You can help expand this article with text translated from the corresponding article in Persian. (December 2023) Click for important translation instructions.
|
Freeway 16 | |
---|---|
16 آزادراه | |
Tabriz–Urmia Freeway آزادراه تبریز-ارومیه | |
Tabriz–Urmia | |
Length | 118 km (73 mi) |
From | Urmia, West Azerbaijan Khatam ol-Anbia Expressway Abuzr Street |
Major intersections | Road 21 near Khaseban, East Azerbaijan |
From | Near Sahand, East Azerbaijan Tabriz–Sahand Freeway |
Tabriz–Sahand Freeway | |
Length | 19 km (12 mi) |
From | Sahand Phase 3, East Azerbaijan |
Major intersections | Tabriz–Urmia Freeway towards Urmia Tashayyo' Blvd., Shahrak-e Andisheh |
From | Tabriz, East Azerbaijan Tabriz Southern Bypass Freeway |
Tabriz Second Southern Bypass Freeway | |
Length | 30 km (19 mi) |
From | Tabriz, East Azerbaijan Tabriz Western and Southern Bypass Freeway |
Major intersections | Tabriz–Sahand Freeway Tabriz–Zanjan Freeway |
From | Near Basmenj, East Azerbaijan Tabriz–Tehran Exp'way - Tabriz–Ahar Exp'way |
Location | |
Country | Iran |
Provinces | East Azerbaijan, West Azerbaijan |
Major cities | Urmia, West Azerbaijan Osku, East Azerbaijan Sahand, East Azerbaijan Tabriz, East Azerbaijan Basmenj, East Azerbaijan |
Highway system | |
Tabriz–Urmia Freeway (Persian: آزادراه تبریز-ارومیه) is a partially built freeway project in Northwestern Iran, East Azerbaijan and West Azerbaijan provinces, connecting the two cities of Tabriz and Urmia. It serves as a major link, with the bridge over Urmia Lake, connecting Urmia to the rest of the country via Tabriz and Freeway 2. The project consists of several segments.
Segment 1 connects the city of Urmia to the western shore of Urmia Lake. Segment 2 is the causeway and bridge over the lake. These two segment opened to traffic on 2017. Segment 3 is a segment through the mountainous Islami Island. This segment consists of a 2 km long twin tunnel, and is currently under construction. Segment 4 runs from the start of the swampy territory to the east of Islami Island, running mostly on an embankment, towards Tabriz–Maragheh Expressway. This segment opened to traffic in August 2019. Segment 5 connects the end of Segment 4 at Khaseban to Sahand, connecting to the Tabriz–Sahand Freeway Segment.
Tabriz–Sahand Freeway segment started several years before the finalization of the plans on how the end of Segment 4 will connect to the city of Tabriz, and initially it was not supposed to be part of the Freeway, as the freeway was planned to run on the west of the existing Tabriz–Maragheh Expressway to Tabriz Western Bypass Freeway. However, now this segment will constitute the last stretch of Freeway connecting the two cities.
Segment 6, also functioning as Tabriz Second Southern Bypass Freeway, planned to take over the function of Tabriz Southern Bypass Freeway will run from west to east. Its construction started on the Summer of 2019. It will also serve as a connector from Urmia towards Tehran, bypassing the city of Tabriz
Tabriz–Urmia Freeway
From West to East | ||
---|---|---|
From East to West |
Tabriz–Sahand Freeway
From South to North | ||
---|---|---|
Shahid Porsharifi Square |
Sahand East to Tabriz-Tehran West to City Center-Urmia | |
Esnajan | ||
Tabriz Southern bypass freeway (Kasaei freeway) East to Tabriz-Zanjan-Tehran West to Urmia-Tabriz International Airport | ||
Sahandieh Square |
Tabriz South to Sahand-Tehran | |
From North to South |
Tabriz Second Southern Bypass Freeway
From West to East | ||
---|---|---|
From East to West |
Roads and highways in Iran | ||||||
---|---|---|---|---|---|---|
Freeways |
| |||||
First-Class Roads |