CSR EMU | |
---|---|
A CSR EMU at Retiro Mitre railway station | |
CSR Mitre Interior | |
Manufacturer | CSR Corporation Limited |
Built at | CSR Sifang Co Ltd. |
Constructed | 2013-2015 |
Entered service | 2014 |
Number under construction | 405 cars (third rail) 500 cars (overhead line) |
Formation | 6 cars per trainset (Mitre Line) 9 cars per trainset (Sarmiento Line) 7 cars per trainset (Roca) |
Capacity | 60 seats (control car) 72 seats (passenger car) |
Operators | Trenes Argentinos |
Lines served | Mitre Line, Roca Line and Sarmiento Line |
Specifications | |
Car length | 22.67 m (74 ft 4+1⁄2 in)(control car) 21.8 m (71 ft 6+1⁄4 in)(passenger car) |
Width | 3.10 m (10 ft 2 in) |
Height | 3.79 m (12 ft 5+1⁄4 in) |
Doors | 3 per side |
Maximum speed | 120 km/h (75 mph) |
Traction system | IGBT–VVVF (Mitre and Sarmiento lines:Mitsubishi Electric MAP-194-75VD259, Roca Line:Zhuzhou CRRC Times Electric t Power-TI4) |
Power output | Mitre and Sarmiento lines:180 kW (241 hp) per motor Roca Line:250 kW (335 hp) per motor |
Power supply | 800 V DC Third rail (Mitre and Sarmiento lines) 25 kV AC, 50 Hz Overhead line (Roca Line) |
Track gauge | 1,676 mm (5 ft 6 in) |
The CSR EMU is a series of electric multiple unit cars manufactured by CSR Corporation Limited for use on Buenos Aires' commuter rail network. As of 2015, the trains operated on three of the city's lines and 705 cars were manufactured, with each line using a different number of cars per train. They were created for use on lines electrified using both third rail and overhead lines.
Background
By 2013, the rolling stock of Buenos Aires' commuter rail network was ageing and deteriorating rapidly. At the same time, high-profile accidents in Flores and Once in previous years had led the national government to revise the concession-based railway privatisation, which was largely blamed for the deterioration of the network. The government thus decided to intervene, revoking concessions to companies such as Trenes de Buenos Aires and setting up Trenes Argentinos to manage the lines.
This was followed by a series of rolling stock purchases from China CNR Corporation and CSR Corporation Limited (and later some Argentine companies) to replace trains on both the diesel and rail segments. For the electrified lines, CSR won the contract to provide the electric multiple units, and an order was placed in January 2013 for 405 cars for the Mitre and Sarmiento lines, with another order for 300 cars for the Roca Line signed in August 2013.
The acquisition of the CSR rolling stock was also accompanied by a series of works on all three lines, to accommodate the new trains (e.g. the electrification of the Buenos Aires - La Plata segment on the Roca Line), and to generally improve rail services. On top of the emergency improvements undertaken following the Once Tragedy, some of these improvements included the modernisation of stations, raising the height of platforms to match the new trains, incorporating train protection systems, creating new underpasses and rail infrastructure improvements, some of which were also undertaken by the City of Buenos Aires. However, not all works were finished by the time the CSR EMUs arrived on their respective lines, and some works continued on while they were already running services.
A further 200 cars were purchased for the Roca Line in 2017 to replace the aging Toshiba EMUs which had exceeded their 30-year lifespan.
Overview
The units were built at CSR's Qingdao factory, a large complex with 1,640,000 m (17,652,813 sq ft) of covered space. The total cost for the 709 cars was $841 million, which also included R&D as well as shipping, or $1.09 million to $1.27 million per car depending on the line, which was noted as being significantly below market prices. In 2014, CSR then purchased the Argentine rolling stock manufacturer Emprendimientos Ferroviarios, in part to establish a place in Argentina to maintain the trains once they were in operation.
The trains have a series of features in line with modern rolling stock, such as ABS, air conditioning, CCTV, a train protection system and intelligent doors, while numerous components such as the brakes and traction system were sourced from countries such as Germany, Sweden and Japan. The Roca Line trains have some differences: overhead collection at 25 000 V (instead of 800 V third rail), more (but smaller) windows per car, and no CCTV cameras. The trains began to arrive in February 2014, just 13 months after the order was signed.
Usage
The electric multiple units are used on all of Buenos Aires' electrified commuter rail lines, with the exception of the Urquiza Line which uses Japanese Toshiba EMUs. The Belgrano Sur line had diesel multiple units with a similar appearance to the CSR electric multiple units, which arrived in the country from 2015. The San Martín Line also saw new rolling stock from CSR, but in the form of CSR SDD7 diesel-electric locomotives, while the Belgrano Norte line has seen the incorporation of Argentine-built EMEPA DMUs.
The Sarmiento Line was the first to begin operating the CSR trains in July 2014, followed by the Mitre Line and then the Roca Line. In the case of the Mitre and Sarmiento lines, the CSR EMUs make up the entirety of the electric rolling stock, while diesel segments such as the Victoria - Capilla del Señor route on the Mitre Line use Argentine-built Materfer CMM 400-2 DMUs. The first Roca Line trains began arriving in 2015, continuing to arrive throughout the year, and began to be integrated in June 2015. These are running alongside the existing Toshiba rolling stock purchased in 1985.
All the trains are operated by the state-owned Trenes Argentinos, which is now a part of the larger Ferrocarriles Argentinos umbrella company.
Gallery
- Roca Line cars being unloaded at the Port of Buenos Aires
- Interior of a Sarmiento Line train
- A Mitre Line train at San Isidro station
- Close-up of a coupler
- Sarmiento Line trains
- Roca Line train in Banfield
See also
- CSR SDD7 - Locomotive manufactured by the same company for the San Martin Line
- CNR CKD8 - Other Chinese rolling stock in Argentina
- CITIC-CNR - Chinese underground cars for the Buenos Aires Underground
- Rail transport in Argentina
References
- Broad-gauge Suburban EMU Archived May 18, 2015, at the Wayback Machine - CSR Corporation Limited
- "Finalmente, el Gobierno le sacó las concesiones del Sarmiento y del Mitre a TBA". Clarín.
- "El gobierno nacional estatizó los ferrocarriles Sarmiento y Mitre", Infobae
- "ALL concessions revoked". Railway Gazette International. Retrieved 30 June 2015.
- "Nueva empresa estatal para el Belgrano Cargas", Página/12, 23 May 2013
- Decreto 9/2013 - Ministerio del Interior, 10 January 2013.
- Decisión Administrativa 584/2013 - Ministerio del Interior, 15 August 2013.
- Adjudican la última parte de la electrificación del ferrocarril que une Constitución con La Plata - InfoBAE, 5 February 2015.
- Arranca un plan de obras atrasadas en el tren Mitre - Clarin, 10 August 2012.
- Randazzo anunció avances en la renovación del Mitre Archived 2014-02-28 at the Wayback Machine - Sala de Prensa de la Republica Argentina, 16 January 2014.
- ^ Comenzaron a funcionar seis de los nuevos trenes chinos del Sarmiento - Clarin, 21 July 2014
- Obras que alivian la circulación, unen barrios y evitan accidentes - Buenos Aires Ciudad, 23 June 2015.
- Los nuevos trenes del Roca arrancan el 8 de junio - EnElSubte, 22 May 2015.
- "Compran 200 coches eléctricos adicionales para la línea Roca". enelSubte.com (in European Spanish). 4 January 2018. Retrieved 15 January 2018.
- ^ Los trenes que se vienen desde China - Pagina/12, 23 September 2013.
- Company Overview of Emprendimientos Ferroviarios S.A. Emfer S.A. - Bloomberg Business
- CSR adquiere EMFER y desembarca en la Argentina - EnElSubte, 26 February 2014.
- Randazzo expuso sobre la recuperación ferroviaria en Argentina. - Trenes Argentinosa Cargas y Logistica, 24 September 2014.
- Los nuevos trenes de la línea Sarmiento comenzarán a funcionar el lunes - La Nacion, 16 July 2014.
- Presentaron los nuevos vagones chinos de la línea Sarmiento - InfoBAE, 26 February 2014.
- Historia Archived 2019-03-15 at the Wayback Machine - Metrovias
- Presentaron los trenes 0 km de la línea Belgrano Sur: llegarán al país en junio - La Nacion, 20 April 2015.
- Los nuevos trenes chinos en el San Martín - La Nacion, 26 October 2013.
- Servicio diferencial en la Línea Belgrano Norte con coches motores "Alerce" - Crónica Ferroviaria, 26 March 2015
- Incorporan nuevos trenes y servicios en el Victoria – Capilla - EnElSubte, 13 April 2015.
- Avanza la obra de electrificación del Roca - EnElSubte, 18 June 2015.
- Formalizan la estatización del San Martín, el Mitre y el Belgrano Sur Archived 2015-09-23 at the Wayback Machine - Diario Registrado, 2 March 2015.