Metro line of Chongqing Rail Transit
Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017. Rapid trains started operating on Line 10 in June 2020.
The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.
Interior of a Line 10 trainLuggage rackOpening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wangjiazhuang – Liyuchi | 28 December 2017 | 33.7 km (20.94 mi) | 18 | Phase 1 |
Chongqing North Station South Square | 28 December 2018 | infill station | 1 | |
Liyuchi – Houbao | 18 January 2023 | 6 km (3.7 mi) | 4 | Phase 2 (initial section) |
Houbao – Lanhualu | 30 November 2023 | 4.75 km (2.95 mi) | 4 | Phase 2 (remain section) |
Stations (north to south)
Service routes |
Station № |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|---|
R | L | English | Chinese | |||||
● | ● | Wangjiazhuang | 王家庄 | Line 6 | - | 0 | Yubei | |
| | ● | Yuelai | 悦来 | Line 6 | 2.04 | 2.04 | ||
● | ● | Central Park West | 中央公园西 | Line 5 | 2.71 | 4.75 | ||
| | ● | Central Park | 中央公园 | 1.09 | 5.84 | |||
| | ● | Central Park East | 中央公园东 | Line 9 | 0.82 | 6.66 | ||
| | ● | Lushan | 鹿山 | 1.64 | 8.30 | |||
| | ● | Yubei Square | 渝北广场 | 2.05 | 10.35 | |||
● | ● | Terminal 2 of Jiangbei Airport | 江北机场T2航站楼 | Line 3 CKG | 0.74 | 11.09 | ||
● | ● | Terminal 3 of Jiangbei Airport | 江北机场T3航站楼 | 15 CKG | 2.22 | 13.31 | ||
| | ● | Changhe | 长河 | 5.31 | 18.62 | |||
| | ● | Huanshan Park | 环山公园 | 1.85 | 20.47 | |||
● | ● | Shangwanlu | 上湾路 | Line 9 | 1.67 | 22.14 | ||
| | ● | Sanyawan | 三亚湾 | 2.74 | 24.88 | |||
| | ● | Minxinjiayuan | 民心佳园 | 2.08 | 26.96 | |||
● | ● | Chongqing North Station North Square | 重庆北站北广场 | Line 4 YW CUW |
2.61 | 29.57 | ||
● | ● | Chongqing N. Station S. Square | 重庆北站南广场 | Line 3 Loop line YW CUW |
0.60 | 30.17 | ||
| | ● | Longtousi Park | 龙头寺公园 | 0.87 | 31.04 | |||
● | ● | Hongtudi | 红土地 | Line 6 | 1.63 | 32.67 | Jiangbei | |
● | ● | Liyuchi | 鲤鱼池 | Line 9 | 1.09 | 33.76 | ||
● | ● | Zengjiayan | 曾家岩 | Line 2 | 0.82 | 34.58 | Yuzhong | |
| | ● | Chongqing People's Auditorium | 大礼堂 | 0.92 | 35.5 | |||
● | ● | Qixinggang | 七星岗 | Line 1 18 | 0.89 | 36.39 | ||
| | ● | Houbao | 后堡 | 2.12 | 38.51 | Nan'an | ||
| | | | Nanping | 南坪 | Line 3 27 | 1.22 | 39.73 | ||
● | ● | Wanshoulu | 万寿路 | 0.98 | 40.71 | |||
| | ● | Nanhu | 南湖 | Loop line | 1.27 | 41.98 | ||
● | ● | Lanhualu | 兰花路 | 1.28 | 43.26 | |||
Notes
- ^ The former translation is North/South Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station
References
- "重庆市主城形成多层次立体交通体系". May 16, 2017.
- "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
- Jiang, Yan; Hu, Jie (December 18, 2017). 轨道也将有"超车道"! 五号线十号线将分"快慢车"-上游新闻 汇聚向上的力量. Chongqing Morning Paper (in Chinese (China)). Retrieved February 24, 2018.
- ^ "重庆轨道交通10号线二期通过竣工验收". January 9, 2023.
重庆轨道交通10号线二期(鲤鱼池至后堡)呈南北走向,线路全长6公里
- "重庆轨道5号线、10号线剩余路段30日开通初期运营". www.cqcb.com. November 29, 2023. Retrieved November 29, 2023.
- "重庆轨道交通线网图". Archived from the original on June 9, 2022.
Public transportation in Chongqing Metropolitan Area (CQ) | |||||
---|---|---|---|---|---|
Chongqing Rail Transit |
| ||||
Trams in Chongqing |
| ||||
CR C-train (intercity rail) |
| ||||
CR G-train (high-speed rail) |
| ||||
Transportation hubs |
| ||||