Guanshanhe Station 官山河站 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Jiangbei District, Ningbo, Zhejiang China | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Ningbo Rail Transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Line 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 (1 island platform) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Guanshanhe Station, formerly known as Cicheng New City Station during construction, is an elevated subway station in Ningbo. The name of this station is because of neighbouring Shazigang (also named as Guanshanhe or Guanshan River), serving as Line 4 in Ningbo Rail Transit. Construction of this station began in 2015.
Style
Guanshanhe Station is located in Cicheng connecting road, near Cishui East Street, Jiangbei District. The station is an elevated 3-story island platform station, with following characteristics: 120m lengths and 19m widths. The platform has widths in a range from 9.22m to 10m. The total construction area is 7702 sq meters.
Exits
It has 3 exits.
References
- "4号线要来了!离开工差最后一步 看车站位置离你家远不远_中国宁波网_民生·城事". news.cnnb.com.cn. Retrieved 2019-02-02.
- "宁波地铁4号线、2号线二期站名命名方案公示_中国宁波网_民生·城事". news.cnnb.com.cn. Retrieved 2019-02-02.
- ^ 甬发改审批〔2015〕445号. 市发展改革委关于宁波市轨道交通4号线工程初步设计的复函. 宁波市发展和改革委员会. 31 August 2015
Ningbo Rail Transit stations | |
---|---|
Line 4 |
|
Lines and stations that are proposed, under planning or under construction are shown in italics. |
Categories: