Gulang Road 古浪路 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Island Platform | |||||||||||
General information | |||||||||||
Location | Gulang Road and West Taopu Road, Putuo District, Shanghai China | ||||||||||
Coordinates | 31°17′07″N 121°23′15″E / 31.2854°N 121.38743°E / 31.2854; 121.38743 | ||||||||||
Line(s) | Line 15 | ||||||||||
Platforms | 3 (1 island platform and 1 side platform) | ||||||||||
Tracks | 3 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 23 January 2021 (2021-01-23) | ||||||||||
Services | |||||||||||
| |||||||||||
Gulang Road (Chinese: 古浪路; pinyin: Gǔlàng Lù) is a metro station on the Line 15 of the Shanghai Metro. Located at the intersection of Gulang Road and West Taopu Road in Putuo District, Shanghai, the station was scheduled to open with the rest of Line 15 by the end of 2020. However, the station eventually opened on 23 January 2021 following a one-month postponement. It is located in between Qi'an Road station to the north and East Wuwei Road station to the south. This station has 3 platforms, with the Island Platform heading to Zi-Zhu Hi-Tech Park and the Side Platform heading to Gucun Park.
Station layout
G | Entrances and exits | Exits 1-6 |
B1 | Concourse | Fare gates, station agent |
B2 | Side platform, doors open on the right | |
Northbound | ← Line 15 towards Gucun Park (Qi'an Road) ← Line 15 termination track | |
Island platform, doors open on the left | ||
Southbound | → Line 15 towards Zizhu Hi-tech Park (East Wuwei Road) → |
Gallery
References
- Chen Huizhi (2020-06-19). "Metro Line 15 one step closer to completion". Shine.cn. Retrieved 2020-12-14.
- 1月23日起上海地铁15号线开通初期运营 [Shanghai Metro Line 15 to open on 23 January]. www.shmetro.com (in Chinese). 21 January 2021. Retrieved 21 January 2021.
This Shanghai Metro-related article is a stub. You can help Misplaced Pages by expanding it. |