Misplaced Pages

City College station (Sacramento)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from City College (Sacramento RT)) Light rail station in Sacramento, California, US

City CollegeSacRT light rail
City College station platforms, September 2007
General information
Location24th Street
Sacramento, California
United States
Coordinates38°32′30.69″N 121°29′7.22″W / 38.5418583°N 121.4853389°W / 38.5418583; -121.4853389
Owned bySacramento Regional Transit District
Line(s)UP Sacramento Subdivision
Blue Line Southwest Extension
Platforms1 side platform, 1 island platform
Tracks2
ConnectionsBus transport Sacramento Regional Transit: 11, SmaRT Ride Franklin−South Sacramento
Construction
Structure typeAt-grade
AccessibleYes
History
OpenedSeptember 26, 2003 (2003-09-26)
Services
Preceding station Sacramento Regional Transit District Following station
4th Avenue/​Wayne Hultgrentoward Watt/​I-80 Blue Line Fruitridgetoward Cosumnes River College
Future services
Preceding station Altamont Corridor Express Following station
Midtown Sacramentotoward Natomas/​Sacramento Airport San Jose – Natomas Elk Grovetoward San Jose
Union City – NatomasOpening 2030 Elk Grovetoward Union City
Preceding station Amtrak Following station
Midtown Sacramentotoward Natomas/​Sacramento Airport San Joaquins Elk Grovetoward Bakersfield
Location

City College station is an at-grade light rail station on the Blue Line of the SacRT light rail system operated by the Sacramento Regional Transit District. The station is located in an exclusive right of way alongside the Union Pacific Railroad's Sacramento Subdivision and a small rail yard, on the campus of Sacramento City College, after which the station is named, in the city of Sacramento, California.

The station is located northeast of Charles C. Hughes Stadium on campus. In addition to serving the college this station also serves William Land Park and Curtis Park. The 60-foot-wide (18 m) station provides bus service, drop-off areas, and walkways to the stadium, campus, and parking lots.

The land east of the station has been the site of transit-oriented development community named Crocker Village. The remediated brownfield land was formerly part of a larger Union Pacific rail yard. Early construction includes a bridge over the light rail platform and the remaining rail yard, along with a 91-unit senior housing development called Curtis Park Court.

Altamont Corridor Express and San Joaquins services are planned to stop at the station when those lines are extended to Sacramento as part of the Valley Rail project. A new platform will be constructed along the main line to facilitate the commuter rail and inter-city trains. By 2023, the expected start of the new service was 2029.

Platforms and tracks

Like nearly all stations built as part of the Blue Line Southwest Extension, City College station has a rather unique layout with an island platform serving northbound trains and a side platform boarding area for southbound trains, integrated into a plaza that leads into the Sacramento City College station. The southbound tracks are embedded in the pavement, allowing passengers to cross to the northbound platform from any point in the plaza. The layout is both efficient and a cost-effective way of providing a pedestrian-train interface.

References

  1. "SacRT System Map" (PDF) (Map). Sacramento Regional Transit District. August 29, 2021. Archived from the original (PDF) on July 16, 2022. Retrieved July 16, 2022.
  2. Bizjak, Tony (September 27, 2003). "New vista for light rail – 1st new line in 16 years opens to fanfare". The Sacramento Bee. p. A1. Retrieved July 17, 2022 – via newspapers.com.
  3. "Union City ACE/BART Rail-to-Rail Hub Station: Project Overview and Update". San Joaquin Regional Rail Commission. June 2022.
  4. Krause, Daniel; Mangonon, Anthony (June 1, 2022). Deliverable 3.1.3 (Initial Service and Operations Planning Analysis) (PDF). Wordpress (Report). AECOM. Retrieved December 21, 2023.
  5. "Union City on track to become regional transit hub by 2030". East Bay Echo. December 12, 2023. Retrieved December 22, 2023.
  6. ^ "Sacramento Light Rail: South Line Opens on Time, on Budget". Light Rail Now!. September 2003. Retrieved February 5, 2010.
  7. "Revitalized Community". California State Treasurer. Retrieved July 17, 2022.
  8. "Curtis Park Court". Newport Partners. Retrieved July 17, 2022.
  9. "San Joaquin Joint Powers Authority Draft 2019 Business Plan Update" (PDF). San Joaquin Joint Powers Authority. Retrieved April 14, 2019.
  10. van der Meer, Ben (November 3, 2022). "Passenger rail service through Midtown, Natomas and more slated for 2024 start with stations planned". Sacramento Business Journal. Retrieved November 9, 2022.
  11. "Valley Rail Sacramento Extension Project – Draft Environmental Impact Report" (PDF). Altamont Corridor Express. AECOM. Archived from the original (PDF) on August 30, 2021. Retrieved May 6, 2020.
  12. Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.
Sacramento Regional Transit District
Management
Transit busRoutes
Light rail
Stations
Planned
Dos Rios
Defunct stations
7th & K
Other
Altamont Corridor Express
Stations
Future
Route
Projects
Category


Stub icon

This tram-, streetcar-, or light rail-related article is a stub. You can help Misplaced Pages by expanding it.

Stub icon 1 Stub icon 2

This California train station-related article is a stub. You can help Misplaced Pages by expanding it.

This article related to Sacramento, California is a stub. You can help Misplaced Pages by expanding it.

Categories: