Misplaced Pages

Bryn-Celynog Halt railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Disused railway station in Gwynedd, Wales

Bryn-Celynog Halt
General information
LocationBryn-Celynog, near Trawsfynydd, Gwynedd
Wales
Coordinates52°54′56″N 3°51′42″W / 52.9156°N 3.8617°W / 52.9156; -3.8617
Grid referenceSH 749 370
Platforms1
Other information
StatusDisused
History
Original companyGreat Western Railway
Key dates
1 November 1882Line opened
13 March 1939Opened for passengers only
4 January 1960Closed, but line remained open for goods
28 January 1961Line closed
Bala & Festiniog Railway
Legend
Conwy Valley line
to Llandudno
Ffestiniog Railway
to Porthmadog Harbour
Blaenau Festiniog Junction
Blaenau Ffestiniog North
Blaenau Ffestiniog Ffestiniog Railway
Ffestiniog Railway
to Duffws (FR)
Diphwys (F&BR)
Glynllifon Street (F&BR)
Former wooden viaduct
Tan-y-Manod (F&BR)
Graig Ddu Quarry
Pengwern Quarry
Tyddyngwyn (F&BR)
Manod
Teigl Halt
Festiniog
Maentwrog Road
Line to south dismantled
Trawsfynydd power station
loading point
Trawsfynydd Lake Halt
Trawsfynydd Camp
Trawsfynydd
Llafar Halt
Bryn-Celynog Halt
Cwm Prysor Viaduct
Cwm Prysor Halt
Arenig
Capel Celyn Halt
Section flooded by Llyn Celyn
Tyddyn Bridge Halt
(under dam wall)
Frongoch
Bala (New)
Bala Junction
Ruabon–Barmouth line
to Llandderfel
Bala (Penybont)
(original Bala Lake Halt)
Bala Lake Railway
to Llanuwchllyn
Ruabon–Barmouth line
to Barmouth

Bryn-Celynog Halt (sometimes written as Bryncelynog Halt) was an unstaffed solely passenger railway station which served the rural area of Bryn-Celynog, east of Trawsfynydd, Gwynedd, Wales.

Origins

In 1882 the Bala and Ffestiniog Railway opened the line from Bala Junction to a temporary terminus at Festiniog, Trawsfynydd was one of the stations opened with the line; the future Bryn-Celynog Halt would be on this line, east of Trawsfynydd. At Festiniog passengers had to transfer to narrow gauge trains if they wished to continue northwards.

To do this people travelling from Bala to Blaenau or beyond walked the few yards from the standard gauge train to the narrow gauge train, much as they do today between the Conwy Valley Line and the Ffestiniog Railway at Blaenau Ffestiniog.

The following year the narrow gauge line was converted to standard gauge, but narrow gauge trains continued to run until 5 September 1883 using a third rail. Standard gauge trains first ran through from Bala to Blaenau Ffestiniog on 10 September 1883. The line was taken over by the Great Western Railway in 1910.

Bryn-Celynog Halt was one of the 198 opened by the Great Western Railway (GWR) between 1927 and 1939, spurred by rising competition with buses and, to a lesser degree, cars. The halt stood in very thinly populated uplands with no obvious source of traffic; conversely, the people who did live, work and increasingly take leisure activities in the area had no other obvious means of transport.

Description

The unstaffed halt's single platform's edge was made of sleepers, the platform itself being infilled with ash and cinders. It was a mere 50 feet (15 m) long, so drivers had instructions to stop ensuring the guard's compartment was alongside. Access was by a footpath only.

Services

The September 1959 timetable shows

  • Northbound
    • three trains calling at all stations from Bala to Blaenau on Monday to Saturday
    • an extra evening train calling at all stations from Bala to Blaenau on Saturday
    • a Monday to Friday train calling at all stations from Bala to Trawsfynydd
  • The journey time from Bala to Bryn-Celynog Halt was around 40 minutes.
  • Southbound
    • three trains calling at all stations from Blaenau to Bala on Monday to Saturday
    • two extra trains calling at all stations from Blaenau to Bala on Saturday
    • an extra train calling at all stations from Blaenau to Trawsfynydd on Saturday evening
    • a Monday to Friday train calling at all stations from Blaenau to Bala, except Llafar, Bryn-celynog and Cwm Prysor Halts
  • The journey time from Blaenau to Llafar Halt was 39 minutes, except for one Saturdays Only train which took an hour because it sat at Trawsfynydd for 25 minutes.
  • There was no Sunday service.

After the Second World War at the latest most trains were composed of two carriages, with one regular turn comprising just one brake third coach. At least one train along the line regularly ran as a mixed train, with a second between Bala and Arenig. By that time such trains had become rare on Britain's railways.

Workmen's trains had been a feature of the line from the outset; they were the Festiniog and Blaenau Railway's biggest source of revenue. Such a service between Trawsfynydd and Blaenau Ffestiniog survived to the line's closure to passengers in 1960. Up to 1930 at the earliest such services used dedicated, lower standard, coaches which used a specific siding at Blaenau where the men boarded from and alighted to the ballast.

Closure

By the 1950s the line was deemed unremunerative. A survey undertaken in 1956 and 1957 found that the average daily numbers of passengers boarding and alighting were:

  • Blaenau Ffestiniog Central 62 and 65
  • Manod Halt 7 and 4
  • Teigl Halt 5 and 5
  • Festiniog 28 and 26
  • Maentwrog Road 8 and 6
  • Trawsfynydd Lake Halt 1 and 1
  • Trawsfynydd 28 and 24
  • Llafar Halt 2 and 2
  • Bryn-Celynog Halt 2 and 2
  • Cwm Prysor Halt 3 and 3
  • Arenig 5 and 5
  • Capel Celyn Halt 7 and 8
  • Tyddyn Bridge Halt 4 and 6
  • Frongoch 18 and 15
  • Bala 65 and 58

Military traffic had ended and, apart from a finite contract to bring cement to Blaenau in connection with the construction of Ffestiniog Power Station freight traffic was not heavy, most arriving and leaving Bala did so from and to the south and that to Blaenau could be handled from the Conwy Valley Line northwards.

In 1957 Parliament authorised Liverpool Corporation to flood a section of the line by damming the Afon Tryweryn. Monies were made available to divert the route round the dam, but it was decided that improving the road from Bala to Llan Ffestiniog would be of greater benefit.

Road transport alternatives were established for groups such as schoolchildren and workers. The plans afoot for rail serving Trawsfynydd nuclear power station were to be catered for by building the long-discussed cross-town link between the two Blaenau standard gauge stations. The estimated financial savings to be made were £23,300 by withdrawing the passenger service and £7000 in renewal charges.

The halt closed in January 1960 but freight trains between Bala and Blaenau continued to pass the site for a further year, the last train of all passing on 27 January 1961. The track though the halt was lifted in the 1960s.

In 1964 the line reopened from Blaenau southwards to a siding near the site of Trawsfynydd Lake Halt where a large ("Goliath") gantry was erected to load and unload traffic for the then new Trawsfynydd nuclear power station. The main goods transported were nuclear fuel rods carried in nuclear flasks. The new facility was over four route miles north of Bryn-Celynog Halt, so the reopening brought no reprieve.

Special trains

Rail enthusiasts' special trains traversed the line from time to time, notably the "last train" from Bala to Blaenau Ffestiniog and return on 22 January 1961.

The halt and art

The mountainous countryside around Arenig was of particular interest to James Dickson Innes who introduced his friend Augustus John to the area. Innes painted several works which have been publicly displayed to some renown, such as "Arenig, North Wales". He and his friend are known to have used the railway as a means of getting to remote spots, as well as to arrive and depart for London and elsewhere. Bryn-Celynog is specifically mentioned in at least one resume of Innes's life and work, with Cwm Prysor's famous station mistress being amenable to stopping a train at Bryn-celynog for the artists to alight with their equipment. This all took place before the First World War, but Bryn-Celynog Halt proper was not opened for a further twentyfive years.

The future

Between 2000 and 2011 there were at least two attempts to put the remaining line to use, but none of these aspired to come close to the site of the halt. As the line of route to the east has been severed by Llyn Celyn the prospects of revival must be very remote.

To considerable local surprise fresh moves to reopen the line from Blaenau as far south as Trawsfynydd began in September 2016, with the formation of The Trawsfynydd & Blaenau Ffestiniog Community Railway Company. On 21 September at least one regional newspaper reported that "Volunteers are set to start work this weekend on clearing vegetation from the trackbed between Blaenau Ffestiniog and Trawsfynydd." The company was quoted as saying "We have been given a licence by Network Rail to clear and survey the line."


Preceding station   Disused railways   Following station
Llafar Halt
Line and station closed
  Great Western Railway
Bala and Festiniog Railway
  Cwm Prysor Halt
Line and station closed

References

  1. Southern 1995, Preface.
  2. ^ Boyd 1988, p. 47.
  3. Butt 1995, p. 47.
  4. Quick 2009, pp. 104.
  5. Southern 1995, pp. 64 & 81.
  6. Jowett 2000, Map 45.
  7. Mitchell & Smith 2010, Map XVI.
  8. Southern 1995, p. 74.
  9. Southern 1995, p. 8.
  10. Coleford 2010a, p. 509.
  11. Wells 2016, pp. 374–9.
  12. Southern, Leadbetter & Weatherley 1987, p. 64.
  13. Mitchell & Smith 2010, Preface.
  14. Christiansen 1976, p. 71.
  15. "Mixed train approaching Blaenau Ffestiniog". RCTS. Archived from the original on 1 December 2016. Retrieved 30 November 2016.
  16. Boyd 1988, p. 88.
  17. Southern 1995, pp. 15–17.
  18. 1960 Working timetable, via 2D53
  19. Southern 1995, p. 13.
  20. Blaenau Ffestiniog (GWR) track layout, via Signalling Record Society
  21. Mitchell & Smith 2010, Plate 15.
  22. Morton Lloyd 1961, pp. 270–1.
  23. Coleford 2010b, pp. 577–582.
  24. Southern 1995, p. 64.
  25. Mitchell & Smith 2010, Photo 28.
  26. Southern 1995, p. 71.
  27. Southern 1995, p. 93.
  28. The painting "Arenig, North Wales", via Tate Gallery
  29. "Innes's use of the line, via Keith Bowen, Artist". Archived from the original on 20 December 2016. Retrieved 26 September 2016.
  30. Crump 2016, p. 15.

Sources

Further material

External links

Closed railway stations in Gwynedd
Aberystwith and Welsh Coast Railway
Bala and Dolgelly Railway
Bala and Festiniog Railway
Bala Lake Railway
Bangor and Carnarvon Railway
Bethesda branch line
Cambrian Line
Carnarvon and Llanberis Railway
Carnarvonshire Railway
Chester and Holyhead Railway
Conwy Valley line
Corris Railway
Corwen and Bala Railway
Ffestiniog Railway
Festiniog and Blaenau Railway
Mawddwy Railway
Nantlle Railway
Welsh Highland Railway
Categories: