The Huangtai–Jinan East link line (Chinese: 黄东联络线) is a railway line in Jinan, Shandong, China. It is 10.5 km in length.
History
Construction began in March 2020. The line opened on 16 November 2022.
Route
The eastern terminus of the line is Jinan East railway station. It heads south and joins the Qingdao–Jinan railway east of Huangtai railway station. The line allows train services to call at both Jinan railway station and Jinan East. It has a maximum speed of 120 kilometres per hour (75 mph).
References
- "开通了!这条铁路全长10.5公里 还设无人"车站"". 2022-12-21.
- "黄东联络线联调联试 济南三大高铁站即将"牵手"". Xinhua News. 2022-08-12. Retrieved 2022-08-30.
- ""打高铁"跨城!黄东联络线通车运营,济南三大站"牵手"". sd.ifeng.com. Retrieved 2022-11-17.
- "济南黄东联络线主体建设基本完成,济南站与济南东站直通倒计时" (in Simplified Chinese). 2022-07-23. Retrieved 2022-08-30.
- "开通在即!黄东联络线开启联调联试". 中国山东网. 2022-08-12. Retrieved 2022-08-30.