Dholera Solar Park is a planned, large scale solar project in Dholera Special Investment Region (DSIR), Gujarat. It is categorised as an Ultra Mega Solar Power Project, by the Ministry of New and Renewable Energy of the Central Government of India; the capacity will be 5 GW by 2030.

History

Background

The Government of India has a target of increasing power generated from renewable energy sources to 175 GW by 2022. The National Solar Mission (NSM) has a target of achieving 100GW of grid-connected power generation from solar energy by 2022. India originally had a target of 20GW by 2022; this target was achieved with four years to go. Following this the Narendra Modi government increased the target to 100GW.

The Chief Minister of Gujarat approved the Dholera Solar Park in April 2018.

Auctions

Auctions have been held in 2020. An excess response of 600 MW was seen. The discovered tariff was between 2.78 (equivalent to ₹3.00 or 3.6¢ US in 2023) and 2.81 (equivalent to ₹3.00 or 3.6¢ US in 2023) per unit. Five companies were allotted 100-200MW each. However following lower tariffs of 1.99 (equivalent to ₹2.00 or 2.4¢ US in 2023) per unit during subsequent auctions, the original contracts were cancelled and new tenders were placed. In 2018 and 2019 similar cancellations in Gujarat had taken place. These cancelled contracts in Gujarat have resulted Uttar Pradesh also cancelling bids of a 500 MW solar auction.

See also

References

  1. "Dholera Solar Park, Gujarat". Power Technology. Retrieved 2021-05-16.
  2. Gupta, Uma (17 March 2021). "Gujarat retenders 700 MW in Dholera Solar Park and 100 MW in Raghanesda". pv magazine India. Retrieved 2021-05-16.
  3. "TATA Power lays foundation of 400 MW (AC) Solar Power Project at the 5000 MW Solar Park in Dholera Special Investment Region in Gujarat". EquityBulls. 2020-10-17. Retrieved 2021-05-16.
  4. "Gujarat's solar flip ups the risk of a larger flop". mint. 2021-02-09. Retrieved 2021-05-16.
  5. Dave, Kapil Dave (11 April 2018). "5,000MW solar park to come up in Dholera". The Times of India. Retrieved 2021-05-22.
  6. "Current Status | Ministry of New and Renewable Energy, Government of India". Ministry of New and Renewable Energy, Government of India. Archived from the original on 21 April 2021. Retrieved 2021-05-22.
  7. "Is India's solar power sector ready for its technology-driven metamorphosis?". ETEnergyworld. 3 February 2021. Retrieved 2021-05-22.
  8. "World's largest solar park to come up in Gujarat: CM Vijay Rupani". The Economic Times. PTI. 10 April 2018. Retrieved 2021-05-22.
  9. ^ Chandrasekaran, Kaavya (1 February 2021). "Gujarat cancels results of solar auctions, feels tariffs are high". ETEnergyworld. Retrieved 2021-05-22.
  10. Prateek, Saumy (1 August 2020). "Dholera Solar Park Tender Oversubscribed by 600 MW - Saur Energy International". Saur Energy. Retrieved 2021-06-03.
  11. Prasad, Nithin Thomas (2021-02-03). "In Another Bad Precedent, Gujarat Regulator Allows DISCOM to Scrap 700 MW Solar Auction". Mercom India. Retrieved 2021-06-03.
  12. Ranjan, Rakesh (2021-06-03). "Uttar Pradesh Scraps 500 MW Solar Auction, Plans to Re-Auction Hoping for Lower Bids". Mercom India. Retrieved 2021-06-03.
Solar power in India
Power plants
Ultra Mega (>500 MW)
Above 100 MW
Below 100 MW
Policies/programmes
Agencies
Companies


This article about an Indian power station is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This article about renewable energy plants is a stub. You can help Misplaced Pages by expanding it.

Categories: