Misplaced Pages

Eagle-class patrol craft

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Eagle Boats)

Eagle 35 and Eagle 58
Class overview
NameEagle
Operators United States Navy
Completed60
General characteristics
TypePatrol craft
Displacement615 long tons (625 t)
Length200.8 ft (61.2 m)
Beam33.1 ft (10.1 m)
Draft8.5 ft (2.6 m)
Propulsion
  • Poole geared steam turbine, 2,500 shp (1,864 kW)
  • 1 screw
Speed18.32 knots (33.93 km/h; 21.08 mph)
Complement5 officers, 56 men
Armament

The Eagle-class patrol craft were anti-submarine vessels of the United States Navy that were built during World War I using mass production techniques. They were steel-hulled ships smaller than contemporary destroyers but having a greater operational radius than the wooden-hulled, 110-foot (34 m) submarine chasers developed in 1917. The submarine chasers' range of about 900 miles (1,400 km) at a cruising speed of 10 knots (19 km/h; 12 mph) restricted their operations to off-shore anti-submarine work and denied them an open-ocean escort capability; their high consumption of gasoline and limited fuel storage were handicaps the Eagle class sought to remedy.

They were originally commissioned USS Eagle Boat No.1 (or 2,3..etc.) but this was changed to PE-1 (or 2,4.. etc.) in 1920. They never officially saw combat in World War I, but some were used during the Allied intervention in the Russian Civil War. PE-19, 27, 32, 38, 48 and 55–57 survived to be used in World War II.

Attention turned to building steel patrol vessels. In their construction, it was necessary to eliminate the established shipbuilding facilities as possible sources of construction as they were totally engaged in the building of destroyers, larger warships, and merchant shipping. Accordingly, a design was developed by the Bureau of Construction and Repair which was sufficiently simplified to permit speedy construction by less experienced shipyards.

Involvement of Ford Motor Company

In June 1917, President Woodrow Wilson had summoned auto-builder Henry Ford to Washington in the hope of getting him to serve on the United States Shipping Board. Wilson felt that Ford, with his knowledge of mass production techniques, could immensely speed the building of ships in quantity. Apprised of the need for anti-submarine vessels to combat the U-boat menace, Ford replied, "what we want is one type of ship in large numbers."

On 7 November, Ford accepted membership on the Shipping Board and an active advisory role. Examining the Navy's plans for the projected steel patrol ships, Ford urged that all hull plates be flat so that they could be produced quickly in quantity and he also persuaded the Navy to accept steam turbines instead of reciprocating steam engines.

At this point, Secretary of the Navy Josephus Daniels was drawn into the project. He recognized that no facilities were available at the Navy yards for building new craft and asked Ford if he would undertake the task. Ford agreed, and, in January 1918, he was directed to proceed with the building of 100 of them. Later on, 12 more were added for delivery to the Italian government.

The first boat was launched on 11 July 1918. According to Ford, "They were built simply by applying our production principles to a new product."

Construction

Ford's plan for building the ships was revolutionary. Establishing a new plant on the River Rouge on the outskirts of Detroit, he proposed to turn them out as factory products, using mass production techniques, and employing factory workers. He would then send the boats by the Great Lakes and the St. Lawrence River to the Atlantic coast. However, Ford had little part in the design of the boats. Except for his insistence upon simple plans and the use of steam turbines, he contributed little of a fundamental nature to the design concept.

First, Ford engineers built a full-scale pattern at the company's Highland Park facility, giving both the Ford team and the Naval officers an opportunity to correct flaws in the rough initial design and decide on the placement of all rivet holes in the craft, as well as allowing the carmaker's production experts the chance to compose specifications for the manufacturing and assembly processes.

The assembly plant was completed in five months, and the first keel was laid in May 1918. The machinery and fittings were largely built at Ford's Highland Park plant in Detroit, although the new River Rouge plant, given impetus by the war, saw a good deal of the steel sheets and other parts formed and fabricated there in the A-Building, or fabricating building. At first, Ford believed that boats could be sent down a continuously moving assembly line like automobiles. The size of the craft made this too difficult, however, and a "step-by-step" movement was instituted on the 1,700-foot (520 m) line, entailing seven separate assembly areas, followed by the addition of a 200-foot (61 m) extension to the assembly facility, or B-Building, to support a pre-assembly stage. Unfortunately, the Eagles suffered from various issues due to Ford's institutional inexperience with shipbuilding: for instance, the Model T did not use electric arc welding, and the resulting workmanship on the Eagle boats was so poor that the superintending constructor requested that Ford workers do as little welding as possible on water-tight and oil-tight bulkheads. Additionally, the use of ladders instead of scaffolds caused major difficulties—the attempted bolting of plates, carried out by workers wielding short-handled wrenches on ladders meant that the bolters were unable to apply sufficient force to bring the plates together tightly. Metal shavings between plates then made the riveters' task of pulling the plates together for a seal practically impossible.

The first Eagle boat was launched on 11 July. The launching of these 200-foot (61 m) craft was a formidable operation. Not built on slipways from which they could slide into the water, the hulls moved slowly from the assembly line on enormous, tractor-drawn flatcars. They were then placed on a 225-foot (69 m) steel trestle alongside the water's edge which could be sunk 20 feet (6.1 m) into the water by hydraulic action. The plan was to fit the Eagles out with all the basic equipment of a warship—turbines, weaponry, wiring, etc.--after launch, but this quickly became a choke point due to the cramped spaces on the boats themselves, and violated Ford's own mass production ethos.

The original expectation, set out in a contract between Ford and the Navy on 1 March 1918, was for delivery of 100 ships: "one by mid-July, ten by mid-August, twenty by mid-September, and twenty-five each month thereafter," or approximately one new Eagle boat completed each working day of the month. The first seven boats were not completed until the end of 1918, and succeeding boats were plagued by issues such as leaky fuel oil compartments. This state of affairs continued, even though the labor force reached 4,380 by July and later peaked at 8,000. The chief reasons were Ford's excessive initial optimism and the inexperience of labor and supervisory personnel in shipbuilding. Upon the signing of the Armistice in November 1918, the number under contract, previously raised from 100 to 112, was cut to 60. Of these, seven were commissioned in 1918, and the remaining 53 were commissioned in 1919.

The entire Eagle Boat operation came briefly under challenge by Senator Henry Cabot Lodge of Massachusetts in December 1918. At the ensuing Congressional hearings, Navy officials successfully defended the boats as being a necessary experiment and well made while Ford profits were proved to be modest. However, historian David Hounshell states that "the Eagle boat venture cannot be considered successful by the standards of the war era or the present," and today serves as a case study in the history of technology to illustrate the difficulty in transferring knowledge and techniques between superficially similar, but fundamentally different, fields of endeavor.

U.S. service

USS Eagle 2 (PE-2) on builder's trials in 1918.
USS Eagle 57 (PE-57) in 1933.

The term "Eagle Boat" stemmed from a wartime editorial in The Washington Post which called for "...an eagle to scour the seas and pounce upon and destroy every German submarine." However, the Eagle Boats never saw service in World War I.

Reports on their performance at sea were mixed. The introduction, at Ford's insistence, of flanged plates instead of rolled plates facilitated production but resulted in sea-keeping characteristics which were far from ideal.

In the first years after the war, a number of them were used as aircraft tenders. Despite the handicap of their size, they serviced photographic reconnaissance planes at Midway in 1920 and in the Hawaiian Islands in 1921 before being supplanted by larger ships. Eagle boat 34, as related in Max Miller's 1932 book I Cover The Waterfront, shared the yearly duty alternately with the Navy tug USS Koka of capturing elephant seals on Mexico's Guadalupe Island for the San Diego Zoo.

Five of the Eagle Boats were transferred to the United States Coast Guard in 1919 but proved unsuitable for service because poor maneuvering characteristics and sea-keeping qualities. The balance were sold in the 1930s and early 1940s.

Eight Eagle boats saw service during World War II. One was stationed in Miami as a training vessel., while one, Eagle 56, was sunk by a German submarine near Portland, Maine in April 1945. After the war, the seven remaining Eagle Boats were decommissioned.

Ships

Designation Keel Laid Launched Commissioned Fate
PE-1 7 May 1918 11 July 1918 27 October 1918 Sold 11 June 1930
PE-2 10 May 1918 19 August 1918 11 July 1918 Sold 11 June 1930
PE-3 16 May 1918 11 September 1918 11 November 1918 Sold 11 June 1930
PE-4 21 May 1918 15 September 1918 14 November 1918 Sold 11 June 1930
PE-5 28 May 1918 28 September 1918 19 November 1918 Sold 11 June 1930
PE-6 3 June 1918 16 October 1918 21 November 1918 Expended as target 30 November 1934
PE-7 8 June 1918 5 October 1918 24 November 1918 Expended as target 30 November 1934
PE-8 10 June 1918 11 November 1918 31 October 1919 Sold 1 April 1931
PE-9 17 June 1918 8 November 1918 27 October 1919 Sold 26 May 1930
PE-10 6 July 1918 9 November 1918 31 October 1919 Destroyed 19 August 1937
PE-11 13 July 1918 14 November 1918 29 May 1919 Sold 16 January 1935
PE-12 13 July 1918 12 November 1918 6 November 1919 Sold 30 December 1935
PE-13 15 July 1918 9 January 1919 2 April 1919 Sold 26 May 1930
PE-14 20 July 1918 23 January 1919 17 June 1919 Expended as target 22 November 1934
PE-15 21 July 1918 25 January 1919 11 June 1919 Sold 14 June 1934
PE-16 22 July 1918 11 January 1919 5 June 1919 Transferred to USCG 19 December 1919 as McGourty
PE-17 3 August 1918 1 February 1919 3 July 1919 Wrecked off Long Island, New York 22 May 1922
PE-18 5 August 1918 10 February 1919 7 August 1919 Sold 11 June 1930
PE-19 6 August 1918 30 January 1919 25 June 1919 In service during WWII
Destroyed 6 August 1946
PE-20 26 August 1918 15 February 1919 28 July 1919 Transferred to USCG 26 November 1919 as Scally
PE-21 31 August 1918 15 February 1919 31 July 1919 Transferred to USCG 19 December 1919 as Bothwell
PE-22 5 September 1918 10 February 1919 17 July 1919 Transferred to USCG 19 December 1919 as Earp
PE-23 11 September 1918 20 February 1919 19 June 1919 Sold 11 June 1930
PE-24 13 September 1918 24 February 1919 12 July 1919 Sold 11 June 1930
PE-25 17 September 1918 19 February 1919 30 June 1919 Capsized in Delaware Bay squall 11 June 1920
PE-26 25 September 1918 1 March 1919 1 October 1919 Sold 29 August 1938
PE-27 22 October 1918 1 March 1919 14 July 1919 In service during WWII
Sold 4 June 1946
PE-28 23 October 1918 1 March 1919 28 July 1919 Sold 11 June 1930
PE-29 18 November 1918 8 March 1919 20 August 1919 Sold 11 June 1930
PE-30 19 November 1918 8 March 1919 14 August 1919 Transferred to USCG 19 December 1919 as Carr
PE-31 19 November 1918 8 March 1919 14 August 1919 Sold 18 May 1923
PE-32 30 November 1918 15 March 1919 4 September 1919 In service during WWII
Sold 3 March 1947
PE-33 14 February 1918 15 March 1919 4 September 1919 Sold 11 June 1930
PE-34 8 January 1919 15 March 1919 3 September 1919 Sold 9 June 1932
PE-35 13 January 1919 22 March 1919 22 August 1919 Sold 7 June 1938
PE-36 22 January 1919 22 March 1919 20 August 1919 Sold 27 February 1936
PE-37 27 January 1919 25 March 1919 30 September 1919 Sold 11 June 1930
PE-38 30 January 1919 29 March 1919 30 July 1919 In service during WWII
Sold 3 March 1947
PE-39 3 February 1919 29 March 1919 20 September 1919 Sold 7 June 1938
PE-40 7 February 1919 5 April 1919 1 October 1919 Expended as target 19 November 1934
PE-41 20 February 1919 5 April 1919 26 September 1919 Sold 11 June 1930
PE-42 13 February 1919 17 May 1919 3 October 1919 Sold 11 June 1930
PE-43 17 February 1919 17 May 1919 2 October 1919 Sold 26 May 1930
PE-44 20 February 1919 24 May 1919 30 September 1919 Disposed of 14 May 1938
PE-45 20 February 1919 17 May 1919 2 October 1919 Sold 11 June 1930
PE-46 24 February 1919 24 May 1919 3 October 1919 Sold 10 December 1936
PE-47 3 March 1919 19 June 1919 4 October 1919 Sold 30 December 1935
PE-48 3 March 1919 24 May 1919 8 October 1919 In service during WWII
Sold 10 October 1946
PE-49 4 March 1919 14 June 1919 10 October 1919 Sold 20 September 1930
PE-50 10 March 1919 18 July 1919 6 October 1919 Sold 11 June 1930
PE-51 10 March 1919 14 June 1919 2 October 1919 Sold 29 August 1938
PE-52 10 March 1919 9 July 1919 10 October 1919 Sold 29 August 1938
PE-53 17 March 1919 13 August 1919 20 October 1919 Sold 26 August 1938
PE-54 17 March 1919 17 July 1919 10 October 1919 Sold 26 May 1930
PE-55 17 March 1919 22 July 1919 10 October 1919 In service during WWII
Sold 3 March 1947
PE-56 25 March 1919 15 August 1919 26 October 1919 In service during WWII
Torpedoed by U-853 off Portland, Maine, on 23 April 1945
PE-57 25 March 1919 29 July 1919 15 October 1919 In service during WWII
Sold 5 March 1947
PE-58 25 March 1919 2 August 1919 20 October 1919 Disposed of 30 June 1940
PE-59 31 March 1919 12 April 1919 19 September 1919 Sold 29 August 1938
PE-60 31 March 1919 13 August 1919 27 October 1919 Sold 29 August 1938

PE-61 through PE-112 were canceled on 30 November 1918. PE-5, PE-15, PE-25, PE-45, PE-65, PE-75, PE-86, PE-95, PE-105, and PE-112 were allotted for transfer to Italy, though this plan was cancelled and none were ever delivered.

See also

References

  1. ^ Cianflone, Frank A. "The Eagle Boats of World War I" United States Naval Institute Proceedings June 1973 pp.76–80
  2. Silverstone, Paul H. U.S. Warships of World War II, Doubleday & Company (1968) p.252
  3. Ford, Henry (2019). My Life and Work. Columbia. p. 119. ISBN 9781545549117.{{cite book}}: CS1 maint: location missing publisher (link)
  4. ^ Hounshell, David (1985). "Chapter 4: Ford Eagle Boats and Mass Production during World War I". In Smith, Merritt (ed.). Military Enterprise and Technological Change: Perspectives on the American Experience. Cambridge: The MIT Press. pp. 175–202. ISBN 0-262-19239-X.
  5. "I Cover The Waterfront, Chapter II (Max Miller, 1932, serialized in The San Diego Reader, February 19, 2004".
  6. Johnson, Robert Irwin (1987). Guardians of the Sea, History of the United States Coast Guard, 1915 to the Present. Naval Institute Press, Annapolis, Maryland. p. 65. ISBN 978-0-87021-720-3.
  7. Sears, David, The Last Epic Naval Battle: Voices from Leyte Gulf, NAL Caliber 2005 pg. 16
  8. ^ Silverstone, Paul (2013) The New Navy, 1883-1922, Routledge, pp.108-109. ISBN 9781135865429.
  9. ^ Canney, Donald. US Coast Guard and Revenue Cutters, 1790-1935. p. 77.

Public Domain This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. See here for text

External links

Eagle-class patrol craft
List of patrol vessels of the United States Navy
Category: