Bodangora Wind Farm is a 113.2 MW wind farm owned by Infigen Energy in the district of Bodangora near Wellington, New South Wales, Australia. It consists of 33 wind turbines. The towers are 85 metres tall, and the rotor diameter is 130 metres. The wind turbine blades were manufactured in Bergama, Turkey. The development of the project began in 2009. It received planning approval in August 2013. The wind farm was completed on 27 February 2019. Annually it is supposed to generate on average 361 GWh of energy at capacity factor of 36.4%.
The wind farm began grid commissioning in October 2018 and was fully commissioned in December 2018 and has operated continuously since then. The generation table uses eljmkt nemlog to obtain generation values for each month.
Bodangora Wind Farm Generation (MWh)
Year
Total
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
2018
58,782
N/A
N/A
N/A
N/A
N/A
N/A
N/A
992*
6,015*
8,920*
18,234*
24,621*
2019
340,081
27,414
33,559
27,518
30,909
21,685
24,479
30,255
26,353
30,018
28,846
29,811
29,234
2020
353,663
30,895
33,176
35,922
24,911
29,239
25,081
25,083
26,083
31,590
27,660
29,153
34,870
2021
334,562
29,709
28,980
32,684
19,191
21,532
24,260
29,574
28,211
27,559
27,129
36,662
29,071
Note: Asterisk indicates power output was limited during the month.