Toll Road in West Java, Indonesia
Cileunyi-Sumedang-Dawuan Toll Road
Cisumdawu Toll Road
Cileunyi Tollroad Interchange.jpgCisumdawu Toll Road at Cileunyi Interchange
Route information
Part of AH2
Maintained by Citra Karya Jabar Tol (CKJT)
Length60.3 km (37.5 mi)
Existed2011–present
HistorySection I completed and opened in January 2022
Section II and III completed and opened in December 2022
Others completed and opened in July 2023
Major junctions
Southwest endCileunyi Interchange
Major intersections
Northeast endKertajati Interchange
Location
CountryIndonesia
Major cities
Highway system

Cileunyi-Sumedang-Dawuan Toll Road or Cisumdawu Toll Road is a toll road in West Java, Indonesia, which was opened on 11 July 2023, thereby reducing the trip durations of Bandung-Cirebon to around 1 hour, Bandung-Kertajati to 40 minutes, and Cirebon-Kertajati to 20 minutes.

This will be the only toll road in Indonesia that has two tunnel (twin tunnel) length of 472 metres (1,549 ft) each and a diameter of 14 metres (46 ft) in Section II. The toll road will pass through Cileunyi, Tanjung Sari, Sumedang, Cimalaka, Legok, Ujung Jaya and Kertajati. This toll road will connect Padaleunyi Toll Road with Cikopo-Palimanan Toll Road. The toll road will connect Bandung with Kertajati International Airport, which opened in 2018.

Construction

Due to the fact that the entire toll road is not feasible for investors, the government agreed to construct Section I and Section II. In Section II there is a 472-metre-long (1,549 ft) tunnel. Total cost of construction and acquisition of Cisumdawu Toll area is Rp 14 trillion. This fund is a combination of the State Budget (APBN) and loans from China. The remaining sections III to VI will be managed by Toll Road Enterprises (BUJT), namely PT Citra Marga Nusaphala Persada consortium, PT Waskita Toll Road, PT Pembangunan Perumahan, PT Brantas Abipraya, PT Jasa Sarana along 30.9 kilometres (19.2 mi).

This toll road is the first toll road in Indonesia to have a tunnel, there are located in section II, with a length of 472 meters and a diameter of 14 meters. The tunnel has two lanes in each directions.

The first section, connecting between Cileunyi and Rancakalong (now Pamulihan) for 11 kilometers, is officially open for use on 25 January 2022.

On 15 December 2022, sections II and III has been functionally opened, which connects Rancakalong (now Pamulihan)-Sumedang-Cimalaka for 21 kilometers as preparations for the 2022 Christmas and 2023 New Year holidays.

As of July 2023, both ends of the toll road have been connected and it was opened by President Joko Widodo and the Chief Director of Citra Karya Jabar Tol Co. Ltd., Mohamad Jusuf Hamka.

Sections

With the completion and opening of the toll road on 11 July 2023, it is expected to shorten the travel time between Bandung and Sumedang. At the same time share the traffic load on Cadas Pangeran Road which is always crowded and will be connected to the Cikopo-Palimanan Toll Road, which is part of the Trans Java Toll Road. The toll road will consists of 6 sections, concession of Section I is held by Shanghai Construction Group, Wijaya Karya and Waskita Karya, while concessions for Section II-VI are held by Citra Marga Nursaphala Persada (IDX:CMNP):

  • Section I: Cileunyi–Tanjungsari (Pamulihan) (12.0 km (7.5 mi))
  • Section II: Tanjungsari (Pamulihan)–Sumedang (17.5 km (10.9 mi))
  • Section III: Sumedang–Cimalaka (3.7 km (2.3 mi))
  • Section IV: Cimalaka–Legok (7.2 km (4.5 mi))
  • Section V: Legok–Ujungjaya (15.9 km (9.9 mi))
  • Section VI: Ujungjaya–Dawuan (4.0 km (2.5 mi))

Toll gate

Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only

ProvinceLocationkmmiExitNameDestinationsNotes
West JavaCileunyi, Bandung Regency15596Cileunyi Toll Gate
15596155Cileunyi Toll Gate
Jatinangor, Sumedang Regency161100161Jatinangor Toll Gate
  • Jatinangor
  • Sukasari
  • Cimanggung
Northeast-bound exit & Southwest-bound entry only
Pamulihan, Sumedang Regency166103166Pamulihan Toll Gate
  • Pamulihan
  • Tanjungsari
  • Rancakalong
Sumedang Utara, Sumedang Regency183114183Sumedang Toll Gate
Cimalaka, Sumedang Regency186116186Cimalaka Toll Gate
  • Cimalaka
  • Tanjungkerta
  • Tanjungmedar
Paseh, Sumedang Regency194121194Paseh Toll Gate
  • Paseh
  • Conggeang
  • Buahdua
Ujungjaya, Sumedang Regency211131211Ujungjaya Toll Gate
  • Ujungjaya
  • Palasah
  • Sakurjaya
215134Ujung Jaya Utama Toll Gate
Kertajati, Majalengka Regency217135217Kertajati Interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. Ramdhani, Deni (25 March 2019). Assifa, Farid (ed.). "Tol Cisumdawu Beroperasi Tahun 2020, Bandung-Cirebon Ditempuh 45 Menit". Kompas.com (in Indonesian). Retrieved 20 April 2023.
  2. Dani Prabowo (April 27, 2018). "Basuki Targetkan Terowongan Tol Cisumdawu Rampung Agustus 2018". Retrieved May 27, 2018.
  3. "Realisasi Pembangunan Seksi I Tol Cisumdawu Tahun Ini". Kompas. Retrieved 4 December 2017.
  4. "Govt breaks ground on phase 3 of Cisumdawu toll road project". The Jakarta Post. Retrieved 4 December 2017.
  5. "Minister blames local administration for underperforming Kertajati airport". The Jakarta Post. Retrieved 9 May 2019.
  6. "Gov't Signs Loan Agreement With China to Continue Construction on Cisumdawu Toll Road". Jakarta Globe. Retrieved 4 December 2017.
  7. Fadli, Adriansyah (28 February 2022). "Cisumdawu, Tol Pertama di Indonesia yang Punya Terowongan Kembar". Kompas. Retrieved 29 December 2022.
  8. Bugrahadi, Arif (25 January 2022). "Tol Cisumdawuu Seksi 1 Mulai Beroperasi Tanpa Tarif". Kompas. Retrieved 29 December 2022.
  9. Permana, Ikhsan (17 December 2022). "Jalan Tol Cisumdawu Seksi 2 dan 3 Dibuka Gratis, Bandung-Sumedang 20 Menit". Okezone. Retrieved 17 December 2022.
  10. "Peresmian Jalan Tol Cileunyi, Sumedang, Dawuan (Cisumdawu), di Kabupaten Sumedang, Provinsi Jawa Barat, 11 Juli 2023". Sambutan Presiden Jokowi pada Peresmian Tol Cisumdawu, 11 Juli 2023. 11 July 2023. Archived from the original on 24 July 2023. Retrieved 11 July 2023.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  11. "Jalan Tol Cisumdawu Mulai Dikerjakan". Retrieved December 4, 2012.
  12. "CMNP Garap Ruas Cisumdawu". Retrieved December 4, 2012.
Toll Roads in Indonesia
Sumatra
Java
Banten
Jakarta
JIRR
JORR
JORR 2
otherJakarta Elevated Toll Road
West
Java
Central
Java
East
Java
Lesser Sunda Islands
Kalimantan
Sulawesi
Under Construction
Planned
Category: