Overview | |
---|---|
Service type | Intercity Express |
First service | 8 October 2019; 5 years ago (2019-10-08) |
Current operator(s) | North Western Railway |
Route | |
Termini | Bhagat Ki Kothi (BGKT) Sabarmati (SBIB) |
Stops | 13 |
Distance travelled | 457 km (284 mi) |
Average journey time | 8 hours 10 minutes |
Service frequency | Daily |
Train number(s) | 20485 / 20486 |
On-board services | |
Class(es) | AC 2 Tier, AC 3 Tier, Sleeper Class, General Unreserved |
Seating arrangements | Yes |
Sleeping arrangements | Yes |
Catering facilities | On-board catering, E-catering |
Observation facilities | Large windows |
Baggage facilities | No |
Other facilities | Below the seats |
Technical | |
Rolling stock | LHB coach |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 56 km/h (35 mph) average including halts. |
The 20485 / 20486 Bhagat Ki Kothi–Sabarmati Intercity Express is an Intercity Express train belonging to Western Railway zone that runs between Sabarmati Junction and Bhagat Ki Kothi in India. It is currently being operated with 14819/14820 train numbers on a daily basis.
Service
- 20485/Bhagat Ki Kothi–Sabarmati Intercity-Express has an average speed of 51 km/h and covers 454 km in 9 hrs 05 mins.
- 20496/Sabarmati–Bhagat Ki Kothi Intercity-Express has an average speed of 46 km/h and covers 454 km in 9 hrs 50 mins.
Schedule
Train number | Departure station | Departure time | Departure day | Arrival station | Arrival time | Arrival day |
---|---|---|---|---|---|---|
20485 | Bhagat Ki Kothi | 05:00 | Daily except Wed | Sabarmati | 13:55 | Daily except Wed |
20486 | Sabarmati | 17:20 | Daily except Wed | Bhagat Ki Kothi | 03:10 | Daily except Wed |
Route & halts
- Bhagat Ki Kothi
- Luni Junction
- Samdari Junction
- Jalor
- Marwar Bhinmal
- Raniwara
- Bhildi Junction
- Patan
- Mahesana Junction
- Sabarmati
Coach composition
The train has dedicated LHB rakes and PM of rakes is done Jodhpur Junction. The train consists of 16 coaches:
- 1 Second A/C
- 2 A/C Chair Chair
- 3 Second Chair Car
- 9 General Unreserved
- 2 End on Generator
Traction
Both trains are hauled by an Bhagat Ki Kothi Loco Shed-based WDP-4 / WDP-4B / WDP-4D diesel locomotive from Sabarmati to Bhagat Ki Kothi and vice versa.
See also
References
- "New railway service starts between Bhagat's Kothi-Sabarmati, will run five days a week". bhaskar.com. Retrieved 1 April 2020.
- "The Ongoing Exercise For Operation Of Samarmati Express Train, – सामरमती एक्सप्रेस टे्रन के संचालन को लेकर चल रही कवायद, तारीख जल्द तय होगी". Patrika News. Retrieved 1 April 2020.
This Indian express train article is a stub. You can help Misplaced Pages by expanding it. |