Misplaced Pages

Datong–Puzhou railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Datong–Puzhou Railway) Railway line in Shanxi, China
Datong–Puzhou railway
Overview
OwnerChina Railway
Termini
History
Opened1940
Technical
Line length864 km (537 mi)
Charactermain line
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV, 50 Hz AC
Tongpu-Line

Legend
km elev
Up arrowBeijing–Baotou railway from Beijing North
0 Datong
Left arrowBeijing–Baotou railway to Baotou
10 Pingwang
19 Hanjialing
30 Libazhuang
42 Huairen
52 Songjiazhuang
65 Jinshatan
76 Beizhouzhuang
85 Daiyue
95 Dongyulin
105 Yuanshulin
116 Shentou
121 Daxin
129 Shuozhou
138 Qianzhai
154 Yangfangkou
166 Ningwu
171 Fenghuangcun
186 Zhangzhen
194 Xuangang
202 Luzhuang
212 Shangyangwu
218 Daniudian
225 Meijiazhuang
Right arrowBeijing–Yuanping railway from Beijing
231 Yuanping
236 Tanglingang
245 Xinkou
251 Buluo
58 Boming
Right arrowXinzhou–Hebian railway to Hebian
267 Xinzhou
273 Tamura
282 Douluo
288 Sizhuang
295 Pingshe
301 Nanhe
308 Beibai
311 Gaocun
318 Baijing
326 Yangqu
333 Nantadi
341 Huanghouyuan
Left arrowShanglancun railway from Shanglancun
346 Taiyuan North
Up arrowDatong–Xi'an HSR from Datong South
Right arrowShijiazhuang–Taiyuan HSR from Shijiazhuang
352 Taiyuan East
355 Taiyuan
Left arrow
Taiyuan–Zhongwei–Yinchuan railway
to Yinchuan, Zhongwei
Left arrowDatong–Xi'an HSR to Xi'an North
364 Beiying
374 Mingli
382 Yuci
Right arrowShijiazhuang–Taiyuan railway to Shijiazhuang
392 Xiuwen
Right arrowTaiyuan–Jiaozuo railway to Jiaozuo
418 Taigu
428 Dongguan
441 Qixian
451 Hongshan
463 Pingyao
474 Zhanglan
484 Yian
494 Jiexiu
Left arrow Jiexiu–Yangquanqu railway to Yangquanqu
501 Yitang
511 Liangdu
521 Lingshi
528 Lengquan
541 Fujiatan
547 Nanguan
555 Shenlin
564 Huozhou
569 Shengfu
576 Xinzhi
584 Shitancun
591 Zhaocheng
598 Xinbao
606 Hongtong
616 Ganting
623 Linfen North
629 Linfen
641 Zhangli
655 Xiangfen
666 Chaizhuang
676 Gaoxian
685 Houma North
689 Houma
Left arrowHouma–Xi'an railway to Xi'an
696 Shidian
703 Liyuan
712 Dongzhen
724 Wenxi
740 Shuitou
745 Xingnan
752 Banpocun
760 Anyi
767 Yuncheng
775 Dianpo
784 Haixian
796 Dongcun
807 Yuxiang
812 Sunchang
823 Yongji
835 Puzhou
843 Hanyang
854 Shouyang
865 Fenglingdu
Up arrow Taiyuan Group
Down arrow Xi'an Group
Fenglingdu Yellow River Railway Bridge
872 Gangkou
878 Gongzhuang
Right arrowLonghai railway from Lianyungang
888 Mengyuan
Down arrowLonghai railway to Lanzhou
This diagram:

The Datong–Puzhou or Tongpu railway (simplified Chinese: 同蒲铁路; traditional Chinese: 同蒲鐵路; pinyin: tóngpǔ tiělù), is a major trunkline railroad in northern China, and the main axial railway of Shanxi Province. The railway is located entirely within Shanxi and diagonally bisects the province from Datong in the northeast to Fenglingdu, near the village of Puzhou, in the southwest corner. The line is named after Datong and Puzhou, and has a total length of 865 km (537 mi). The line is often referred to by its northern and southern halves with Taiyuan, the provincial capital as the midpoint. Southern Tongpu railway from Taiyuan to Fenglingdu is 513 km (319 mi) in length and was built from 1933 to 1935. The Northern Tongpu railway, from Datong to Taiyuan is 351 km (218 mi) in length and was built from 1933 to 1940. Major cities and towns along route include Datong, Huairen, Shuozhou, Ningwu, Yuanping, Xinzhou, Taiyuan, Yuci, Taigu, Qi County, Pingyao, Huozhou, Hongdong, Linfen, Houma and Fenglingdu.

The section between Yuanping and Huairen is quadruple track, but the third/forth track is straight north–south rather than serving Shuozhou and Ningwu. This track is currently part of Datong–Xi'an passenger railway.

History

The Tongpu railway was built during Yan Xishan's administration of Shanxi Province. Yan initially appealed to the central government of the Republic of China for assistance to build a railway in Shanxi, and after being denied funding in 1928, embarked on his own railway building project. He hired a German surveyor team to plan the line. In 1930, when Yan lost power during the Central Plains War, the railway project temporarily halted. In 1932, Yan regained control of Shanxi and formed the Jinsui (Shanxi–Suiyuan) Army Construction Corp to build the line as a 2 ft 6 in (762 mm) narrow gauge railway, which the German team recommended to save cost. Construction began simultaneously on the North and South Tongpu Lines in May 1933. On August 1, 1935, the Taiyuan to Yuanping section entered into operation. By August 1937, the North Tongpu Line had reached within 8 km (5.0 mi) of Datong but the fall of the city to the invading Japanese during the Second Sino-Japanese War halted construction. In 1939, the Japanese used forced labor to work on the remainder of the line. Guerilla activity limited travel speed on the line to 25–35 km/h (16–22 mph). After the end of World War II, Yan regained control of the Shanxi and the Tongpu railway. During the ensuing Chinese Civil War, Communist forces and partisans sabotaged the North Tongpu Line, rendering it unusable until after the conflict. Reconstruction began in November 1949 and the entire line was converted into standard gauge and reopened to traffic in August 1951. In 1957, work began on a bypass between Ningwu and Xuangang through the Duanjialing Tunnel, which at 3,345 m (10,974 ft) was the second longest railway tunnel in China at the time. The tunnel was completed in 1959. In the early 1980s, the North Tongpu Line underwent electrification to increase coal transport capacity.

Rail connections

See also

References

  1. (Chinese) 从修筑同蒲铁路看阎锡山其人 Last Accessed 2011-08-12
  2. ^ (Chinese) 同蒲铁路简介 Archived 2013-02-21 at archive.today Last Accessed 2011-08-12
Categories: