Guanyinqiao 观音桥 | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Platform of Line 3 | ||||||||||||||||
General information | ||||||||||||||||
Location | Guanyinqiao Subdistrict, Jiangbei District, Chongqing China | |||||||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | |||||||||||||||
Line(s) | Line 3 Line 9 | |||||||||||||||
Platforms | 4 (2 side platforms and 1 island platform) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Other information | ||||||||||||||||
Station code | 3/21, 9/12 | |||||||||||||||
History | ||||||||||||||||
Opened | 29 September 2011 (Line 3) 25 January 2022 (Line 9) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Guanyinqiao is an interchange station on Line 3 and Line 9 of Chongqing Rail Transit in Chongqing Municipality, China. It is located in the Jiangbei District. It opened on 29 September 2011 with the opening of Line 3. On 25 January 2022, it became an interchange station with the opening of Line 9.
Nevertheless, due to the transfer passage is still under construction, all passengers transferring between the two lines at this station must exit the station first.
Station structure
Line 3
B1 Concourse |
Exits 1-5, Customer service, Vending machines, Toilets | |
B2 Platforms |
Side platform | |
Line 3 to Terminal 2 of Jiangbei Airport (Hongqihegou) | ||
Line 3 to Yudong (Huaxinjie) | ||
Side platform |
Line 9
B1 Concourse |
Exits 6-8, Customer service, Vending machines |
B2 Platforms |
Line 9 to Gaotanyan (Mahuangliang) |
Island platform | |
Line 9 to Huashigou (Liyuchi) |
References
- 重庆市轨道交通 Archived 2013-03-15 at the Wayback Machine
- Transportation in Chongqing
This article about a railway station in Chongqing is a stub. You can help Misplaced Pages by expanding it. |