(Redirected from Chengyu Railway) Railway line in China
Chengdu–Chongqing railway
成渝铁路
Line in Jianyang
Overview
StatusActive
Termini
Service
TypeHeavy rail
Operator(s)China Railway
History
CommencedJune 15, 1950; 74 years ago (1950-06-15)
CompletedJune 13, 1952; 72 years ago (1952-06-13)
Technical
Line length505 km (314 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV/50 Hz AC overhead catenary
Route map

Legend
km elev
Chengdu–Dujiangyan ICR from Qingchengshan
Baoji–Chengdu railway from Baoji
0 Chengdu
Bali
Chengdu–Kunming railway to Kunming
10 Longtansi
Dazhou–Chengdu railway to Dazhou
Suining–Chengdu railway from Chengdu East
Shibantan
Changlin crossing loop
Suining–Chengdu railway to Suining
Honganxiang
36 Chenjiawan
Honghuatang
Wufengxi
Lingxianmiao
Yangmahe
Shiqiaozhen
83 Jianyang
Miaozigou
105 Linjiangsi
Mochiba
122 Ziyang
Houjiaping
Cheungshagen
149 Shunhechang
Dengyingya
Guidexiang–Lianjie railway from Lianjie
Guidexiang
Taojiagou
189 Zizhong
Zizhong–Weiyuan railway from Songjiapu
Maodianzi
Yinshanzhen
Shijiaxiang
219 Neijiang
Neijiang–Kunming railway to Kunming
Neijiang East
231 Beimuzhen
240 Shuangfengyi
249 Yingxiangjie
257 Longchang
Longchang–Huangtong railway to Luzhou
Shiyanqiao
272 Lishizhen
279 Anfuzhen
286 Guangshunchang
292 Rongchang
303 Fenggaopu
311 Dazu
319 Changhebian
329 Shuangshiqiao
339 Yongchuan
Langantan
354 Linjiangchang
362 Bailin
370 Ciba
380 Zhuyangxi
391 Pingdeng
402 Baisha
411 Jingangtuo
420 Youxi
429 Gujiatuo
439 Jiangjin
450 Huangqian
460 Tongguanyi
Moujia crossing loop
Xinglongchang–Luohuang railway,
Tongguanyi branch to Taojia
468 Shichang
Xinglongchang–Luohuang railway
from Xinglongchang via Taojia
Xiaonanhai–Lishuwan railway
from Lishuwan via Tiaodeng
Baishatuo Yangtze River Railway Bridge link to Tiaodeng
Sichuan–Guizhou railway to
Guiyang via Luohuang
Chongqing–Guiyang HSR
to Guiyang North via Luohuang South
Chongqing–Guiyang HSR to Chongqing West
New Baishatuo Yangtze
River Railway Bridge
471 Xiaonanhai
477 Funiuxi
483 Qiezixi
488 Dadukou
492 Luozhongzi
497 Chongqing South
501 Huangshaxi
former section of Xiangyang–Chongqing railway
to Xiangyang via Shapingba
504 Chongqing
km
This diagram:

Chengdu–Chongqing railway or Chengyu railway (simplified Chinese: 成渝铁路; traditional Chinese: 成渝鐵路; pinyin: chéngyú tiělù), is a single-track electrified railroad in the Sichuan Basin of Southwest China between the cities Chengdu and Chongqing. Chongqing's short form name is Yu (渝) and the railway is named after the two cities. The line has a total length of 505 km (314 mi).

The Chengyu railway opened in 1952 and was the first railway to be built after the founding of the People's Republic of China. Other cities along the route include Jianyang, Ziyang, Zizhong, Neijiang, Longchang and Yongchuan. The line is single-track, but duplication commenced between Chongqing and Jiangjin in November 2019.

History

A locomotive adorned with a portrait of Mao Zedong at the opening ceremony of the Chengdu-Chongqing railway on July 1, 1952He Long cuts the ribbon at the opening ceremony.

In 1903, a railway line between Chengdu and Chongqing, the two biggest cities in Sichuan, was proposed by Huguang Viceroy Zhang Zhidong as part of a railway from Sichuan to Wuhan. Construction on this line began in 1909 and halted in 1911. Attempts to resume construction in 1936, by the China Development Finance Corporation, and in 1947 ended with the outbreak of the Sino-Japanese War and the Chinese Civil War. On December 31, 1949, shortly after the Chinese Communists captured Sichuan from the Nationalists, Secretary of the Southwest Bureau Deng Xiaoping proposed the building of the railway. Work began on June 15, 1950 and involved 30,000 People's Liberation Army troops and 10,000 civilian laborers. More than 400 private steel mills in Chongqing supplied steel for the line. The line was completed on June 13, 1952, and entered into trial operation on July 1, 1952. It was the first railway line built in China after the establishment of the People's Republic of China.

In 1987, the Chengyu Line was fully electrified, raising annual carrying capacity from 6.1 million tons to 13 million.

The opening of the Chengdu–Chongqing Expressway in 1995 drew passengers away from the railway.

By 2008, the line was transporting 90 million tons of cargo and 70 million passengers per year.

Passenger service

As of 2021, the only remaining passenger service is a one train in each direction per day between Chongqing and Neijiang.

Other rail lines between Chengdu and Chongqing

After the opening of the Dazhou–Chengdu railway (达成铁路) (via Suining) in 1997, and the Suining–Chongqing Railway in 2006, another, shorter, railway route between Chengdu and Chongqing, via Suining (so-called 成遂渝铁路), 312 kilometres (194 miles) long, appeared. Since 2009, high-speed CRH passenger trains run on that route.

The third railway line between the two cities, the Chengdu-Chongqing high-speed railway, completed on December 26, 2015, accommodates high-speed trains traveling at up to 350 kilometres per hour (217 miles per hour). Although it follows a route generally similar to that of the original Chengdu–Chongqing railway, it is significantly shorter due to the greater use of elevated sections and tunnels.

Rail junctions

See also

References

  1. ^ "新中国档案:成渝铁路--新中国的第一条铁路" Archived 2011-06-14 at the Wayback Machine 2009-08-11
  2. (Chinese)"成渝铁路:中国铁路史的奇迹" Archived January 4, 2010, at the Wayback Machine 2009-09-11
  3. "中国铁道博物馆馆藏成渝铁路通车纪念章". China Railway. 2021-10-24. Archived from the original on 2021-12-16. Retrieved 2022-02-20.
  4. "遂渝铁路"缩短"成渝线". Sina. 2003-01-08. Retrieved 2022-02-20.
  5. "【奋斗百年路 启航新征程】成渝铁路:新中国第一条铁路". 2021-02-25. Retrieved 2022-02-20.
  6. ^ 成渝客运专线最快2014年通车 Archived December 17, 2013, at the Wayback Machine, luzhouol.cn, 2012-07-31

External links

Chengdu–Chongqing railway
Categories: