Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
You can help expand this article with text translated from the corresponding article in Polish. Click for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Polish Misplaced Pages article at ]; see its history for attribution.
You may also add the template {{Translated|pl|Kopalnia Węgla Kamiennego Borynia}} to the talk page.
The Borynia coal mine is a large mine in the south of Poland in Jastrzębie-Zdrój, Silesian Voivodeship, 260 km south-west of the capital, Warsaw. Borynia has estimated reserves of 34 million tonnes of coal. The annual coal production is around 3.4 million tonnes.
References
"KWK Borynia". Jastrzębska Spółka Węglowa. 2010. Archived from the original on 2010-08-10. Retrieved 2010-09-28.