Bishan 璧山 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Station platform | |||||||||||
General information | |||||||||||
Location | Shuanglong Avenue, Bicheng Subdistrict, Bishan District, Chongqing China | ||||||||||
Coordinates | 29°36′54″N 106°13′44″E / 29.614882°N 106.228829°E / 29.614882; 106.228829 | ||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | ||||||||||
Line(s) | Line 1 Line 27 (Under construction) Bishan-Tongliang line (Under construction) | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Connections | Bishan Public Transport Bishan rubber-tyred tram | ||||||||||
Construction | |||||||||||
Structure type | Above ground and elevated | ||||||||||
Accessible | Yes (2 accessible elevators) | ||||||||||
Other information | |||||||||||
Station code | 1/25 | ||||||||||
History | |||||||||||
Opened | 30 December 2019; 4 years ago (2019-12-30) (Line 1) | ||||||||||
Services | |||||||||||
| |||||||||||
Bishan is a station on Line 1 of Chongqing Rail Transit in Shuanglong Avenue, Bicheng Subdistrict, Bishan District, Chongqing Municipality, China. The station opened on December 30, 2019. It is CRT's first station to be built outside of the Metropolitan Area of Chongqing.
Connections
The metro station is connected to the northern terminus of the Bishan rubber-tyred tram.
Station structure
Floors
F2 | Line Line 1 Platform | Trains | |
F1 | Line Line 1 Station Concourse
& Entrances/Exits |
Ticket machines, Ticket gates, Customer service center, Accessible elevators, Escalators, Toilets | |
Exits 1, 2 & 3 |
Line 1 platform
An island platform is used for Line 1 trains. Line 1 trains can access the Bishan Metro Depot by using the railway junction. The station acts as a reversing station using its scissors crossover for trains to switch direction as their service to Bishan terminates.
- Platform Layout
The railway junction is located on the left side of this diagram
To Line 1 Bishan
Terminus |
← |
1/25 |
← | ||
---|---|---|---|---|---|
Crossover
and rail to car depot |
Island Platform
Doors open on the left |
||||
→ | 1/25 | → | To Line 1 Chaotianmen
Next Jiandingpo |
Exits
There are a total of 3 entrances/exits for the station.
Line | Exit Type | Exit | To |
---|---|---|---|
Line 1 | Ground Level Exits | 1 | Liuqi Avenue(Six Flags Ave.), Jiguanshi Road |
2 | Liuqi Avenue(Six Flags Ave.), Yanhe West Road | ||
3 | Jiguanshi Road |
Future development
It will be an interchange station between Line 1 and Bitong Line in 2023. Line 27 is also under construction.
References
- "重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 2019-12-30.
- "轨道交通1号线尖璧段、环线西南半环5座车站今日14时开通试运营". 2019-12-30. Archived from the original on December 30, 2019.
- "CRT will serve areas outside of Metropolitan Chongqing starting with Bishan station on Line 1" (in Chinese (China)). 2019-11-13. Retrieved 2020-02-23.
- ""Jian-Bi Section" Expansion is going well with its non-passenger trials" (in Chinese (China)). 2019-11-19. Retrieved 2022-06-09.
Chongqing Rail Transit stations | |
---|---|
Line 1 | |
Note: Stations in Italic are under construction. |
This article about a railway station in Chongqing is a stub. You can help Misplaced Pages by expanding it. |