Misplaced Pages

Gravesend railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Gravesend station) Railway station in Kent, England

51°26′28.74″N 0°22′0.09″E / 51.4413167°N 0.3666917°E / 51.4413167; 0.3666917

GravesendNational Rail
Overview of footbridge and platforms
General information
LocationGravesend, Borough of Gravesham
England
Grid referenceTQ645740
Managed bySoutheastern
Platforms3
Other information
Station codeGRV
ClassificationDfT category C2
History
Opened30 July 1849
Passengers
2019/20Decrease 2.989 million
 Interchange Decrease 0.155 million
2020/21Decrease 0.882 million
 Interchange Decrease 47,714
2021/22Increase 1.892 million
 Interchange Increase 0.106 million
2022/23Increase 2.256 million
 Interchange Increase 0.444 million
2023/24Increase 2.571 million
 Interchange Decrease 0.258 million
Notes
Passenger statistics from the Office of Rail and Road

Gravesend railway station serves the town of Gravesend in north Kent, England. It is 23 miles 75 chains (38.5 km) down the line from London Charing Cross.

Train services are operated by Southeastern and Thameslink. During Christmas 2013, a major overhaul of the lines and platforms changed the four track, two platform layout into two through lines and a western facing bay platform.

History

Auto-train at Gravesend Railway Station in 1959

The first railway line to arrive in Gravesend was the Gravesend & Rochester Railway (G&RR) who had purchased the Thames and Medway Canal and its tunnel between Strood and Higham. The G&RR ran the first train to the then terminus at Gravesend (adjacent to the Canal Basin) on 10 February 1845. On 30 July 1849 the line was extended to North Kent East Junction on the South Eastern Railway (SER) and thence to London Bridge.

There was a second Gravesend station (later known as Gravesend West Street then later still Gravesend West) opened by SER's rivals, London, Chatham & Dover Railway (LCDR). It was the end of a branch off the LCDR's main line and it allowed access to Victoria. Journey times were uncompetitive and, when the two companies combined in 1899, the branch was soon relegated to a secondary line and closed in 1968. To differentiate from this other station, Gravesend was named Gravesend Central for a long time.

High speed HS1 services to London St Pancras International were introduced in December 2009 and proved highly successful, having cut London-bound journey times to 23 minutes. The station is now seen as a major interchange for metro and high speed services. There is far greater customer patronage for high speed services to St Pancras from Gravesend in comparison to nearby Ebbsfleet International, where usage is considered modest at best. This might be due (in part) to the sizeable London-bound commuter population in and around Gravesham, as opposed to domestic passenger use at Ebbsfleet, from elsewhere in North West Kent. Additionally services between Maidstone West and London St Pancras have since been added to SouthEastern's High Speed route, which stop at Strood and Gravesend prior to joining the high speed lines at Ebbsfleet.

In 2013 a £19 million overhaul of the station, platforms and lines involved the demolition of a former water tank base on the southern platform of the station (Platform 1 at this time), the installation of a new lift/stair bridge complex towards the western end of the station, the removal of the early 20th century footbridge that spanned the lines close to the ticket halls and a major remodelling of the lines and platforms.

The station's track layout was substantially altered in December 2013. This was primarily for extending the current platforms to accommodate 12 coach trains as opposed to the previous 10 coach limit. Platform 1 has been extended and converted to a London facing bay platform and renumbered as Platform 0. A new single face central Platform 1 is located on the site of what was the former up 'through' road. Services from Medway and Faversham, including London bound high speed trains, use this platform. This new platform has bidirectional workings and capability. Platform 2 remained numbered as '2'; however, it lost its turnback capability and thus caters solely for coast bound services. Services terminating at Gravesend from London Charing Cross or London Cannon Street stations terminate on Platform 0.

The previous historic but narrow central footbridge has been replaced with a large sheltered bridge with lifts, at the London end of the station and serving all three platforms. This new bridge is at the far western end of the platforms; the previous bridge was conveniently near the centre of the platforms and near to the entry/exit.

Services

Services at Gravesend are operated by Southeastern and Thameslink using Class 376, 395, 465, 466, 700 and 707 EMUs.

The typical off-peak service in trains per hour is:

Additional services, including trains to and from London Cannon Street, and two daily return services between London St Pancras International and Maidstone West call at the station during the peak hours.

Preceding station National Rail National Rail Following station
Ebbsfleet InternationalSoutheasternHigh Speed 1Strood
NorthfleetSoutheasternNorth Kent LineTerminus
HighamPeak Hours Only
ThameslinkNorth Kent LineHigham
Disused railways
Terminus   British Rail
Southern Region

Hoo Peninsula branch
  Uralite Halt
Northfleet   British Rail
Southern Region

North Kent Line
  Denton Halt
  British Rail Southern Region
North Kent Line
  Milton Range Halt
  British Rail Southern Region
North Kent Line
  Hoo Junction Staff Halt

References

  1. "Gravesend station improvement unlocks capacity improvements in Kent". 6 January 2014. Archived from the original on 16 January 2014. Retrieved 17 January 2014.
  2. Table 194, 200, 201, 212 National Rail timetable, December 2023
  3. "High-speed trains start from Maidstone". Kent Online. Kent Messenger Group. 20 May 2011. Archived from the original on 24 May 2012. Retrieved 23 May 2011.

External links

Railway stations in Kent
London Charing Cross to Gillingham

Other alternative routes from London to Dartford via Sidcup and via Bexleyheath.

London Victoria to Ramsgate
via Chatham
London Victoria to Dover
via Chatham
London Victoria to Ashford
via Maidstone East
London St Pancras to Paris & Brussels
High Speed 1
London Charing Cross to Dover
via Tonbridge
London Charing Cross to Hastings
London Bridge to Uckfield
Ashford to Ramsgate
via Canterbury West
Dover to Margate
Redhill–Tonbridge
Sittingbourne to Sheerness-on-Sea
Ashford to St Leonards
Marshlink
Strood to Paddock Wood
Medway Valley Line
Heritage railways
East Kent Railway
Kent & East Sussex Railway
Romney, Hythe & Dymchurch Railway
Spa Valley Railway
Thameslink, Great Northern, Southern and Southeastern routes
Southeastern routes serving this station
Metro via
Abbey Wood
Metro via Sidcup
High Speed 1
Stations in italics are served on limited occasions, at peak hours or on Sundays only.
Categories: