IRR Southern Line
Legend
Baghdad To Basra
km approx. time
0 Baghdad International Railway Station 0:00
IRR Northern and Western
9.1 Baghdad Mansur Railway Station
11.9 Hamra Railway Station
17.2 Dora Railway Station
31.0 Yusufiya Railway Station
Over Grand Channel
41.2 Mahmudiya Railway Station
46.8 Latifiya Railway Station
61.4 Iskanderiya/Alexandria Railway Station 01:00
73.0 Musaiyeb Railway Station
Over Euphrates
97.6 Karbala Railway Station 01:40
90.6 Mahawil Railway Station
109.7 Hilla/Babylon Railway Station 01:45
Over Euphrates
134.1 Hashimiya Railway Station 02:00
148.9 Qojan Railway Station
Over Euphrates
167.3 Sharifiya Railway Station
170.9 Seniya Railway Station
Over Euphrates
185.5 Diwaniya Railway Station 03:00
203.9 Bani Median Railway Station
215.0 Hamza Railway Station
230.9 Rumeitha Railway Station
237.0 Abu Tubeikh Railway Station
249.9 Hijama Railway Station 04:00
267.0 Sawa Railway Station
Over Euphrates
275.3 Samawa Railway Station 04:15
299.5 Khafora Railway Station
313.8 Khuder Railway Station
328.7 Daraji Railway Station 05:00
346.4 Batha Railway Station
364.4 Quziya Railway Station
381.3 Nasiriya Railway Station 05:50
Over Grand Channel
396.3 Khandaq Railway Station 06:00
408.6 Suq Ash Shuyukh Railway Station
420.0 Karmashiya Railway Station
Hamar Marsh
433.7 Showeiya Railway Station
440.0 Howeysa Railway Station
448.8 Luqeyt Railway Station 07:00
Over Grand Channel
461.7 Ghabashiya Railway Station
477.3 Jazair Railway Station
482.0 Sidra Railway Station
487.5 Artawa Rail Station
504.7 Romayla Railway Station
521.5 Tuba Railway Station 08:00
Shoeyba Junction
To Um Qasr
536.9 Shoeyba Railway Station
Over Basra Canal
552.9 Basra Maqal Railway Station 08:30
Over Shatt Al Arab
Line to Shalamcheh Under Construction

The IRR Southern Line, also known as the Baghdad–Basra Railway Line (Route Number 2), is a railway line between the Iraqi capital of Baghdad and the port city of Basra in Iraq. The line is roughly 550 kilometres (340 mi) long, with intermediate stops including Karbala, Musayyib, Diwaniya, Samawah, Nasiriya and Um Qasr. A proposal was put forward to convert the railway route to high-speed rail and connect the city of Najaf, but the plan was never realised. Next to the commuter train to Falluja, it is one of the two only routes in Iraq that service passengers.

Technical Specifications

The line was planned to be high-speed, allowing a top speed of 250 km/h (155 mph), but currently operates at an average speed of 65 km/h (40 mph) and a top speed of 125 km/h (78 mph).

The Railway has a total trackage of 609 kilometres (378 mi) with 39 stations along the main route, one along the Karbala Branch and 4 along the 56 kilometres (35 mi) Um Qasr Branch. The rails have a UIC 60 profile with welded joints along the main branch designed for high-speed and heavy freight services. The axle load is 25 tons. Along the Um Qasr Branch the joints are coupled.

Along the line, two heavy maintenance factories have been built, one in Baghdad and the other in Samawa, right in the middle between Baghdad and Basra. There are also two light maintenance workshops, one in Baghdad and the other in Basra.

The line had a semiautomatic block relay signalling system installed in 1975, as well as sound cables running along the tracks providing communication between the stations and locomotives.

History

Metre gauge

The first metre-gauge railway connection between the two cities was built during the First World War in the Mesopotamian Campaign. Subsequently, under British administration the ‘Mesopotamian Railways’ (MR), later ‘Iraqi State Railways’ (ISR) and after 1958 until today the ‘Iraqi Republic Railways’ (IRR), operated the rail. Installations built by the military during the war were also included in the construction. The last gap for a through connection between Baghdad and Basra was closed in 1924. This track remained in use until 1968 when it was abandoned in favour of the new standard-gauge line.

Standard gauge

In the 1960s, the IRR built a standard-gauge track between Baghdad and Basra. It was initially opened on March 10th, 1964, for freight traffic only. Passenger services began on April 25th, 1968 and the metre-gauge railway was closed to traffic shortly thereafter.

During the Gulf War, the railway line was so severely damaged that train services were suspended - presumably shortly after American intervention. After the end of the war, repairs were carried out and trains were running again starting on May 22nd, 1991.

The unstable political and economic situation in Iraq resulted in the reliability of the service being so poor that timetables did not indicate an arrival time beforehand over the last few decades. A journey time of over a day for the entire route was not unusual.

Samawa Railway Station prior to the Gulf War

High Speed Train

The construction of a high-speed line was discussed in 2011, but not pursued further. In 2023, it was discussed again. The line was first announced by Thierry Mariani, a French junior transport minister, at the 2011 Paris Air Show on 24 June 2011. He said that French company Alstom and the Iraqi government had signed a memorandum of understanding (MOU) regarding a contract to build the proposed line and that Alstom would conduct exclusive talks with the Iraqi government for a year.

Service and Recent Progress

There is one train service per day, taking 8–12 hours, in each direction. The Baghdad to Basra train starts at Baghdad Central Station at 8 pm and arrives at Basra Al Maqal Railway Station at 4:30 am. In reverse, the Basra to Baghdad train starts at 7 pm and arrives in Baghdad at 6:15 am.

There are four categories of tickets on the line. A two-berth sleeper accommodation costs 37,000 IQD (28 USD) and a four-berth sleeper ticket costs 31,000 IQD (24 USD). Second-class seating tickets each cost 10,000 IQD (8 USD) and first-class options cost 15,000 IQD (11 USD).

Tea, kebabs or other snacks can be purchased in the dining car.

In 2014, IRR received the first of an order of 10 new trains from CRRC Qingdao Sifang. The trainsets consist of two diesel-powered locomotives and eight steel-bodied trailers and are specifically built to resist the high temperatures and wind-blown dust of Iraq's desert environment.

Also, there are currently renovation efforts, such as to fully double track the railway, construct new bridges, embankments and culverts and all of the engineering was done in-house by the IRR.

Trivia

In an incident in 1917, local tribesmen stole a temporary halt for firewood use, which was later humourously picked up by magazines, as the material of the station "was too valuable to be left unattended in the cold Mesopotamian winter evenings". Later, the halt was abandoned.

Also a common occurrence on the railway is boys throwing stones at the train, often damaging windows in the 'game'.

References

  1. ^ "Iraq: France's Alstom signs high-speed rail line deal". BBC News Online. 24 June 2011. Archived from the original on 27 June 2011. Retrieved 27 June 2011.
  2. ^ "Alstom tapped for Iraq HSR talks". Railway Age. 24 June 2011. Archived from the original on 28 June 2011. Retrieved 27 June 2011.
  3. "High-speed Baghdad-Basra rail line complete | Embassy of the Republic of Iraq Public Relations Office".
  4. Arango, Tim (18 October 2014). "A Train Ride Through Time: From Iraq's Checkered Past into an Uncertain Future". The New York Times.
  5. "Focus - Approaching terminus? On board Iraq's last train line". 8 December 2014.
  6. ^ Alwan, SR ENGR Safa; Hanoon, SR ENGR Isra (October 2018). "Irak". Proceedings of the 12th Meeting of the COMCEC Transport and Communications Working Group. COMCEC: 34.
  7. ^ Robinson, Neil (August 2006). World Rail Atlas. World Rail Atlas Ltd. pp. 25 f. ISBN 978-954-12-0128-2.
  8. Robinson, Neil (August 2006). World Rail Atlas. World Rail Atlas Ltd. p. 27. ISBN 978-954-12-0128-2.
  9. Robinson, Neil (August 2006). World Rail Atlas. World Rail Atlas Ltd. p. 24. ISBN 978-954-12-0128-2.
  10. ^ "Train travel in Iraq | Baghdad to Basra train".
  11. "Taking the train in Iraq: Basra to Baghdad". 16 March 2019.
  12. Barry, Keith (24 March 2014). "After Decades of War, Iraq Adds Fleet of New Trains to Its Aging Railway". Wired. Retrieved 23 September 2020.
  13. "New Iraqi inter-city train rolled out".
  14. Coke, Richard (April 1928). "The Railways of Mesopotamia" (PDF). The Railway Magazine. pp. 257(3).
  15. "Re-opened Iraqi railway a sign of progress". France24. 10 September 2018. Retrieved 19 December 2024.
High-speed rail
Part of rail transport
Technologies
High-speed trains
350 km/h
(217 mph)
or more
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
Experimental and prototype high-speed trains (category)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania
Categories: