Hardy Dam | |
---|---|
Hardy Dam and Powerhouse | |
Country | United States |
Location | Big Prairie Township, Newaygo County, Michigan |
Purpose | Power |
Status | Operational |
Construction began | 1929 |
Opening date | 1931; 93 years ago (1931) |
Owner(s) | Consumers Energy |
Dam and spillways | |
Type of dam | Embankment, earth-fill |
Impounds | Muskegon River |
Height | 120 ft (37 m) |
Length | 2,600 ft (790 m) |
Width (crest) | 25 ft (7.6 m) |
Width (base) | 1,000 ft (300 m) |
Dam volume | 1,500,000 cu yd (1,100,000 m) |
Reservoir | |
Total capacity | 134,000 acre⋅ft (165,000,000 m) |
Surface area | 4,000 acres (16 km) |
Commission date | 1931 |
Type | Conventional |
Hydraulic head | 99 ft (30 m) |
Turbines | 1 x 11.5 MW, 2 x 10 MW Francis-type |
Installed capacity | 31.5 MW |
Hardy Hydroelectric Plant | |
U.S. National Register of Historic Places | |
Michigan State Historic Site | |
Location within the state of MichiganShow map of MichiganHardy Dam (the United States)Show map of the United States | |
Nearest city | Newaygo, Michigan |
Coordinates | 43°29′18″N 85°37′56″W / 43.48833°N 85.63222°W / 43.48833; -85.63222 |
Built | 1931 |
Architect | Burd, Edward M. |
Architectural style | Spanish Colonial Revival |
NRHP reference No. | 97001479 |
Added to NRHP | Dec. 1, 1997 |
Hardy Dam (or Hardy Hydroelectric Plant) is an earth-filled embankment dam and powerplant complex on the Muskegon River in Big Prairie Township, Newaygo County, Michigan. At the time of its completion, it was the largest earthen dam in North America east of the Mississippi. Its impoundment forms a lake with over 50 miles of shoreline. The dam impounds a reservoir with a surface area of 4,000 acres (1,618 ha) and its power plant has an installed capacity of 31.5 MW.
History
After considerable investigation and planning by Consumers Energy in the 1920s, construction on the Hardy Dam began in 1929. It was designed by William G. Fargo and construction was carried out by his company, Fargo Engineering. Large amounts of concrete were placed into the foundation as solid bedrock was not present, particularly in the streambed. Allied Engineers began constructing the power plant in the autumn of 1929. In August 1930 the Muskegon River was diverted through the power plant penstocks and away from the dam construction site. The embankment of the dam was filled by March 1931 using the semi hydraulic method of construction. About 1,500,000 cu yd (1,100,000 m) of sand and gravel was used in the dam. Both the dam and power plant were complete by the end of 1931.
Construction was carried out under the direction of Edward M. Burd, the head of civil engineering for Commonwealth Power Corporation, a subsidiary of Consumers. The dam and power plant are named for George E. Hardy, a financial partner with Anton Hodenpyl. Hardy and Hodenpyl (who also had a dam named after him) oversaw the Commonwealth & Southern Corporation holding company that Consumers Energy, was part of from 1910 through the 1920s.
A serious flood in September 1986 raised the reservoir 8 ft (2.4 m) above the emergency spillway. Water seeped through joints and underneath the spillway creating voids that were later filled with grout.
Hardy was listed in the National Register of Historic Places on Dec. 1, 1997. The listing notes the Spanish Colonial architecture of the powerplant buildings, including the oil house, intake, dormitory and powerhouse.
In December 2008, the rehabilitation of Unit 3's Francis turbine began. The original 10 MW runner was replaced with one which increased the unit's installed capacity by 1.5 MW. Unit 3 entered back into service on 3 March 2009.
Historical marker text
Constructed from 1929 to 1931, on a site once known as the Oxbow, the Hardy Hydroelectric Plant was built by Consumers Power Company. The plant was named for George Hardy, a partner in the firm that financed Consumers' projects from 1911 through 1928. The complex includes a Spanish Colonial Revival-style powerhouse and intake tower, an oil house, and a dormitory. It originally included four operator's houses on the eastern bank of the pond, which were Sears-Roebuck kit homes. Due to advancements in fossil fuel steam generating plants, this was the last conventional hydroelectric plant built by Consumers. The Hardy plant is listed in the National Register of Historic Places.
Recreation
Approximately 2,000 campsites, several boat launches and a marina are located around the dam. The parks located on the impoundment lake of the Hardy Dam include, Newaygo County's Sandy Beach Park, Newaygo State Park, Mecosta County's Brower Park, and Big Prairie Township's Ox Bow Park and Big Bend Park.
The reservoir offers excellent fishing and a nature trail system regarded as one of the best. The three mile unpaved path parallels the Muskegon River and contains 26 different trees with identification plaques. The trail area is home to wild turkeys, grouse and bald eagles as well as beaver, mink and otter. Fishing includes salmon, steel head, rainbow trout, brown trout, walleye, bass, perch and other pan fish.
The Muskegon dam system
The three dams, Rogers, Hardy, and Croton (all owned and operated by Consumers Energy), are operated in different modes but in concert give a net run of river effect on water flow. The Rogers itself has little or no impoundment and runs in run of river mode, passing through as much water as it receives. The Croton and Hardy work in concert. The Hardy, which has a larger capacity reservoir, larger turbines, and is upstream of the Croton, runs in full peaking mode, meaning that the river flow is impounded and used to generate electricity during peak demand periods. This causes wide fluctuations in water flows and reservoir levels, typically with low outflow during the night when power demand is lowest. Full peaking was once very common but because of the outflow fluctuations, is now less common. However, with the Croton immediately downstream, and with no river segment (the Croton impoundment stretches back to the Hardy outlet), it can be run in re-regulation mode, allowing a natural flow rate to exit. The Croton reservoir level fluctuates inversely with the Hardy, rising during the day and lowering at night. Since the Hardy reservoir is so large, its reservoir level fluctuates about 4 inches (10 cm) in total, while the Croton reservoir fluctuates about 9 inches (23 cm). During the winter and spring runoff, the Hardy is allowed to fluctuate much more. It can be drawn down up to 12 feet (4 m) to meet winter power demand but is required to return to normal levels by the end of April each spring.
Together, the three dams of the Muskegon River (Rogers, Hardy and Croton) can generate about 45,500 kilowatts, with about 30,000 of that from Hardy, which is enough electricity to serve a community of nearly 23,000.
Consumers Energy to discuss the future of its 13 hydropower dams in community talks: https://www.mlive.com/public-interest/2023/09/consumers-energy-to-discuss-the-future-of-its-13-hydropower-dams-in-community-talks.html
See also
- Big Prairie Township, Michigan where the dam is located
- Big Rapids, Michigan the nearest major city
- List of Registered Historic Places in Newaygo County, Michigan
References
- "National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
- ^ "Hardy Hydroelectric Plant, Embankment" (PDF). United States Department of the Interior. 1997. Retrieved 1 January 2015.
- "Croton Hardy Business Alliance". Archived from the original on 2008-07-04. Retrieved 2008-11-28.
- "Hardy Unit No. 3 Turbine Rehabilitation" (PDF). Kleinschmidt Group. Retrieved 1 January 2015.
- text of marker, marker data from "Hardy Hydroelectric Plant page". Michigan Historical Markers site. Archived from the original on November 7, 2006. Retrieved October 3, 2007.
{{cite web}}
: CS1 maint: unfit URL (link) - "Muskegon River Hydroelectric Resources". Consumers Energy website. Archived from the original on September 27, 2007. Retrieved September 2, 2007.
- "Balancing Flows and Power Production along the Muskegon River" (PDF). 2005 Hydro Reporter, pages 9 and 11, found embedded in the Michigan Hydro History PDF. Archived from the original (PDF) on May 8, 2007. Retrieved September 7, 2007.
- "Croton Dam 1907-2007 Centennial Celebration brochure" (PDF). Archived from the original (PDF) on September 27, 2007. Retrieved September 2, 2007.
External links
- Historic American Engineering Record (HAER) documentation, filed under 6928 East Thirty-sixth Street, Newaygo, Newaygo County, MI:
- HAER No. MI-100, "Hardy Hydroelectric Plant", 5 photos, 30 data pages, 1 photo caption page
- HAER No. MI-100-A, "Hardy Hydroelectric Plant, Embankment", 4 photos, 7 data pages, 1 photo caption page
- HAER No. MI-100-B, "Hardy Hydroelectric Plant, Powerhouse", 10 photos, 7 data pages, 2 photo caption pages
- HAER No. MI-100-C, "Hardy Hydroelectric Plant, Substation", 1 photo, 4 data pages, 1 photo caption page
- HAER No. MI-100-D, "Hardy Hydroelectric Plant, Intake Tower", 6 photos, 5 data pages, 1 photo caption page
- HAER No. MI-100-E, "Hardy Hydroelectric Plant, Emergency Spillway", 2 photos, 6 data pages, 1 photo caption page
- HAER No. MI-100-F, "Hardy Hydroelectric Plant, Oil House", 2 photos, 4 data pages, 1 photo caption page
- HAER No. MI-100-G, "Hardy Hydroelectric Plant, Dormitory", 3 photos, 4 data pages, 1 photo caption page
- Newaygo County Department of Parks and Recreation Archived 2018-07-14 at the Wayback Machine
- Mecosta County Parks Commission
- Newaygo State Park
- Big Prairie Township Parks
- River Country Chamber of Commerce of Newaygo County
- Consumers Energy Archived 2008-11-21 at the Wayback Machine
- Buildings and structures in Newaygo County, Michigan
- Historic American Engineering Record in Michigan
- Hydroelectric power plants in Michigan
- Michigan State Historic Sites
- Energy infrastructure completed in 1931
- Dams in Michigan
- Consumers Energy dams
- Dams on the National Register of Historic Places in Michigan
- Earth-filled dams
- 1931 establishments in Michigan
- Dams completed in 1931
- National Register of Historic Places in Newaygo County, Michigan