Misplaced Pages

Ferrocarrils de la Generalitat Valenciana

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Transport company in Valencia, Spain
Ferrocarrils de la Generalitat Valenciana
IndustryRailway
Founded10 November 1986
HeadquartersValencia
Key peopleRebeca Torró (President)
Josep Vicent Boira i Maiques (Vice-President)
Websitewww.fgv.es

Ferrocarrils de la Generalitat Valenciana (Valencian pronunciation: [ˌfɛrokaˈrilz ðe la dʒeneɾaliˈtad valensiˈana], "Valencian Government Railways") or FGV is a Valencian public railway company which operates several 1,000 mm (3 ft 3+3⁄8 in) metre gauge lines, in the autonomous community of Valencia, Spain.

The company currently operates the city metro and tram system of Valencia (Valencia Metro) and Alicante (Alicante Tram).

It also operates a non-electrified 62 km (39 mi) long line, between Benidorm and Dénia, in Alicante province.

The company is owned by the Generalitat Valenciana (i.e. the autonomous government body of the Valencian Community).

History

Establishment of FGV

FGV was founded as a company in 1986, and on 1 January 1987 took over all remaining narrow gauge railways in the Valencian Community. These had previously been part of the nationally owned FEVE system.

The newly formed railway system consisted of various electrified suburban lines around Valencia and the diesel-worked Alicante to Denia railway. Much of the infrastructure was in a poor state following years of neglect by the FEVE administration and patronage was consequently low.

Investment in the Valencia system

The early years of FGV saw much investment in the Valencia suburban system. The lines to the north and south of the city were connected by cross-town tunnels which were developed into the current metro system. FGV also introduced the first modern tram in Spain, partly running on the alignment of narrow gauge railways.

Both the metro and trams systems are being developed through the addition of new lines. Projects are also in hand to modernise the classic parts of the system through realignments and new rolling stock.

Investment in the Alicante system

In Alicante too, the narrow gauge railway is being developed into a modern tramway. It has been extended through a tunnel to Mercado and will ultimately reach the RENFE railway station through an extension of this tunnel. The tram system is also being extended in other directions.

The Alicante to Dénia railway line is being electrified as far as Benidorm and will be served by tram-trains (vehicles that can run on both railway and tramway infrastructure). The remaining section to Denia will continue to be diesel-worked for the time being and trainsets have been modernised for this purpose.

In Benidorm, a local tram service is also being planned. This will branch off the main railway line and serve the centre of this town.

Future projects

FGV is seeking to take over the Xàtiva to Alcoi railway from Renfe. The mountain railway is currently in a poor state and served only by three trains per day and direction. The company also provided assessment to the city of Rosario in Argentina for its future Rosario Tramway, a project which is largely based on the Valencia system.

Rolling stock

In use

Series Photo Year Builder Length Passengers Units Communications ATO Lines Depot Notes
3800 1994–1995 (3801–3821), 1998 (3822–3825) Siemens and Duewag (electronics);
CAF and GEC-Alsthom (cars)
23.78 m or 78 ft 1⁄4 in 201 (65 seats) 25 (3801–3825) Standard GSM no Tarongers Oldest operating units in the network
3900 with ATO 1994–1995 GEC-Alsthom 60 m or 196 ft 10+1⁄4 in 596 (120 seats) 2 (3910 and 3916) UIC 751-3 yes Hermanos Machado ATO installed in 2011
4200 2006–2007 Bombardier 32.366 m or 106 ft 2+1⁄4 in 277 19 (4201–4219) Standard GSM no Tarongers
4300 (4 cars) 2007 Vossloh España 60.49 m or 198 ft 5+1⁄2 in 588 (116 seats) 42 UIC 751-3 yes Hermanos Machado, Valencia Sud and Torrent
4300 (5 cars) 75 m or 246 ft 3⁄4 in 750 20

Former rolling stock

Series Photo Year Builder Length Passengers Units Communications ATO Depot Notes
UTE3600 Series 1982–1983 Babcock & Wilcox 47.166 m or 154 ft 8+7⁄8 in ? 10 manufactured, 3 units preserved (3602, 3604 and 3609) UIC 751-3 no Torrent
3700 Series 1987–1990 CAF, MTM, BBC, ASEA, MACOSA 47.166 m or 154 ft 8+7⁄8 in ? 40 manufactured UIC 751-3 no Torrent

References

  1. Licitarán tranvía para Rosario - EnElSubte, 22 July 2015.
  2. "digit5.qxp" (PDF). Retrieved 2020-02-27.
  3. José Mariano Rodríguez - FFE. "Material - Revista VÍA LIBRE - Fundación de los Ferrocarriles Españoles". Vialibre-ffe.com. Retrieved 2020-02-27.
  4. ^ "Metrovalencia - Parque móvil". Archived from the original on 2014-12-19. Retrieved 2014-08-25.
  5. ^ Vía Libre. "Nuevos coches intermedios para las unidades 3900 de FGV". Vialibre-ffe.com. Retrieved 2020-02-27.
  6. "Listadotren.es". Listadotren.es. 2019-06-30. Retrieved 2020-02-27.
  7. Can be seen on the front of the units
  8. ^ José Mariano Rodríguez - FFE. "Material - Revista VÍA LIBRE - Fundación de los Ferrocarriles Españoles". Vialibre-ffe.com. Retrieved 2020-02-27.
  9. "Listadotren.es". Listadotren.es. 2017-04-22. Retrieved 2020-02-27.

External links

Rail transport in Spain
Operators
Passenger
Regional
Freight
Commuter rail
Metro
Light rail/Tram-train
Tram
Active
Heritage
Defunct
Proposed/planned
Categories: