Misplaced Pages

Tranz Metro

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Cityrail) Defunct New Zealand railway operator "Cityrail" redirects here. Not to be confused with CityRail.

Tranz Metro
The Tranz Metro logo.
Overview
OwnerKiwiRail
LocaleWellington Region, New Zealand
Transit typeSuburban rail
Number of lines5
Number of stations49
Annual ridership11.6 million (2013-14)
HeadquartersWellington railway station, Wellington
Operation
Began operationJuly 1938 (electric trains introduced in Wellington)
1984 (Cityrail created)
1995 (Renamed Tranz Metro)
Ended operation2 July 2016 (replaced by Transdev Wellington)
Number of vehicles166
Technical
System length154 km (96 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary (95 km or 59 mi)

Tranz Metro (formerly Cityrail and before that Cityline) was a New Zealand public transport operator. Beginning as the New Zealand Railways Corporation's Cityline division as a result of restructuring in the 1980s, in its final form Tranz Metro was the operator of Metlink's suburban trains owned by the Greater Wellington Regional Council in the Wellington Region of New Zealand.

Since 3 July 2016, Wellington's commuter rail services have been operated by Transdev Wellington.

History

Suburban passenger rail services in Auckland and Wellington were a part of the New Zealand Railways Department, while bus services were owned either by city corporations or Railways Road Services. With the restructuring of the department into the New Zealand Railways Corporation in 1982, the Auckland suburban rail operation was branded "Cityrail Auckland" from 1984 and later in the mid 1980s, suburban bus and rail services were branded Cityline as part of the Corporation's Rail Passenger Group. Further restructuring of the rail network came in 1991, and the suburban rail operations were renamed "Cityrail" after they were transferred to New Zealand Rail Limited in 1991. That year the Auckland Regional Council bought the Auckland Cityrail fleet and contracted New Zealand Rail to run it, extending the contract until 1993 and again for 10 years until 2003.

In 1993, New Zealand Rail Limited was privatised, renamed Tranz Rail in 1995, with Cityrail rebranded Tranz Metro. On 15 December 2000, as part of management changes at Tranz Rail, the company split Tranz Metro into wholly owned subsidiaries Tranz Metro Auckland Ltd and Tranz Metro Wellington Ltd, with the intention of selling them. Stagecoach New Zealand and Greater Wellington Regional Council (GWRC) announced their intention to bid for the Wellington company, but both were barred by the Commerce Commission from doing so. Tranz Rail did not bid for the Auckland contract when it expired in 2003. Connex (later Veolia and now Transdev) won the contract, and took over from 23 August 2004. Tranz Metro Wellington reverted to a business unit of Tranz Rail, with new contracts being signed with GWRC in 2006 for network access, rolling stock maintenance and service delivery. The contracts expired in 2016.

In 2004, Toll Holdings bought a majority shareholding in Tranz Rail and renamed the company Toll NZ, and on 1 July 2008, it was bought (less the Tranz Link trucking and distribution arm) by the government and renamed KiwiRail. In October 2009, Cabinet agreed on a Metropolitan Rail Operating Model, which requires the operating contracts for metropolitan rail operations to be "contestable". This is in line with Auckland's rail contract.

An agreement signed in July 2011 transferred ownership of KiwiRail's station buildings, excluding Wellington railway station, to the GWRC, along with the D/DM class and EM/ET units (the FP/FT units were already owned by GWRC). KiwiRail retained ownership of the tracks, platforms, electric traction and signalling systems. The assets were valued at $107.5 million. Ownership of the fleet transferred on 1 July 2011 to Greater Wellington Rail Ltd, formed by Greater Wellington Regional Council in 2006.

In 2014, Transdev announced its intention to bid for the operations contract when it came up for renewal in 2016. The contract was awarded to a partnership between Transdev and Hyundai Rotem effective from July 2016.

Operations

Schematic map of the Metlink rail network, operated by Tranz Metro

Metlink trains are operated under contract from the GWRC, which subsidises the operation and owns station buildings and rolling stock. Typically, 60% of that subsidy comes from central government through the NZ Transport Agency (formerly Land Transport New Zealand), which approves such funding after analysis of the economics and net benefits, the remainder coming from the GWRC. Public consultation in 2005–2006 resulted in some changes of emphasis in the new contract, which runs for ten years from June 2006. The September 2006 fare rises and section changes were stated to part-pay for a major upgrade of trains and facilities over the next few years in conjunction with regional bus service improvements.

Rolling stock

Rolling stock as at 2 July 2016:

Image Class Type Number Seats Routes operated Introduction
FP class
Matangi
electric multiple unit 83× 2-car sets 149 Kapiti Line
Melling Line
Hutt Valley Line
Johnsonville Line
2011–16
SW class passenger carriage 12× SW
3× SWG
3× SWS
64 (SW)
37 (SWG/SWS)
Wairarapa Connection 2007
SE class passenger carriage 4× SE
1× SEG
1× SES
64 (SE)
37 (SEG/SES)
Wairarapa Line
Kapiti Line (former)
Hutt Valley Line (former)
2008 (HVL and KPL, withdrawn 2011)
2013 (WRL)
AG class luggage van 1 - Wairarapa Connection 2007
DFB class diesel-electric locomotive 5 - Wairarapa Connection 2015

Former rolling stock

Image Class Type Number Seats Routes operated Introduction Withdrawal
EM/ET class
Ganz Mavag
electric multiple unit 44× 2-car sets 148 Kapiti Line
Melling Line
Hutt Valley Line
1981–82 2011–16
DM/D class
English Electric
electric multiple unit 49 132 Hutt Valley Line
Johnsonville Line
1938–1954 1983–2012
EO class electric locomotive 3 - Kapiti Line
Hutt Valley Line
2008 2011
EW class electric locomotive 7 - Kapiti Line
Melling Line
Hutt Valley Line
Johnsonville Line
1952 1988
NZR 56-foot carriage passenger carriage up to 56 Kapiti Line
Melling Line
Hutt Valley Line
Johnsonville Line
Wairarapa Connection
1937–1945 1988 (except Wairarapa and Capital Connection)
1998 (Capital Connection)
2007 (Wairarapa Connection)
DC class diesel-electric locomotive 4 - Wairarapa Connection 1978–80 2015

Upgrades

In 2008-2011, KiwiRail and GWRC undertook a major upgrade of the Metlink network, dubbed the Wellington Regional Rail Programme (WRPP). The $390 million programme included:

  • The purchase of 48 two-car electric multiple units, the "Matangi" FP/FT class, to replace the aging DM/D class units and to increase capacity.
  • Upgrading the electrification system, including refurbishing the overhead lines and masts and 12 new substations to increase electrical supply for the Matangi units.
  • Upgrading the signalling system, including replacing control systems and signal wiring and hardening the track circuits from interference with the electrification.
  • Upgrading platforms at several stations to accommodate Matangi units and longer train lengths.
  • Upgrading the Johnsonville Line to accommodate both Ganz Mavag and Matangi units, by improving the loading gauge in the tunnels and under some bridges.
  • Lengthening the three crossing loops on the Johnsonville Line to take longer trains.
  • Double-tracking the Kapiti Line from Mackays Crossing through Paraparaumu to just south of Waikanae, to increase capacity. (The double track stops short of Waikanae Station to avoid the cost of building second bridges over State Highway 1 and the Waikanae River.)
  • Electrifying the Kapiti Line from Paraparaumu to Waikanae.
  • Adding additional stabling storage at Paekakariki and Waikanae for the Matangi and Ganz Mavag units.
  • Installing a third, bi-directional, line into between Wellington Station and the Kapiti/Hutt Valley line junction to ease congestion at peak times.

Work started on the programme in 2008, and was largely completed in February 2011.

Funding

In 2011/2012, Tranz Metro had annual operational expenses of $80.437m, and revenues of $80.442m. Most revenue (47% or $37.8m) comes from fares, 22% or $17.69m comes from Wellington Regional Council rates, and 30% or $24.13m from NZ Transport Agency public transport funding.

See also

References

  1. "Wellington Metropolitan Rail 2013/14 Annual Report" (PDF). Greater Wellington Regional Council. 30 June 2014. Archived (PDF) from the original on 24 September 2015. Retrieved 24 July 2015.
  2. "Electric trains come to Wellington". New Zealand History online. 20 December 2012. Archived from the original on 22 January 2013. Retrieved 14 January 2013.
  3. ^ "Wellingtons trains to be run by French company Transdev after KiwiRail loses contract". The Dominion Post. 17 December 2015. Archived from the original on 17 December 2015. Retrieved 21 January 2016.
  4. "Auckland Region Passenger Rail Service Report". Controller and Auditor-General of New Zealand. 4 November 2003. Archived from the original on 8 February 2013. Retrieved 9 January 2012.
  5. "Companies Office - Tranz Metro Auckland Limited". Companies Office. 15 December 2000. Retrieved 10 January 2012.
  6. "Companies Office - Tranz Metro Wellington Limited". Companies Office. 15 December 2000. Retrieved 10 January 2012.
  7. Matthew Dearney (23 August 2004). "New hand on lever of Auckland's trains". New Zealand Herald. Archived from the original on 11 November 2013. Retrieved 9 January 2012.
  8. "Transdev Auckland eyes Kiwirail's Wellington contract". TVNZ. 20 June 2014. Archived from the original on 18 August 2014. Retrieved 19 June 2014.
  9. "Metropolitan Rail Operating Model". Ministry of Transport. October 2009. Archived from the original on 27 September 2011. Retrieved 9 July 2011.
  10. "$168m Wellington Rail Package Signed". The Dominion Post. 5 July 2011. Archived from the original on 8 July 2011. Retrieved 9 July 2011.
  11. "KiwiRail on track with 29% increase in operating surplus". KiwiRail. 29 August 2011. Archived from the original on 24 September 2011. Retrieved 30 August 2011.
  12. "Capital gets $88 million rail upgrade". The Dominion Post. 10 March 2011. Archived from the original on 13 March 2011. Retrieved 26 April 2011.
  13. TRANSDEV HYUNDAI ROTEM ANNOUNCED PREFERRED BIDDER TO OPERATE GREATER WELLINGTON RAIL NETWORK Archived 26 January 2016 at the Wayback Machine, Transdev Australasia, Retrieved 5 January 2016
  14. "Rail contract approved by Greater Wellington". Greater Wellington Regional Council. 29 June 2006. Archived from the original on 22 February 2013. Retrieved 2 October 2009.
  15. "Railfan". New Zealand Railfan. 18 (1). Triple M Publications. December 2011. ISSN 1173-2229.
  16. http://www.gw.govt.nz/story31646.cfm?
  17. Wellington Region Rail Programme (WRRP) Archived 30 April 2009 at the Wayback Machine, Ontrack.
  18. "Wellington Regional Rail Annual Report 2011/2012" (PDF). Archived (PDF) from the original on 23 January 2015. Retrieved 23 February 2014.
Rail operators of New Zealand
Current operators
Former operators
Category: