Chittagong Elevated Expressway | |
---|---|
Route information | |
Length | 16 km (9.9 mi) |
Status | Completed |
Location | |
Country | Bangladesh |
Highway system | |
Chittagong Elevated Expressway (Bengali: চট্টগ্রাম উড়াল মহাসড়ক) is Bangladesh's second elevated expressway project, which connects the Shah Amanat International Airport with Lalkhan Bazaar. It’s total length is 16 km (9.9 mi)(28.5 km with the connecting ramps). It was opened for trial run in August, 2024. From January 2025, Chittagong Development Authority will collect the toll.
Contracts for the expressway
The Max-Ranken Joint Venture has entered contract with Chittagong Development Authority for building the Chittagong Elevated Expressway.
See also
References
- "Great expectations precede elevated expressway in Chittagong". Dhaka Tribune. 1 July 2019. Archived from the original on 12 December 2021. Retrieved 10 December 2010.
- "Deal signed for Ctg elevated expressway". The Daily Star. 1 November 2018. Archived from the original on 17 May 2021. Retrieved 10 December 2010.
This road-related article is a stub. You can help Misplaced Pages by expanding it. |