This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Hambach surface mine" – news · newspapers · books · scholar · JSTOR (March 2022) (Learn how and when to remove this message) |
You can help expand this article with text translated from the corresponding article in German. (June 2017) Click for important translation instructions.
|
Aerial view of Hambach surface mine | |
Location | |
---|---|
Location | Niederzier and Elsdorf, North Rhine-Westphalia |
Country | Germany |
Coordinates | 50°54′39″N 6°30′10″E / 50.91083°N 6.50278°E / 50.91083; 6.50278 |
Production | |
Products | Lignite |
Type | Open-pit |
History | |
Opened | 1978 (1978) |
Owner | |
Company | RWE |
The Tagebau Hambach is a large open-pit coal mine (German: Tagebau) in Niederzier and Elsdorf, North Rhine–Westphalia, Germany. It is operated by RWE and used for mining lignite.
The mine is on the site of the ancient Hambach Forest, which was purchased by RWE in 1978. The company then cut most of the forest down and cleared it to mine. Only 10% of the forest area remains. RWE planned to clear half of the remaining area between 2018 and 2020. This plan was met with massive protests in the autumn of 2018 and was temporarily stopped in October 2018 by the supreme administrative court of North Rhine–Westphalia (Oberverwaltungsgericht für das Land Nordrhein-Westfalen).
Begun in 1978, the mine's operation area currently (as of end of 2017) has a size of 43.8 km, with the total area designated for mining having a size of 85 km. It is the deepest open pit mine with respect to sea level: the bottom of the pit, with up to 500 metres (1,640 ft) from the surface, is 299 metres (981 ft) below sea level, the deepest artificially made point in North Rhine–Westphalia.
Data
This section needs additional citations for verification. Please help improve this article by adding citations to reliable sources in this section. Unsourced material may be challenged and removed. Find sources: "Hambach surface mine" – news · newspapers · books · scholar · JSTOR (March 2022) (Learn how and when to remove this message) |
The open pit operator RWE, then known as Rheinbraun, initiated the permitting process for open-pit mining in 1974 and was able to commence operations in 1978. The first excavator began its work on 15 October 1978. This was accompanied by the resettlement of local villages and towns and the largest forest area in the region, the Hambach Forest, was largely cleared. On 17 January 1984, the first brown coal was mined.
Hambach is the largest open-pit mine in Germany, with an area of 3,389 hectares (as of 2007), with an approved maximum size of 8,500 hectares. About forty million tons of lignite are produced annually in this mine. It has recently been estimated that 1,772 million tons of lignite are still available for mining. The lignite was created from extensive forests and bogs, which developed in the Lower Rhine Bay between thirty and five million years ago. The geology of the Lower Rhine Bay is characterized by long-lasting subsidence movements in the last thirty million years, which led to the deposition of up to 1,300 m-thick sediment layers through the North Sea and many rivers. This today consists of lignite seams up to 100 m thick.
At 299 m below sea level, the deepest point of the Hambach open-pit mine forms the deepest artificial depression in North Rhine-Westphalia.
Since 1995, the giant bucket-wheel excavator Bagger 293 is used to remove the overburden. It holds several Guinness records for terrestrial vehicles.
The open-cast mine annually produces a spoil amount of 250 to 300 million m³. The ratio of overburden to coal is 6.2:1. The extracted lignite is transported via the Hambach industrial spur [de] to Bergheim – Auenheim, and from there via the North–South industrial spur [de] to the power stations Niederaussem, Neurath, Frimmersdorf, and Goldenberg [de], near Hürth-Knapsack. The overburden was, until 16 April 2009, partially transported by conveyor belt to the Bergheim mine, which has run out of coal and therefore been refilled and recultivated. The visible mark of the open pit is the Sophienhöhe spoil tip, which is considered to be the largest human-made hill, towering over the flat landscape by 200 metres.
From 2013, the open-pit area is to be extended southeast. For this, the villages of Morschenich [de] and Manheim [de] must be relocated. The A4 motorway and the Hambach industrial spur, by which the lignite is transported to the power stations, were laid around three kilometres to the south, parallel to the Cologne-Aachen railway line. In addition, a small piece of the federal highway 477 was moved east.
Subsequent use
Lake
The open-pit mine was put into operation in 1978. Every year, about 0.3 cubic kilometres are moved, so that coal and soil with a volume of about 18.6 km will be mined by the time the coal runs out in 2040. By April 2009, the overburden was being transported by conveyor belt to refill the now-exhausted Bergheim mine. Due to the accumulation of about 1 km of material at the Sophienhöhe and the extracted coal, a residual hole was created, which is set to be filled with water after the completion of mining activities.
Pumped-storage plant
In addition to complete flooding, a pumped-storage power plant is also an option on the site. A patent from 1995 states that such a pumped-storage plant in the Hambach open-cast mine can be realized and can provide many times the pumped-storage capacity currently available in Germany. The increased use of renewable energy makes this option more important and is being followed with interest by the mining authority.
Floating solar park
On 6 May 2020, Meyer Burger, a manufacturer of solar cell production machinery, presented its idea for a huge solar park in the Hambach open-cast mine. This would generate electricity with a capacity of around ten gigawatts, which would roughly correspond to the capacity of the Weisweiler, Neurath, Niederaussem, and Frimmersdorf coal-fired power plants, which are currently dependent on the open-cast mines. Considerations for later use of the area of fifty square kilometres include flooding to form a lake landscape. According to Meyer Burger CEO, Gunter Erfurt, it would be conceivable to cover Lake Hambach with solar modules. Up to fifty million solar modules with a capacity of ten gigawatts could be installed as a floating solar park, as has already been realised in other parts of the world.
According to Erfurt, the construction of a state-of-the-art plant for cell and module production is currently being evaluated. In an interview with Radio Rur, Uwe Rau replied that such an idea was feasible, as a major advantage of the Hambach open-cast mine was the power transmission lines already in place due to the power plants, which could thus continue to be used.
RWE Power AG announced in May 2020 that photovoltaic projects for the Sophienhöhe are conceivable.
Andreas Pinkwart, Minister for Economic Affairs, Innovation, Digitisation and Energy of North Rhine-Westphalia, also expressed his support for the project.
Criticism and protests
This section needs additional citations for verification. Please help improve this article by adding citations to reliable sources in this section. Unsourced material may be challenged and removed. Find sources: "Hambach surface mine" – news · newspapers · books · scholar · JSTOR (March 2022) (Learn how and when to remove this message) |
Since around 2012, an area within the remaining part of the Hambach Forest has been occupied by environmentalists to prevent its planned destruction by RWE.
The occupation involves a settlement with around two dozen tree houses and numerous road barricades. The barricades were erected to prevent mining company and police vehicles from entering.
In November 2017, environmentalists entered the mine and temporarily halted operations. They were met with police using horses and pepper spray.
In 2004, Greenpeace activists demonstrated against climate damage in the Hambach mine due to power generation using lignite. They flew over the open pit with a hot air balloon, occupied an excavator for several days, and painted it partly pink. On 13 May 2009, the joint activity of the local action group of citizens' initiatives against the relocation of the A4 and Friends of the Earth Germany (BUND) failed before the Federal Administrative Court. The plaintiffs tried to stop the relocation of the A4, which was deemed necessary for the planned extension of the open-pit mine and justified this, inter alia, with feared noise pollution, as well as the possible threat to the protected Bechstein bat and other species. In 2009, construction of the new section of motorway began. In September 2014, it was opened to traffic.
Since 2008, there have been increasing complaints about possible damage to the hill in the Elsdorf-Heppendorf area. Since the burden of proof lies with the complainants, it is difficult to prove the mining operator guilty. The newly formed brown coal committee therefore decided on 16 April 2010 to set up the Bergschaden Braunkohle NRW reclamation service for damage victims in the Rhenish lignite mining area. The former chairman of the Higher Regional Court Hamm Gero Debusmann was appointed chairman of the recourse office.
In November 2012 and March 2013, the police cleared tent and hut camps of mining opponents in the remaining Hambach Forest. In 2012, a squatter had to be fetched from a six-metre deep tunnel and the following year, two activists were roped off a tree platform. Later, a new camp was built at another location in the Hambach Forest.
In September 2018, a journalist died after falling from the tree structures built by activists.
Panoramic view from Sophienhöhe Hambach open-pit lignite mine in the neighbourhood of the Hambach Forest, showing a bucket-wheel excavator during the demonstrations on 6 October 2018See also
- Ende Gelände 2017
- Ende Gelände 2018
- Garzweiler open pit mine
- Commission on Growth, Structural Change and Employment
- Rheinisches Braunkohlerevier
References
- "Münster: Gericht stoppt vorläufig Rodung im Hambacher Forst". Spiegel Online (in German). 2018-10-05. Retrieved 2018-10-05.
- tagesschau.de (2018-10-05). "OVG Münster stoppt vorerst Rodung im Hambacher Forst". Tagesschau.de (in German). Retrieved 2018-10-05.
- "Gericht verfügt vorläufigen Rodungsstopp". zeit.de (in German). 2018-10-05. Retrieved 2018-10-05.
- RWE. "Hambach mine site". www.group.rwe. Retrieved 2018-10-02.
- ^ "Nordrhein-Westfalen in Zahlen" (PDF) (in German). Bezirksregierung Köln, Abteilung Geobasis NRW. 2013-02-05. Archived from the original (PDF) on 2022-05-09. Retrieved 2016-02-05.
- Jörg Fehres: Die Unternehmensflurbereinigung – Beispiel für ein erfolgreiches Instrument zur Umsetzung von Infrastrukturmaßnahmen. In: zfv Zeitschrift für Geodäsie, Geoinformation und Landmanagement, Heft 4/2010, S. 275–279, Augsburg 2010, ISSN 1618-8950
- Pumpspeicherwerk – Patent DE 19513817 B4, accessed 1 June 2014
- Tagebau Hambach: Saubere Energie aus dem Kohleloch, Kölner Stadtanzeiger, accessed 1 June 2014
- "Meyer Burger factory could equip 10-GW floating solar complex - report". Renewablesnow.com. Retrieved 2020-05-30.
- "Meyer Burger Plans 10 Gigawatts Of Floating Solar For North Rhine-Westphalia". CleanTechnica. 2020-05-04. Retrieved 2020-05-30.
- "Meyer Burger factory could equip 10-GW floating solar complex - report". Renewablesnow.com. Retrieved 2020-05-30.
- Abels, Jörg (2020-05-20). "Tagebau Hambach: Sophienhöhe bleibt unangetastet". Aachener Zeitung (in German). Retrieved 2020-05-30.
- Rur, Radio. "An jüngere Generation denken". Radio Rur (in German). Archived from the original on 2020-08-11. Retrieved 2020-05-30.
- "Special Report from the Occupied Forest: Meet Activists Fighting Europe's Largest Open-Pit Coal Mine". Democracy Now!.
- Braunkohlenausschuss beschließt Einrichtung einer Anrufungsstelle Bergschaden Braunkohle NRW Archived 2 February 2012 at the Wayback Machine, Pressemeldung 036/2010 der Bezirksregierung Köln, 16 April 2010 (PDF; 28 kB), accessed 25 April 2010
- "Hambach Forest: Journalist dies after fall from treehouse bridge". DW News. 2018-09-19. Retrieved 2018-11-06.
External links
- Information on Tagebau Hambach on the RWE website (German) Archived 5 December 2020 at the Wayback Machine
- Tim Traveller about Hambach
RWE | ||||||
---|---|---|---|---|---|---|
Divisions and subsidiaries |
| |||||
Joint ventures and holdings |
| |||||
Places and facilities | ||||||
People | ||||||
Other | ||||||
|