Misplaced Pages

Geita Gold Mine

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Geita Mine) Open pit gold mine in Tanzania
Geita
Geita open pit mine
Location
Geita Gold Mine is located in TanzaniaGeita Gold MineGeita Gold MineLocation of Geita Gold MineShow map of TanzaniaGeita Gold Mine is located in AfricaGeita Gold MineGeita Gold MineGeita Gold Mine (Africa)Show map of AfricaGeita Gold Mine is located in EarthGeita Gold MineGeita Gold MineGeita Gold Mine (Earth)Show map of Earth
LocationGeita
RegionMwanza
CountryTanzania
Coordinates02°50′S 032°18′E / 2.833°S 32.300°E / -2.833; 32.300
Production
Production272,000
Financial year2009
History
Opened2000
Owner
CompanyAngloGold Ashanti
WebsiteAngloGold Ashanti website

The Geita Gold Mine is an open pit gold mine located in the Geita District of the Geita Region (formerly part of the Mwanza Region) of Tanzania. It is operated by AngloGold Ashanti.

In 2008, the mine accounted for 6% of the company's overall annual gold production and employed close to 3,200 staff.

Early development (1930s)

Gold mining in Tanzania in modern times dates back to the German colonial period, beginning with gold discoveries near Lake Victoria in 1894. The first gold mine in what was then German East Africa, the Sekenke Gold Mine, began operation in 1909, and gold mining in Tanzania experienced a boom between 1930 and World War II.

In 1898, a German prospector found gold mineralization in the Geita area. Plans for a gold mine in the region was disrupted by the World War I. The Treaty of Versailles granted Tanzania, then part of German East Africa to Britain.

In the 1930s Tanganyika Concessions learned that gold prospectors were having success in the area near Mgusu, southwest of Lake Victoria, and in 1934 formed Kentan Gold Area Limited to develop these finds. It did so through its subsidiaries Saragura Development Company Limited and Geita Gold Mining Company Limited. The Geita Gold Mining Company was set up to operate the Geita Gold Mine in Tanganyika, which was transferred to it from the Sagura Development Company.

Production began in 1936. A 1937 report said it hoped to soon start crushing 500 tons per day, and could well become the largest gold producer in East Africa. The company had built a road from the mine to Lake Victoria, where it had built a jetty. It had built housing, medical facilities, set up a private wireless station and subsidized a weekly air service. Gold milling began in Geita in December 1938. Simultaneously, artisanal mining was made illegal during the British colonial period.

Post-World War II (1945–1965)

After World War II, production was increased at Geita. By 1948, ore was recovered at three levels, processed in ball mills and gold recovered by the cyanide process. Ore was also recovered from a mine at Ridge Eight and carried 13 km to Geita by aerial ropeway. The General Manager and mine manager Art Sadler were Canadian; the company Secretary was Steve Charlton and the chief accountant Mildred Hayward. The company employed about 20 European specialists and 300 African miners. Electric power was provided from wood gasification plant feeding a Crossley engine giving 2 megawatt capacity. Gold was smelted and shipped monthly by road to Mwanza; in the rainy season the road became impassable and a DH Dragon was charted to collect the ingots from a rudimentary airstrip for transport to Dar es Salaam. Two prospectors were employed and ore samples assayed continuously by the lead/silver/acid process, A level of 6 dwt per ton was considered minimum economical level for recovery. In 1951 an eight-inch pipeline was laid to bring water 15 miles from Lake Victoria.

In the early 1950s, Geita employed about 2,000 men and produced more than half of the gold mined in Tanganyika, although this was much less than the peak production before World War II (1939–1945). Geita struggled with financial problems until it closed in 1965, and seems to have been a net liability to TCL. The mine produced over 1 million ounces of gold between 1936 and 1966.

By 1967, gold production in the country had dropped to insignificance but was revived in the mid-1970s, when the gold price rose once more. In the late 1990s, foreign mining companies started investing in the exploration and development of gold deposits in Tanzania, leading to the opening of a number of new mines.

The British banned artisanal mining in 1938 and it continued until 1979 despite Tanzania's independence in 1971. With the country's economic problems and international rise in gold prices, the postcolonial government lifted the ban in 1979.

Revival (2000 to present)

The Geita mine re-commenced production in 2000, initially as a joint venture of AngloGold and Ashanti. With the merger of the two companies in 2004, the mine became fully owned by AngloGold Ashanti. The mine was inaugurated by then-Tanzanian President Benjamin Mkapa, who pledged more incentives for investments in the sector. But the opening of the mine also raised fears within environmentalists from Tanzania and Uganda that its closeness to Lake Victoria, 20 kilometres away, could cause further environmental damage to the already affected water system. Unlike the North Mara Gold Mine, where a spill caused extremely high levels of arsenic, cadmium, cobalt, copper, chrome, nickel and zinc at the area around, at Geita the situation was found to be less acute. But at Geita, too, higher than natural levels of arsenic and other metals in sediments were found.

The mine started to experience production difficulties from 2007 onwards, starting with the failure of the highwall in the Nyankanga open pit, continued with some significant breakdowns of major mining equipment and in the process plant. Geita continued to underperform in 2009, producing 272,000 ounces of gold for the year, 43,000 short of the anticipated 315,000 ounces.

In March 2010, a gang of robbers stormed into the mine, tied up a security guard, seized his gun and stole 14 boxes of explosives. The police later managed to arrest one of the gang members and retrieved 12 of the 14 boxes but the incident raised questions in regards to the security at the mine.

At the end of September 2012, Charles Kitwanga, the deputy minister to the vice president’s office singled out the mine for its environmental efforts, citing it as a great example of how mines do not go hand in hand with pollution. As of 2021 it was owned and operated by AngloGold Ashanti.

Production

Production figures of the recent past were:

Year Production Grade Cash Cost
per ounce
2003 661,000 ounces 3.60 g/t US$ 183
2004 570,000 ounces 3.74 g/t US$250
2005 613,000 ounces 3.14 g/t US$298
2006 308,000 ounces 1.68 g/t US$497
2007 327,000 ounces 2.01 g/t US$452
2008 264,000 ounces 1.92 g/t US$728
2009 272,000 ounces 1.89 g/t US$954
2010 357,000 ounces 2.36 g/t US$777
2011 494,000 ounces 3.98 g/t US$536
2012
2013
2014

Local facilities

The 1960s airstrip, as at 2023, is known as Geita-Mchauru and has the ICAO code HTRU. The company maintains a school of around 25 pupils which was founded in 2001, the Geita Gold International School. There is also a golf club adjacent to the mine.

References

  1. ^ Country report: Tanzania Archived 2011-07-07 at the Wayback Machine AngloGold Ashanti website, accessed: 24 July 2010
  2. Sanislav, I. V.; Brayshaw, M.; Kolling, S. L.; Dirks, P. H. G. M.; Cook, Y. A.; Blenkinsop, T. G. (2017). "The structural history and mineralization controls of the world-class Geita Hill gold deposit, Geita Greenstone Belt, Tanzania". Mineralium Deposita. 52 (2): 257–279. doi:10.1007/s00126-016-0660-1. ISSN 0026-4598.
  3. ^ Bryceson et al. 2013, p. 83.
  4. ^ GB Colonial Office 1937, p. 132.
  5. ^ Geita Mine ... Mindat.
  6. ^ Fahy Bryceson, Deborah; Bosse Jønsson, Jesper; Clarke Shand, Mike (2020-05-03). "Mining mobility and settlement during an East African gold boom: Seeking fortune and accommodating fate". Mobilities. 15 (3): 446–463. doi:10.1080/17450101.2020.1723879. ISSN 1745-0101.
  7. Roberts 1986, p. 560.
  8. Roberts 1986, p. 561.
  9. Tanzania Mining History Archived 2010-08-14 at the Wayback Machine tanzaniagold.com, accessed: 24 July 2010
  10. Tanzania: Gold mining adds new problems to Lake Victoria Archived 2010-12-03 at the Wayback Machine World Rainforest Movement website, accessed: 24 July 2010
  11. Dangerous Levels of Arsenic Found Near Tanzania Mine Archived 2010-12-28 at the Wayback Machine MiningWatch Canada website, published: 17 November 2009, accessed: 24 July 2010
  12. Beef up security at Geita Gold Mine The Citizen (Tanzania), published: 23 March 2010, accessed: 24 July 2010
  13. Tanzania: Mine Wins Praise for Keeping Clean Environment, Africa: Allafrica.com, 2012, retrieved 3 October 2012
  14. ^ Annual Report 2005 Archived 2011-07-19 at the Wayback Machine AngloGold Ashanti website, accessed: 11 July 2010
  15. Annual Report 2006 Archived 2011-07-07 at the Wayback Machine AngloGold Ashanti website, accessed: 11 July 2010
  16. ^ Annual Report 2009 Archived September 12, 2011, at the Wayback Machine AngloGold Ashanti website, accessed: 9 May 2010
  17. "AngloGold Ashanti Annual Financial Statements 2010" (PDF). AngloGold Ashanti. 11 March 2011. Archived from the original (PDF) on 2015-04-19. Retrieved 2014-12-02.
  18. "Annual Financial Statements 2011" (PDF). AngloGold Ashanti. 16 March 2012. Archived from the original (PDF) on 2015-04-19. Retrieved 2014-12-02.
  19. "Geita, Mchauru Airport (GIT)". Retrieved 9 September 2023.
  20. "Geita Gold International School". Retrieved 9 September 2023.

Sources

External links

AngloGold Ashanti
Corporate Management
Chairman
CEO
Directors
Mines
Africa
North America
Oceania
South America
Related articles
Gold mines in Tanzania
Active mines
Historic mines
Categories: