Misplaced Pages

Datong Bridge station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Ningbo Metro station
Datong Bridge
大通桥
General information
LocationJiangbei District, Ningbo, Zhejiang
China
Operated byNingbo Rail Transit Co. Ltd.
Line(s)     Line 2
     Line 3
Platforms4 (2 island platform)
Construction
Structure typeUnderground
History
Opened26 September 2015
Services
Preceding station Ningbo Rail Transit Following station
Yasaiyantowards Lishe International Airport Line 2 Kongputowards Honglian
Terminus Line 3 Zhongxing Bridge Southtowards Jinhai Road

Datong Bridge Station is an underground metro station of Line 2 and Line 3 in Ningbo, Zhejiang, China. It situates on the crossing of Qingyun Road and Jintang Road. Construction of the station started in late 2010 and opened to service in September 26, 2015. In June 2019, Datong Bridge Station became a transfer station between Line 2 and Line 3.

Exits

Datong Bridge Station has 4 exits.

No Suggested destinations
A Qingyun Road
D Qingyun Road
E Qingyun Road, Jintang Road
F Huancheng North Road, Jintang Road

References

  1. 陈锦源 (2010-12-23). "2号线车站设计人性化而有宁波味 效果图抢先看". 中国宁波网. Retrieved 2011-01-21.
  2. "宁波轨道交通 > 乘客服务 > 综合查询". 宁波市轨道交通集团有限公司. Archived from the original on 2015-09-22. Retrieved 2015-09-27.
Ningbo Rail Transit stations
Line 2
Line 3
Phase 1
Phase 2
Lines and stations that are proposed, under planning or under construction are shown in italics.

29°54′15″N 121°34′55″E / 29.9042°N 121.5820°E / 29.9042; 121.5820


Stub icon

This article about a railway station in Zhejiang is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This Chinese rapid transit article is a stub. You can help Misplaced Pages by expanding it.

Categories: