complaints, a major problem was height of the kids. Children lower than a meter (3 feet 3.5 inches) weren't paying the ticket. The conductors had a special stick to measure the children, but the parents often claimed that their children were lower than the stick would show.
During 1904, electric trams replaced horse-drawn trams on the Kalemegdan – Slavija and Kafana Žagubica – Električna centrala routes and in 1905 the last ones were replaced at Terazije - New Cemetery route. Apart from performing the function of public transport, “horse trams” were also a focus of great interest in Belgrade at the time and their striking image remained with their contemporaries for a long time. The introduction of the trams in general is today considered as a major step in the modernization of Belgrade, and victory of "Europe over the Orient".
Despite the frequent friction between the city and the Society, the contract was expanded in 1911 to include two more lines: Slavija-Čubura (via Makenzijeva Street) and expansion from the New Cemetery and the Grobljanska Street to Trošarina on Smederevo Road. The Society was obliged to complete works in 8 months, but was late. After continued fights with the city which threatened to activate penalties, the work was finished only in 1913. As the development of the grid became a serious and expensive task, the construction of the tram infrastructure was then assigned to the privately owned company "Belgian Anonymous Society". Twenty years after the introduction of tram transport and 7 years after the electrification of the last line, in 1912 there were 8 tram lines in Belgrade on which a daily average of 24 tram motor cars and 12 trailers operated. The total grid was 21.6 km (13.4 mi) long. That year 7.5 million passengers were transported.
Interbellum
World War I and occupation of Belgrade left the electric power plant, electric network and, consequently, city tram transport in a very bad state. Soon after the liberation of the city in 1919, the Belgrade Municipality took over the system, as the "Belgian Anonymous Society" wasn't able to repair the grid. Most of what was left from the pre-war period was worn out. It was replaced in stages, by 1932. By this time the crumbling electricity poles which formed the grid were replaced, the tracks were either repaired or replaced from 1920 to 1924, modern trams were purchased and the grid was extended. In 1928, the buses were introduced into the urban transportation system, but the development of the system was slow, especially until 1936, and up to the after World War II, the bus transportation lagged behind the trams.
At the end of 1932, Belgrade had 65.5 km (40.7 mi) of tracks, of which 2/3 were double-track and 1/3 single-track ones. During 1931 and 1932 the following new lines were opened: Knežev spomenik – Dedinje, Slavija – Dušanovac, Terazije – Pašino Brdo and Smederevski drum – Cvetkova mehana – Prištinska Street (today Cara Nikolaja II street).
After the opening of the King Alexander Bridge on 16 December 1934, which had two tram lanes, a tram connection between Belgrade and Zemun was established on 5 November 1935. The line had number 14 and connected Hotel Moskva on Terazije to Hotel Central in Zemun.
In 1940, there were ten lines, and there were 154 trams and trailers all together. The system and city sustained heavy damage during World War II. During the course of World War II, 38 trams and 36 trailers were destroyed. A total of 59.5 kilometres (37.0 mi) of tram tracks were destroyed, so as 80 km (50 mi) of tram electric grid and 15 power transformers. After the major destruction during the German bombing of Belgrade on 6 April 1941, the occupational forces restored parts of the grid by the mid-May 1941, and restored 6 lines in the old section of the city. The only one which was not restored was No. 2, as it route, circling around the city core, was the most damaged.
Post-World War II
The system was steadily rebuilt after World War II. In 1955 there were eight lines with 162 trams.
After the war, as the King Alexander Bridge was demolished, several trams remained on the Zemun side. The tram line on the left Sava bank was partially re-established, connecting Zemun and Staro Sajmište, keeping the No. 14.
In 1956, the first tram produced in Serbia entered the traffic. It was made in the Goša factory in Smederevska Palanka.
The proper work on creating the Belgrade Metro subway system began with the tenure of mayor Branko Pešić. For that purpose, the Subway section within the city administration was formed in the early 1970s, headed by Branislav Jovin, Belgrade’s chief urban planner at the time. The Section produced the most comprehensive of all subway plans in 1976. In December 1981, the plan Metro Belgrade was finished and was presented to the city council in 1982.
City organized a compulsory, self-imposed tax (samodoprinos), imposed on the salaries of all employed Belgraders. Set specifically for the construction of the subway, the fund grew to $200 million. As a comparison, city of Vienna, Austria, built its first metro line in 1967 for $100 million. Suddenly, the idea was then declared "too expensive" and the chief city executive Radoje Stefanović suspended the original subway construction plan from 1976 in favor of the expansion of the existing tram system network in 1982 ("With trams into the 21st century" project). According to architect Dragoljub Bakić, Stefanović summoned the engineers who worked on the subway project for 12 years, told them to dig a hole and bury all the metro projects in it.
In 1972, the idea of digging the Savamala-Palilula tunnel was revived. The 1 km (0.62 mi) long tunnel was to connect the Gavrila Principa Street with the brewery Belgrade in Cetinjska. The plan also included tram tracks. It was to go underground at Gavrila Principa, elevate a bit under the 36, 38, 13 and 15 Kraljice Natalije, continue under Terazije, Hotel Moskva, school in Dečanska, 17 and 26 Makedonska, 24 and 25 in Despot Stefan Boulevard, before resurfacing in the brewery's yard. It was to be one-way tunel, with his twin being built later for the opposite way. At Terazije Terrace escalators and regular stairs were planned for commuters so they could use tram lines. Tram routes would extend from the Pančevo Bridge via Višnjička and Venizelosova streets, exiting in Savamala and continuing to Čukarica. Due to the various reasons (departure of mayor Branko Pešić, financial crisis from the mid-1970s, enormous projected costs of the project), the idea was again abandoned.
In 1984 the tram connected old part of the city with the New Belgrade, across the Sava River, via the Old Sava Bridge. In 1985, the system was extended to 42 km.
In 1990 and 1991, the system reached its peak usage. This was to change, with the breakup of the former Yugoslavia. Sanctions on Serbia resulted in funding being slashed drastically. Investments in the purchase of new vehicles, spare parts and maintenance of infrastructure were minimal. During 1996 and 1997, tracks were reconstructed in Bulevar revolucije (from Cvetkova pijaca to Radio-industrija), as well as in Ruzveltova Street and Jurija Gagarina Street. The country was bombed in 1999, putting additional pressure on the system.
21st century
In the 2000s, funding for mass transit increased as the country slowly recovered. A number of cars arrived as a donation from Switzerland and, specifically, the city of Basel. In 2004, some 150 trams were in service. Widespread reconstruction was announced approaching the end of the decade. Between 2005 and 2010 tracks were completely reconstructed and modernised in following streets: Treći bulevar, Milentija Popovića, Savska, Nemanjina, Bulevar kralja Aleksandra (from Vukov spomenik to Cvetkova pijaca), Požeška, Pariska, Bulevar vojvode Mišića, Tadeuša Košćuškog. Also, tracks on Autokomanda are reconstructed as well as Old Sava Bridge (this bridge is used mostly by trams on lines connecting two parts of Belgrade). Vojvode Stepe, in the Voždovac neighboroughood, was also under reconstruction, including changing tracks and moving them to the street center. The reconstruction was completed in August 2015. During the mayoral tenure of Dragan Đilas, modern Spanish CAF trams were purchased, but they weren't fit for all the tracks.
In July 2015, city administration announced an ambitious plan of the tram grid expansion. The planned phased development includes restoration of the line No. 11, establishment of the line No. 4 from Tašmajdan to Banjica, renumeration of all tram lines which would then be numbered in one sequence from 1 to 12, several new lines (Mirijevo-Vidikovac, Bežanijska Kosa-Vidikovac, Kalemegdan-Studentski Grad, Kalemegdan-Republic Square-Ustanička), shortening of the Circle of the Deuce, revitalization of the stock and introduction of the free internet, air conditioning and commuter counters, etc. The massive changes in public transportation were announced for 1 January 2016.
The reconstruction of track in Bulevar Oslobođenja has started in July 2017 and should be followed with the reconstruction of track on Slavija Square. This long awaited reconstruction shall finally allow the operation of low floor trams on the Slavija-Banjica mainline (southern portion of line 9). The troubled reconstruction was finished by November 2017, at least when it comes to the traffic (Slavija Square 2016-2018 reconstruction).
In December 2018, Ministry of construction, transportation and infrastructure instigated changes in the Law on Communal Activity, which would allow for private companies to operate trams and trolleybuses, as the present law allows them only to operate city transportation's bus lines. Also by December 2018, nothing has been done from the 2015-2016 plans, except for the restoration of the line No. 11. At that point, city administration announced further plans: restoration of the line between downtown Belgrade and Zemun and establishment of the line to Višnjičko Polje.
City administration also announced major renovation of the existing fleet. In 2015 renovation of the Czech KT4s, nicknamed "kata" in Serbian, was announced. Partner in the reparation projects which included air-conditioning and internet, was to be Slovakian ŽOS Trnava. In 2018, city announced purchase of the new trams produced in Serbia, in Siemens Kragujevac. In 2019 plans on renovation were reintroduced, this time in cooperation with the Czech Tatra company, which produced KT4s. As Tatra recently purchased Serbian factory "14. Oktobar" in Kruševac, plans were announced for this company to permanently repair and maintain Czech trams. None of these announcements came true. By January 2021, average age of trams in Belgrade public transportation reached 35 years.
In February 2020, the GSP announced new plans regarding the future of the tram grid. It included vast expansion, mostly extensions of the already existing routes: from Block 45 to Blocks 70 & 71 and Ledine (Vinogradska Street), from Banovo Brdo to Vidikovac, from Bogoslovija to Karaburma and Rospi Ćuprija (via Marijane Gregoran Street), from Konjarnik to Mali Mokri Lug, from New Belgrade to Tošin Bunar (via both Milutina Milankovića Street and Zoran Đinđić Boulevard), to Bežanijska Kosa (from both Tošin Bunar and Jurija Gagarina Street). It also includes dormant idea of Line No. 1 from Kalemegdan to Slavija Square, with connection from Terazije to Tašmajdan. New tram depots are planned in Ada Huja, Vidikovac and Galovica. However, despite the planned expansion, purchase of new trams wasn't planned. City planned to buy 158 various vehicles for public transportation, but only three tram trailer cars, while 10 trams and 4 trailers were planned for decommission. An average age of trams in 2020 was 34 years and the last serious purchase was back in 2010 when CAF trams arrived. The total planned expansion of the grid is 41.3 kilometres (25.7 mi), of which 31 kilometres (19 mi) is to be built by 2033.
In July 2019 works on the complete refurbishment of the Sava Square and the plateau in front of the Belgrade Main railway station began as part of the Belgrade Waterfront project. The officials claimed the changes in the traffic during the works will be minimal. However, the public transportation grid was changed already at the start of the works, while in January 2020 it was almost completely disrupted. This caused massive traffic jams, so the traffic was partially rerouted to the newly built, partially operational streets within Belgrade Waterfront (Woodrow Wilson Boulevard, Nikolay Kravtsov Street) but the clogging just spread here, too. On 29 February 2020 the square was completely shut down for traffic which led to the unprecedented disturbance in the tram lines grid: out of 11 lines, only one functioned properly (13), one used changed route (11), one was formed as sort of the "Frankenstein" line, serving parts of several other line's routes (12L), while the remaining 8 were completely shut down. This caused widespread traffic jams over the city and crowds of commuters.
In April 2021, Belgrade city delegation visited Moscow's tram factory PC Transport Systems. President of the city assembly, Nikola Nikodijević, announced that the tracks-based transport will become the main part of the entire city's public transportation system. He also added that 130 trams (with 154 trolleybuses) will be purchased by the city until 2033.
In April 2024, GSP put out a bid for 25 new trams, each one costing up to 6,5mil €. The City hopes that those bids will come in very soon and that the new trams will be running in Belgrade as early as 2025.
Ada Bridge
When a new bridge across the Sava was planned, it was planned to have both the auto carriageways and tram tracks. The bridge was built from 2008 to 2011 and was open for the car transport on 1 January 2012, but the tram tracks were not placed across it. Only in 2016, city officials announced that the first trams will cross over the bridge in 2017. But a request for tender, concerning the construction of the tram tracks over the bridge, was distributed by the city government only in December 2016, and it failed. It was repeated in December 2017. The project includes 2.7 km (1.7 mi) of a new, dual gauge tracks, with connections to the existing routes in New Belgrade and Banovo Brdo. If the tender is successful (deadline is January 2018), the trams may become operational in 2019.
From the New Belgrade side, the connection will be at the Đorđa Stanojevića Street, continuing over the embankment and the northern access road to the center of the bridge. On Čukarica side, it will connect to the existing route at the border of Banovo Brdo and Rakovica. Places for the future additional tram stations, right at the ending points of the bridge, are already allocated. Among the other additional works, the already existing elevated track across the Topčiderka river, will be removed but the pillars will be preserved and used for the new track bridge. Some preparatory works began in March 2018 and later that month city signed a contract with "Energoprojekt holding", which won the bidding. Construction should last for 420 days. Some citizens' associations suggested that the new tram lines from the new bridge should extend to Zemun, reestablishing the tram connection with Belgrade which was severed in 1941. That way, Zemun would be directly connected by tram to New Belgrade and the southern parts of Belgrade across the Sava.
After a month-long testing, the tram traffic across the bridge started on 4 July 2019. Initially, two lines will cross the bridge: No. 11L (Tašmajdan-Block 45) and No. 13 (Banovo Brdo-Block 45). In January 2021, city administration announced a study to judge feasibilty to expand the Pančevo Bridge with an additional lane to carry the first tram line across the Danube.
Restoration of Line No. 1
The neutrality of this section is disputed. Relevant discussion may be found on the talk page. Please do not remove this message until conditions to do so are met. (January 2021) (Learn how and when to remove this message) |
After new city government took over in 2013, they announced the creation of a pedestrian zone in the entire central section of Belgrade. City manager Goran Vesić announced that one single tram line, using the original number 1, will replace all four trolleybus lines (19, 21, 22 and 29) and the only bus line (31), which traverse through the city’s main street Kralja Milana. Regarding reasons, Vesić stated that the overhead lines look ugly in downtown and that citizen complained about the noise made by the trolleybuses. The immediate reaction of the citizens was mostly negative.
However, some of the advantages of the trolleybuses are their minimal noise pollution. Also, there is a matter of price of digging up the entire center of the city so that at least 6 km (3.7 mi) of tram tracks can be placed, and the cost of buying the new trams which will supposedly be operated on capacitors, without the grid. At the moment, five lines pass through the main street 47 times per hour. On average, that is one vehicle on every 77 seconds, which is virtually impossible with only one line.
In May 2017, Prime Minister of Serbia Aleksandar Vučić, even though the Belgrade's city transportation is completely outside of his jurisdiction, stated that he wants to abolish the trolleybus network completely and replace it with the electric buses. As a reason, he said that the trolleybuses are causing problems and that when one stops due to the malfunction, it stops the entire traffic behind it. Though electric buses may be a better solution than the trams, the reasoning is dubious. Trolleybus has the same traffic avoidance as an electric bus and much easier than a tram. Contrary to the trams, which indeed stop all the trams behind when one malfunction because they all use the same tracks, when a trolleybus is broken, it is simply unhooked from the grid and is easily bypassed by the trolleybus behind it.
In November 2018, Vesić, now a deputy mayor, confirmed that the tram line No. 1 will be conducted through downtown instead of electric buses. He announced that the laying of tracks will began soon and that the entire work, which would include the narrowing of the central city street, Kralja Milana, will be finished in two years. However, by 2020, nothing had been done, and even during the prolonged reconstruction of the Republic Square, where the route goes, the tracks were not laid. In the new plan for the future several years from February 2020, the line was kept as the project. Also in February 2020 city announced the reconstruction of the starting section of the proposed line, the Vasina Street, for 2021, but that it is unlikely the line will be introduced then. If introduced later, it would include the new digging of the 2020-2021 reconstructed Republic Square and Vasina Street. At this time, the line was described as the circular one, without the electric grid but with the "internal source" and the city claimed they contacted Siemens to construct the original streetcars as they were at the 1900s, which Siemens accepted.
In August 2020, city announced the bidding for the project. After further negative reactions, city's Directorate for Land Development now claimed that works can't start before 2025 or 2027, but president Vučić now called the entire project unnecessary. Just few days after the announcement, the directorate called the bidding off. Instead, the new, EKO2 line with electric buses was announced, from Belgrade Waterfront to Kalemegdan, which should cover the entire projected route of Line 1.
Circle of the Deuce
Tram No. 2 has no termini, instead it circles around the majority of the city's center. As the route has remained unchanged since 1924, the tram, colloquially named Dvojka ('deuce') in Serbian, and its circle (Krug Dvojke) became one of the symbols of Belgrade and, in the local folklore, marks who the "real" (inside the circle) and who the "peripheral" (outside the circle) Belgraders are. Living inside the circle indeed grants the higher prices of the real estates and higher rent.
Following the counting of the commuters in October and November 2014, in July 2015 city government announced that, when it comes to the trams, somehow it turned out that the biggest problem is the southwest section of the route of Dvojka. It was announced that the route will be shortened for one block, the one that reaches the Vukov Spomenik. Instead, it will pass next to the Faculty of Law. Slaven Tica, professor at the Faculty of Transport Engineering, who was involved in the counting and subsequent changes in the lines of public transportation, said that "Dvojka will be improved as it showed signs of certain illnesses in its functioning...the basic problem of Dvojka is the sharp decline in the number of passengers in the zone of Vukov Spomenik". He also added that all tram lines will be changed to some degree. It was also stated that Dvojka slows down the trams No. 3, 6, 7 and 12 and obstructs the Slavija-Dorćol connection. City government also reported that the citizens were interviewed and that they voted for the line to be shortened.
The heated public debate, mostly online, lasted for months. As experts from the Faculty of Transport Engineering were involved in the change of the route, popular objections were that with the problems in Belgrade's transportation, which are legion, "experts" have no better things to do but the shorten the oldest line for one block and that they "probably don't have the clue". Those involved into the shortening of the line were labeled as "idle", "those who never commute" and "upstarts and philistines who decided to pose as the planners". Commentators also said that Mayor Siniša Mali and city manager Goran Vesić should be "discgraced and ashamed" for their, ironically labeled "revolutionary move".
After it was announced that citizens allegedly voted for the route to be shortened, debate developed between the Belgraders themselves. The "inners" mostly accused the "peripherals" of being jealous and how nice it is in Belgrade when the holiday season comes and all the "village people" travel to where they came from, while they responded how the "inners" are spoiled and that a bit of walking will do them good. Though being one of the symbols of the city and enjoying the cult status among Belgraders, such a long and heated debate wasn't expected as it extended until 2017.
Further analysis, however, by experts who didn't participate in this project, showed that shortening the line for 7–10 minutes won't help the commuters. Those commuting to Vukov Spomenik would have to change trams or buses, while rerouting Dvojka and making it faster will create traffic congestion on the tram lines from the Faculty of Law to the Gazela Bridge. They also disputed the cost benefits, noting that lesser electricity consumption for only several stops would yield minimal cost savings, and calling the entire idea illogical both in terms of traffic and economy. Tica, however, maintains that Dvojka is degraded by the bus lines, that it obstructs the traffic, affects the flow on the crossroads and that making it shorter will save money for GSP.
In the summer of 2017 a reconstruction of the Ruzveltova street began. As it is the street where Dvojka reaches Vukov Spomenik and turns, it is expected that when the reconstruction of that section starts, Dvojka will be temporarily shortened to the proposed route from 2015. Suspicions already appeared that the change will actually be final. Amidst the public debate, the historic route remained intact, and the tram resumed its circle in October 2017, though with some delay because of the prolonged works. However, due to the works in the Karađorđeva Street in the western section of the route, the line was shortened in November 2018 and temporarily renamed 2L. When the simultaneous reconstruction of the streets in the eastern section began in June 2019, the line, with few others, was shut completely. The works in the east were to be finished in December 2019 and in the west by January 2020, but both have been extended so the line will be closed at least until August 2020. The deadline was then extended to January and 22 February 2021, but the lines were not restored. The line was restored on 8 March 2021, after 633 days, instead of 180 days as originally planned.
Models
Current fleet
- As of October 2024
Manufacturer | Model | Since | Type | Number | Note |
---|---|---|---|---|---|
ČKD | Tatra KT4 | 1980 | Articulated | 114 | |
Duewag | GT6 (Be 4/6) | 2001 | Articulated | 31 | Donation from Basel (Switzerland) |
CAF | Urbos 3 | 2011 | Low floor articulated | 30 | |
Schindler | SWP Be 4/4 | 2016 | Solo | 2 | Donation from Basel (Switzerland) |
Duewag Be4/6
Schindler
Tatra KT4
CAF Urbos 3
Museum
- Snow-cleaning Glačalica tram
- Brown, Boveri & Cie tram
- Đuro Đaković trams
- Škoda tram
See also
- Belgrade Metro
- List of tram and light rail transit systems
- List of town tramway systems in Europe
- Trolleybuses in Belgrade
References
- "ДНЕВНЕ ЛИНИЈЕ". gsp.rs. Retrieved 4 December 2024.
- ^ "СТАТИСТИКА". gsp.co.rs. Retrieved 4 December 2024.
- "Beograd (Belgrade) Tram". urbanrail.net.
- "Beograd to buy 30 CAF trams". Railway Gazette International. 6 November 2009. Retrieved 2011-04-01.
- "СТАТИСТИКА". gsp.rs (in Serbian). Retrieved 2023-03-26.
- ^ Dejan Aleksić (13 October 2018). "Gradski prevoz - 126 godina: Beograđane vozili konji, "lejlandi", "mercedesi"..." [Urban transportation - 126 years: Belgraders were transported by horses, Leylands, Mercedeses...]. Politika (in Serbian). p. 13.
- Beobuild (29 July 2006). "Tracks to be purchased for reconstruction of tram system". Retrieved 2009-09-12.
- "ДНЕВНЕ ЛИНИЈЕ". gsp.co.rs. Retrieved 26 November 2024.
- Stojanov, Ivana (26 December 2020). "Tvit koji definiše ljude iz famoznog „kruga dvojke"". nova.rs. Retrieved 25 November 2024.
- Beljan, M. (9 September 2015). "Brojanje putnika suzilo krug "dvojke": Evo zbog čega je izmenjena trasa najpoznatije gradske linije". blic.rs. Retrieved 25 November 2024.
- "Istorijski arhiv Beograda". Facebook. Retrieved 25 November 2024.
- "Istorija JGP-a". Beobuild Forum. Retrieved 25 November 2024.
- Stanković, Ljubica (29 January 2023). ""Trojka" godinama "privremeno" ukinuta: Građanima ostaje nada da će do 2024. rakovički bulevar biti povezan sa Mostom na Adi". 24sedam.rs. Retrieved 25 November 2024.
- Алексић, Дејан (28 January 2023). "„Тројка" годинама „привремено" укинута". politika.rs. Retrieved 25 November 2024.
- ^ "UKIDAJU SE TRAMVAJI 3 i 3L, dok će neke autobuske linije biti REDUKOVANE". blic.rs. 11 January 2019. Retrieved 25 November 2024.
- "Beograd dobio dve nove autobuske linije: Od danas lakše do Železničke stanice Topčider i to ovim putem". telegraf.rs. 7 June 2018. Retrieved 5 December 2024.
- Aleksić, Dejan (17 July 2018). "Stanica srpskih vladara postaje polazna za barske vozove". politika.rs. Retrieved 5 December 2024.
- Maričić, Slobodan (1 October 2021). "Železnički saobraćaj i Srbija: Stanica Topčider prestala da radi - zbog čega i šta o tome kažu ljudi koji tamo rade". bbc.com. Retrieved 5 December 2024.
- "Bnl viewer". istorijskenovine.unilib.rs.
- ^ "Linija tramvaja koja je bila simbol Novog Beograda". kaldrma.rs. 27 November 2024. Retrieved 25 November 2024.
- "Измене на линијама 7, 9, 78 и 83". politika.rs. 1 November 2024. Retrieved 25 November 2024.
- "Stari Savski most se ne zatvara sutra, već ovog datuma: Tramvaji 7 i 9 menjaju trase, biće i nova bus linija". telegraf.rs. 31 October 2024. Retrieved 25 November 2024.
- "busevi.com". busevi.com.
- "Tramvaji u Beogradu". beogradskevesti.info. Retrieved 25 November 2024.
- ^ "Bnl viewer". istorijskenovine.unilib.rs.
- Andrić, Grujica (14 October 2022). "Kako je Beograd prešao put od „konjskog tramvaja" do modernih „Španaca"". BBC News na srpskom. Retrieved 25 November 2024.
- Janković, Milan. "Banovo brdo / Tramvaj 13 je na Čukaricu stigao..." Facebook. Retrieved 25 November 2024.
- "Bnl viewer". istorijskenovine.unilib.rs.
- "Bnl viewer". istorijskenovine.unilib.rs.
- "MISTERIJA BEOGRADSKE "JEDINICE": Zašto u glavnom gradu Srbije ne postoji tramvaj broj 1?". istorijskizabavnik.rs. Retrieved 27 November 2024.
- "VRAĆA SE TRAMVAJ BROJ JEDAN! Legendarna linija ponovo na ulicama, ali ne tamo gde je BEOGRAĐANI PAMTE". dnevno.rs. 9 November 2018. Retrieved 27 November 2024.
- "Zaboravljeni beogradski toponimi: Šta je Savinac i gde se nalazi?". 011info.rs. 22 November 2021. Retrieved 28 November 2024.
- "Beskrajni gradski krug i u njemu – tramvaj". 21 May 2021. Retrieved 30 November 2024.
- "Bnl viewer". istorijskenovine.unilib.rs.
- "(FOTO) Crkva Pokrova Presvete Bogorodice na Zvezdari". zvezdaravesti.rs. Retrieved 27 November 2024.
- "Politika", 11. jul 1940
- "На линији Кнежев споменик - Кланица уведен аутобуски саобраћај уместо трамваја 9. - У: Време, 8. август 1939. година". Дигитална НБС. Retrieved 27 November 2024.
- "VOŽDOVAC - MESTO GDE SE STVARALA ISTORIJA". bomaxnekretnine.rs. Retrieved 28 November 2024.
- "Najopasnija tramvajska linija u Beogradu ukinuta je posle 3 nesreće na strmim ulicama Dedinja i Senjaka". kaldrma.rs. 27 November 2022. Retrieved 28 November 2024.
- "PRE 86 GODINA ZEMUNCE VOZIO TRAMVAJ". zemunskevesti.rs. Retrieved 27 November 2024.
- "Kako je Zemun izgubio jedinu tramvajsku liniju koju je imao? Četrnaestica slavi 84. rođendan". telegraf.rs. 5 November 2019. Retrieved 27 November 2024.
- Vasiljević, Branka (5 November 2024). "Dan oslobođenja Zemuna u Prvom svetskom ratu". politika.rs. Retrieved 27 November 2024.
- "Zemunski tramvaj". modernizurnal.com. 1 July 2019. Retrieved 27 November 2024.
- "Dan u kome su šine prešle Savu". kaldrma.rs. 5 November 2021. Retrieved 27 November 2024.
- ^ Goran Vesić (20 September 2019). Београдске приче: Увођење трамваја - модернизација Србије [Belgrade stories: Introduction of trams - modernization of Belgrade]. Politika (in Serbian). p. 14.
- "Important Years in City History". City of Belgrade. Retrieved 2009-10-28.
- ^ Dejan Aleksić (2 December 2019). "Od tramvaja na konjsku vuču do elektrobusa" [From horse trams to electric buses]. Politika (in Serbian). p. 15.
- Zoran Nikolić (15 December 2016). "Kako smo se oprostili od Aleksandrovog mosta" [How we said goodbye to Alexander's bridge] (in Serbian). Večernje Novosti.
- Goran Vesić (10 September 2021). Живот града под окупацијом [City life during occupation]. Politika (in Serbian). p. 16.
- Да ли знате? - Како се некада стизало до Земуна [Did you know? - How was Zemun reached before]. Politika (in Serbian). 9 July 2020. p. 38.
- ^ Dejan Aleksić, Daliborka Mučibabić (11 February 2018). "Metro pola veka na početnoj stanici" [Metro still on the starting point after half a century]. Politika (in Serbian).
- ^ Marijana Avakumović (30 October 2009), "Metro opet na čekanju" [Metro on hold again], Politika (in Serbian)
- Uroš Komlenović (5 July 1997). "Lightly made promises". Vreme. No. 300.
- Sandra Petrušić (20 June 2019). Замлаћивање о нашем трошку [Messing around with our money]. NIN, No. 3573 (in Serbian). pp. 22–25.
- Goran Vesić (30 June 2023). Борба за велике градске пројекте [Fighting for city's mega projects]. Politika (in Serbian). p. 16.
- Dejan Spalović (9 April 2013), "Krpljenje rupa na Starom savskom mostu" [Holes patching on the Old Sava Bridge], Politika (in Serbian), p. 16
- ^ Dejan Aleksić (24 December 2018). "Kragujevačkim tramvajem u prestoničku tramvajsku prošlost" [By the Kragujevac tram into the capital's tram past]. Politika (in Serbian). p. 15.
- ^ M.Beljan (9 September 2015), "Brojanje putnika suzilo krug "dvojke": Evo zbog čega je izmenjena trasa najpoznatije gradske linije", Blic (in Serbian)
- Dejan Aleksić (16 November 2017), "Beograd opet prohodan" [Belgrade passable again], Politika (in Serbian), p. 17
- S.B. Milošević (2 December 2018). "Po hitnom postupku: Šine u BG i privatnicima, trolejbusi u istoriju" [Accelerated procedure: tram tracks in Belgrade go to private companies, trolleybuses go to history] (in Serbian). Večernje Novosti, B92.
- Dejan Aleksić (21 February 2021). "Novi tramvaji i trole umesto na trasama – u obećanjima" [New trams and trolleybuses instead on the routes - in promises]. Politika (in Serbian).
- ^ Dejan Aleksić (3 February 2020). Трамвајем чак до Малог Мокрог Луга [Tram all the way to Mali Mokri Lug]. Politika (in Serbian). p. 15.
- ^ Dejan Aleksić (15 April 2021). "Komforniji i pouzdaniji javni prevoz za Beograđane" [More comfortable and reliable public transportation for Belgraders]. Politika (in Serbian). p. 22.
- Dejan Aleksić (30 August 2019). Због обнове Савског трга сели се споменик испред Железничког музеја [Monument is moving to the Railway museum because of the Sava Square reconstruction]. Politika (in Serbian). p. 16.
- Dejan Aleksić (9 December 2019). Настављенмо уклањање привремених објеката [Continued removal of the temporary objects]. Politika (in Serbian).
- Dejan Aleksić (10 January 2019). "Tramvaji se rotiraju, autobusi 78 i 83 preko Brankovog mosta" [Tram lines rotating, buses 78 and 83 go across the Branko's Bridge]. Politika (in Serbian). p. 17.
- Dejan Aleksić (29 February 2020). До априла само "тринаестица" остаје на редовној траси [Until April, only "Thirteen" on its regular route]. Politika (in Serbian).
- Dejan Aleksić (4 March 2020). "Ukidanje tramvaja – gužva u Bulevaru kralja Aleksandra" [Shutting down the trams - jams in Bulevar Kralja Aleksandra]. Politika (in Serbian). p. 15.
- Dejan Aleksić (13 March 2020). "Obnova Savskog trga promenila režim saobraćaja u Kneza Miloša" [Reconstruction of Sava Square changed the traffic regime in Kneza Miloша]. Politika (in Serbian). p. 15.
- D.Aleksić. "Nabavka 25 novih tramvaja za beogradski javni prevoz - Po vozilu više od 6,5 mil EUR, a bez duple kabine i kapaciteta kao zglobni autobus" [Procurement of 25 new trams for Belgrade public transport - More than 6.5 million EUR per vehicle, without a double cabin and the capacity of an articulated bus]. ekapija.
- ^ Dejan Aleksić (20 January 2018). "Za pun život Mosta na Adi još tri velika koraka" [Three more big steps for the full life of the Ada Bridge]. Politika (in Serbian). p. 15.
- Dejan Aleksić (8 December 2017), "Tramvajem od Banovog brdo do Novog Beograda" [By tram from Banovo Brdo to New Belgrade], Politika (in Serbian), p. 17
- Dejan Aleksić (21 March 2018). "Potpisan ugovor sa "Energoprojektom"" [Contract with "Energoprojekt" is signed]. Politika (in Serbian). p. 15.
- Dejan Aleksić (28 March 2018). "Tramvaj bi opet mogao da ide ka Zemunu" [The tram could go to Zemun again]. Politika (in Serbian). p. 15.
- Dejan Aleksić (5 July 2019). Од данас трамвајем преко Моста на Ади [From today, across the Ada Bridge by the tram]. Politika (in Serbian). p. 15.
- "Stojčić: Tramvaj će ići preko Pančevca ako studija pokaže da je to moguće" [Stojčić: Tram across Pančevo Bridge, if its feasible]. N1 (in Serbian). 15 January 2021.
- FoNet (26 November 2016), "Ponovo tramvaj od Slavije preko Terazija do Kalemegdana" [Trams again from Slavija via Terazije to Kalemegdan], N1 (in Serbian)
- Dejan Aleksić (4 December 2016), "I "za" i "protiv" vraćanja "jedinice" u centar" [Pros and cons against the return of "One" to downtown], Politika (in Serbian)
- Dejan Aleksić (20 December 2016), "Širenje tramvajske mreže ne ometa gradnju metroa" [Expansion of the tram grid is not obstruction the construction of a subway], Politika (in Serbian)
- Tanjug (14 May 2017), "Vučić: Da ukinemo trolejbuse, prave nam problem" [Vučić: Abolish trolleybuses, they are causing us problems], B92 (in Serbian)
- Milan Janković (12 November 2018). "Кецом" преко Теразије [With No. 1 over Terazije]. Politika (in Serbian). p. 15.
- Dejan Aleksić, Daliborka Mučibabić (19 February 2020). Трамвај и археолошка атракција у будућој улици културе [Tram and archaeological attraction in the future street of culture]. Politika (in Serbian). p. 15.
- Dejan Aleksić (10 August 2020). Поново скидају коцке - сада због шина [The slabs are removed again - now because of the tram tracks]. Politika (in Serbian). p. 15.
- Nenad Nešić (11 August 2020). "Tramvaj zvani pusta želja - Vesić najavljivao šine, Vučić kaže da nisu potrebne" [Street car named wishful desire - Vesić announced tracks, Vučić say it is unnecessary] (in Serbian). N1.
- Dejan Aleksić (13 August 2020). "TRG republike miruje" Коцке на Тргу републике мирују [Cubes on Republic Square remain]. Politika (in Serbian). p. 15.
- Branka Vasiljević, Dejan Aleksić (24 February 2021). Пукла цев, аутобус упао уз кратер - Пешачка зона у Краља Милана само у најавама [Pipe burst, bus fell into the crater - Pedestrian zone in Kralja Milana only in announcements]. Politika (in Serbian). p. 15.
- ^ "Posle 91 godine: Skraćuju čuveni krug dvojke" (in Serbian). Telegraf. 10 September 2015.
- ^ Dejan Aleksić (18 July 2015), "Niko meni ne može da ukine pravo da živim u "krugu dvojke"", Politika (in Serbian)
- ^ Dejan Aleksić (14 July 2015), "Ko ostaje izvan "kruga dvojke"", Politika (in Serbian)
- ^ Dejan Aleksić (11 July 2017), "Prilika za sužavanje kruga "dvojke"", Politika (in Serbian), p. 17
- "Krenuli tramvaji: Linije 2, 5 i 9L ponovo na starim trasama" [Trams are running again: lines 2, 5 and 9L again on their old routes]. Blic (in Serbian). 4 October 2017.
- Dejan Aleksić (15 June 2018). "Tramvaji se ukidaju, autobusi se preusmeravaju" [Trams are shutting down, buses are being rerouted]. Politika (in Serbian).
- Dejan Aleksić (8 January 2020). "Bez tramvaja 2, 5 i 10 sve do avgusta" [Without trams 2, 5 and 10 until August]. Politika (in Serbian).
- Dejan Aleksić (23 December 2020). "Tramvaji 2, 5 i 10 tek od kraja januara" [Trams 2, 5 and 10 only from the late January]. Politika (in Serbian).
- "Dvadeset meseci bez tramvaja 2, 5 i 10" [Twenty months without trams 2, 5 and 10]. Politika (in Serbian). 23 February 2021. p. 17.
- Dejan Aleksić (6 March 2021). "Tramvaji 2, 5 i 10 ponovo na trasi od 8. marta" [Trams 2, 5 and 10 again on the routes from 8 March]. Politika (in Serbian). p. 14.
Notes
Notes:
- ^ This date is officially adopted as the holiday of the city public transportation. Some sources, though, name 1 October as the correct date. The difference obviously comes from the official use of Old Style calendar in Serbia at the time. However, difference between two calendars in the 19th century was 12 days, as opposed to 13 days in the 20th and the 21st century, so in this case the correct date would be 13 October
- Today this neighborhood is taken up by the Church of Saint Sava
- Today it has been relocated to Prokop
- Today this neighborhood is called Crveni krstt
- It is located in modern-day Karaburma
- Today it is a part of Voždovac
- Opened in 1936, it was then known as 'the New National Assembly'
External links
- GSP – Public Transport Company "Belgrade" (under construction website)
- Belgrade at UrbanRail.net (incl. system map)
- BelgradeMaps.com - Belgrade public transport maps
- pics of Belgrade's tram at public-transport.net
Transport in Belgrade | |
---|---|
Road transport | |
Railway transport |
|
Bridges on the Sava | |
Bridges on the Danube | |
Former bridges |
|
Other | |