Fierza Hydroelectric Power Station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Dam in Albania
Fierza Hydropower Plant
Fierza Hydroelectric Power Station in 2013.
Official nameHidrocentrali i Fierzës
LocationAlbania
Coordinates42°15′05″N 20°02′35″E / 42.25139°N 20.04306°E / 42.25139; 20.04306
Construction began1971
Opening date1978
Dam and spillways
Type of damRock-fill dam
ImpoundsDrin River
Height167 m (548 ft)
Length380 m (1,250 ft)
Width (base)576 m (1,890 ft)
Reservoir
CreatesFierza Reservoir
Total capacity28,000,000,000 m (9.9×10 cu ft)
Catchment area11,829 km (4,567 sq mi)
Surface area72.5 km (28.0 sq mi)
Maximum water depth128 m (420 ft)
Power Station
Operator(s)Albanian Power Corporation
Hydraulic head118 m
Turbines4 × 125 MW
Installed capacity500 MW
Annual generation1,330 GWh

The Fierza Hydroelectric Power Station (Albanian: Hidrocentrali i Fierzës) is a large hydroelectric power station on the Drin River, in Albania.

Fierza is the upper HPP (Hydro Power Plant) of the Drin River cascade followed by the power stations of Koman and Vau i Dejës downstream. Based on the installed power capacity, position and the volume of the reservoir, Fierza plays a key role in the exploitation, regulation and safe operation of the Drin cascade.

Work for its construction began in 1970. The first power unit became operational in 1978 and the plant was fully operational in 1980. Fierza HPP was built with equipment mostly from China but on the concepts of Albanian engineers. Around 14,000 workers, engineers and specialist were involved in the construction of the plant.

Fierza is a HPP with a rock-fill dam with a clay core and reservoir. When it was built, Fierza was the second in Europe for the height of its type. The dam has a total volume of 8 million m3.

This rock-fill dam measures 167 m (548 ft) in height, and 380 m (1,250 ft) in length along the crest. Construction began in 1971 and was completed seven years later in 1978. The dam is one of the three hydroelectric dams on the Drin River. The reservoir was filled with water between 1978 and 1981.

The four units installed in the plant have "Francis" vertical turbines with 125 MW power each; 3-Phase synchronous generators of 13.8kV voltage; and lifting transformers 13.8kV/242 kV for the connection with the transmission substation.

The annual output of Fierza HPP averages in 1,330 GWh, that represent approximately 33% of Drin cascade production.

The importance of Fierza, beside energy production, relates on the capacity of its lake which regulates the annual inflows and increase the efficient use of the Drin cascade.

See also

References

  1. "Infoset Fierza 2015" (PDF). www.kesh.al. KESH sh.a. Archived from the original (PDF) on 2016-06-02.
  2. ^ Paul G. Marinos (1 January 2001). Engineering Geology and the Environment. A.A. Balkema. p. 3707. ISBN 978-90-5410-882-5. Retrieved 26 September 2013.