Misplaced Pages

Bukit Gombak MRT station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Mass Rapid Transit station in Singapore
Bukit Gombak  NS3 

武吉甘柏
புக்கிட் கோம்பாக்
Mass Rapid Transit (MRT) station
Bukit Gombak Station Platform B
General information
Location802 Bukit Batok West Avenue 5
Singapore 659083
Coordinates1°21′31″N 103°45′06″E / 1.358702°N 103.751787°E / 1.358702; 103.751787
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)  North–South Line
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeElevated
Platform levels1
AccessibleYes
History
Opened10 March 1990; 34 years ago (1990-03-10)
ElectrifiedYes
Previous namesBukit Batok North
Passengers
June 202418,519 per day
Services
Preceding station Mass Rapid Transit Following station
Bukit Batoktowards Jurong East North–South Line Choa Chu Kangtowards Marina South Pier
North–South LineFuture service Bricklandtowards Marina South Pier
Location
Singapore MRT/LRT system mapSingapore MRT/LRT system mapBukit GombakBukit Gombak station in Singapore

Bukit Gombak MRT station is an above-ground Mass Rapid Transit (MRT) station on the North South line in Bukit Batok, Singapore. Located at the junction of Bukit Batok West Avenue 5 and Bukit Batok East Avenue 5, it is the nearest MRT station to the Bukit Batok Town Park, a scenic parkland otherwise known as "Little Guilin".

Opened on 10 March 1990, Bukit Gombak station was part of the Branch line before the opening of the North South line Woodlands Extension on 10 February 1996.

History

Installation of half-height screen doors at the station started on 30 April 2010 and operations commenced on 16 August 2010 with Clementi. Then, this station was installed with high-volume low-speed fans, which commenced operations on 31 October 2012.

Bukit Gombak was a temporary terminus for the North South line from 18 to 19 September 2010 during the Jurong East Modification Project upgrade. and during the late openings of the MRT on Sundays from June to November 2016.

References

  1. "Land Transport DataMall". mytransport.sg. Land Transport Authority. Archived from the original on 14 August 2024. Retrieved 14 August 2024.
  2. Wong, Siew Ying (January 26, 2008). "Above-ground MRT stations to have platform screen doors by 2012". Channel NewsAsia. Archived from the original on July 30, 2012. Retrieved February 1, 2012.
  3. "LTA and SMRT gear up for disruption over the weekend". Archived from the original on 2017-08-10. Retrieved 2017-08-10.
  4. "Late Opening of the East West and North South Line for maintenance works". Archived from the original on 2017-08-10. Retrieved 2017-08-10.

External links

Singapore Mass Rapid Transit (MRT) stations in Singapore
Italicised locations are currently not in operation
North–South Line
Depot(s)


Stub icon

This Singapore MRT-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: