The topic of this article may not meet Misplaced Pages's general notability guideline. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted. Find sources: "Business routes of Interstate 25" – news · newspapers · books · scholar · JSTOR (April 2024) (Learn how and when to remove this message) |
This article relies excessively on references to primary sources. Please improve this article by adding secondary or tertiary sources. Find sources: "Business routes of Interstate 25" – news · newspapers · books · scholar · JSTOR (April 2024) (Learn how and when to remove this message) |
Interstate 25 Business | |
---|---|
Location | |
Country | United States |
Highway system | |
Interstate business routes are roads connecting a central or commercial district of a city or town with an Interstate bypass. These roads typically follow along local streets often along a former US or state highway that had been replaced by an Interstate. Interstate business route reassurance markers are signed as either loops or spurs using a green shield shaped sign and numbered like the shield of the parent Interstate Highway.
Along Interstate 25 (I-25), business routes are found in all three states through which I-25 passes: New Mexico, Colorado, and Wyoming. Some states regard Interstate business routes as fully integrated within their state highway system while other states consider them to be either local roads to be maintained by county or municipal authorities or a hybrid of state and local control. Every state along I-25 regards its business routes as fully incorporated members of their respective state maintained highway systems.
Although the public may differentiate between different business routes by the number of the parent route and the location of the route, there is no uniform naming convention. Each state highway department internally uses its own designations to identify segments within its jurisdiction.
New Mexico
All the business loops within New Mexico are maintained by the New Mexico Department of Transportation (NMDOT). In New Mexico, Interstate business routes are named independently of their parent Interstate's designation with business loops of I-25 numbered between 10–19, those of I-10 between 20–29, and those of I-40 between 30–39. New Mexico business loop numbers ascend eastward and northward with gaps in numbering to allow for future designations. I-25 begins with a business route through Williamsburg and Truth or Consequences before proceeding northward with additional routes serving the towns of Socorro, Belen, Las Vegas, Springer, and Raton. These routes largely conform to the current or former alignment of the unsigned US Highway 85 (US 85) through these communities before the construction of I-25. NMDOT has decommissioned US 85 throughout the state and no longer signs the highway along its length, as US 85 entirely follows I-25 with the single exception of the business loop in Las Vegas. The American Association of State Highway and Transportation Officials (AASHTO), however, continues to recognize the New Mexico portion of US 85 maintaining continuity with sections in adjacent states.
Williamsburg–Truth or Consequences
Interstate 25 Business | |
---|---|
Business Loop 11 | |
Location | Williamsburg–Truth or Consequences |
Length | 5.711 mi (9.191 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 11 (BL 11), is a 5.711-mile (9.191 km) business loop serving the cities of Williamsburg and Truth or Consequences in Sierra County. The loop begins at exit 75 of I-25 in Williamsburg, intersecting State Road 187 (NM 187), traveling northeast on Broadway Street through Truth or Consequences until meeting Main Avenue. Between that point and Date Street, the route follows two one-way roads with Broadway carrying northbound traffic and Main conveying traffic to the south. The routes combine and turn north on Date Street, intersecting the western terminus of NM 51. Turning northwest, the highway intersects NM 181 and terminates at exit 79 on I-25 on the north side of Truth or Consequences.
Most of the loop, with the exception of its I-25 interchanges, was previously part of US 85, which joined the route from the south at NM 187 and departed to the north along NM 181.
Major intersections
The entire route is in Sierra County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Williamsburg | 0.000 | 0.000 | I-25 / US 85 – Las Cruces, Albuquerque | Southern terminus | |
0.415 | 0.668 | NM 187 south | Northern terminus of NM 187 | ||
Truth or Consequences | 3.592 | 5.781 | NM 51 east (Third Avenue) – Elephant Butte, Engle | Western terminus of NM 51 | |
4.848 | 7.802 | NM 181 north – Elephant Butte State Park | Southern terminus of NM 181 | ||
5.711 | 9.191 | I-25 / US 85 – Las Cruces, Albuquerque | Northern terminus | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Socorro
Interstate 25 Business | |
---|---|
Business Loop 12 | |
Location | Socorro |
Length | 2.879 mi (4.633 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 12 (BL 12), is a 2.879-mile (4.633 km) business loop serving the city of Socorro in Socorro County. The loop begins at exit 147 of I-25 and travels northwest along California Avenue until an intersection with the northern terminus of NM 1. The loop turns north as a divided highway as it enters the city. US 60 intersects from the west, and the loop becomes concurrent with US 60 as the pair of highways continue to the north. The loop terminates at exit 150 on I-25, and US 60 continues along the Interstate as it exits Socorro.
Major intersections
The entire route is in Socorro County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Socorro | 0.000 | 0.000 | I-25 / US 85 – Las Cruces, Albuquerque | Southern terminus | |
| 0.366 | 0.589 | NM 1 south | Northern terminus of NM 1 | |
| 1.055 | 1.698 | US 60 west (Spring Street) – VLA | Southern end of US 60 concurrency | |
| 2.879 | 4.633 | I-25 / US 60 east / US 85 – Las Cruces, Albuquerque | Northern terminus; northern end of US 60 concurrency | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Belen
Interstate 25 Business | |
---|---|
Business Loop 13 | |
Location | Belen |
Length | 6.645 mi (10.694 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 13 (BL 13), is a 6.645-mile (10.694 km) business loop serving the city of Belen in Valencia County. The loop begins at exit 190 on I-25 and intersects the northern terminus of NM 116 as the highway travels north along Main Street into the city. The western terminus of NM 309 is met in central Belen. The loop continues north to NM 314 then turns northwest before terminating at exit 195 on I-25.
Major intersections
The entire route is in Valencia County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Belen | 0.000 | 0.000 | I-25 / US 85 – Socorro, Albuquerque | Southern terminus | |
| 0.700 | 1.127 | NM 116 south | Northern terminus of NM 116 | |
| 2.310 | 3.718 | NM 309 east (Reinken Avenue) | Western terminus of NM 309 | |
| 4.605 | 7.411 | NM 314 north – Los Lunas | Southern terminus of NM 314 | |
| 6.645 | 10.694 | I-25 / US 85 – Socorro, Albuquerque | Northern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Santa Fe
Interstate 25 Business | |
---|---|
Business Loop 14 | |
Location | Santa Fe |
Length | 9.370 mi (15.080 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 14 (BL 14), was a 9.37-mile (15.08 km) business loop that served Santa Fe in Santa Fe County. The loop began at exit 278 on I-25 and traveled northeast along NM 14 (Cerrillos Road). It then went east on NM 466 (Saint Michaels Drive), cutting through the south side of Santa Fe. The road ended up as Old Pecos Trail and remained so until reaching I-25 again and terminating at exit 284. The route was decommissioned.
Major intersections
The entire route is in Santa Fe County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.000 | 0.000 | I-25 / US 85 / NM 14 (Cerrillos Road) | Western terminus; begins concurrency with NM 14 | |
Agua Fria | 2.704 | 4.352 | NM 300 (Rodeo Road) / NM 284 (Airport Road) | Western terminus of NM 300; eastern terminus of NM 284 | |
Santa Fe | 5.580 | 8.980 | NM 14 (Cerrillos Road) / NM 466 (St Michaels Drive) | Ends concurrency with NM 14; begins concurrency with NM 466 | |
| 6.790 | 10.927 | US 84 / US 285 (St Francis Drive) | Interchanges US 84 and US 285 | |
| 9.093 | 14.634 | NM 466 (Old Pecos Trail) / NM 300 (Old Las Vegas Hwy.) | Intersects NM 300 | |
| 9.370 | 15.080 | I-25 / US 84 / US 85 / US 285 (Old Pecos Trail) / NM 466 | Eastern terminus; ends concurrency with NM 466; NM 466 continues south | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Las Vegas
Interstate 25 Business | |
---|---|
Business Loop 15 | |
Location | Las Vegas |
Length | 4.240 mi (6.824 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 15 (BL 15), is a 4.24-mile (6.82 km) business loop serving Las Vegas in San Miguel County. It also carries unsigned US 85. The loop begins at exit 343 of I-25 and travels northeast, intersecting NM 329. The loop continues north, passing to the west of Las Vegas station served by the Southwest Chief line of Amtrak, just south of the intersection with NM 104. Continuing north, the highway passes east of Municipal Park before terminating at NM 250 and I-25 at exit 347.
Major intersections
The entire route is in Las Vegas, San Miguel County.
mi | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | I-25 / Santa Fe Trail Scenic Byway to US 84 south – Santa Fe, Raton | Southern terminus; road continues as Grand Avenue | ||
0.341 | 0.549 | NM 329 north (New Mexico Avenue) | Southern terminus of NM 329 | ||
7th Street / Jackson Street / Santa Fe Trail Scenic Byway to NM 518 | |||||
2.117 | 3.407 | NM 104 east (University Avenue) – Conchas Lake, Tucumcari | Western terminus of NM 104 | ||
Mills Avenue to NM 518 / NM 65 – Luna Community College | Former NM 329 | ||||
4.240 | 6.824 | I-25 / NM 250 north – Santa Fe, Springer, Raton | Northern terminus; road continues as NM 250; serves Las Vegas Municipal Airport | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Springer
Interstate 25 Business | |
---|---|
Business Loop 16 | |
Location | Springer |
Length | 3.430 mi (5.520 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 16 (BL 16), is an unsigned 3.43-mile (5.52 km) business loop serving the city of Springer in Colfax County. The loop begins at exit 412 of I-25 and travels northeast along Railroad Avenue. The loop serves as the main north–south road in the town and intersects Fourth Street, which, to the west of the loop, is NM 21 and, to the east, is US 56 and US 412. Continuing northwest, the loop intersects NM 468 and then runs closely parallel to the Interstate before merging at exit 414.
Major intersections
The entire route is in Colfax County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.000 | 0.000 | I-25 (US 85) – Las Vegas, Raton | Southern terminus; I-25 exit 412 | |
Springer | 1.258 | 2.025 | US 56 / US 412 east (Fourth Street east) / NM 21 west (Fourth Street west) – Miami, Clayton | Western termini of US 56 and US 412; eastern terminus of NM 21 | |
1.827 | 2.940 | NM 468 west – Springer Correctional Facility, Lake Springer | Eastern terminus of NM 468 | ||
| 3.430 | 5.520 | I-25 (US 85) – Raton | Northern terminus; I-25 exit 414 | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Raton
Interstate 25 Business | |
---|---|
Business Loop 17 | |
Location | Raton |
Length | 4.161 mi (6.696 km) |
Interstate 25 Business (I-25 Bus.), inventoried as Business Loop 17 (BL 17), is a 4.161-mile (6.696 km) business loop that begins at exit 450 on I-25 south of Raton in Colfax County concurrent with US 64. The two highways intersect NM 555 then pass east of La Mesa Park, traveling along Second Street north into the city. Clayton Road takes US 64 off of the loop to the east as the loop continues north, crossing over the rail line that serves Raton station before turning northwest and terminating at exit 454 on I-25.
Major intersections
The entire route is in Colfax County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Raton | 0.000 | 0.000 | I-25 / US 64 west / US 85 – Springer, Trinidad, CO | Southern terminus; begin overlay of US 64 | |
0.440 | 0.708 | NM 555 west (York Canyon Road) | Eastern terminus of NM 555 | ||
1.627 | 2.618 | US 64 east (Clayton Road) – Clayton, Amarillo, TX | End overlay of US 64 | ||
| 4.161 | 6.696 | I-25 / US 85 / US 87 – Springer, Trinidad, CO | Northern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Colorado
All Interstate business routes in Colorado are maintained by the Colorado Department of Transportation (CDOT). Within Colorado, all highways maintained by the state are classified as state highways, including Interstates and US Highways which hold the same numerical designations as their nationally established routes. The numerical values of all state highway names are followed by an alphabetic suffix, although this convention is used by the department internally and not reflected in route signage. Hence, the mainline of I-25 throughout the length of the state is classified as State Highway 25A (SH 25A) while its two business routes in Aguilar and Walsenburg are internally named SH 25B and SH 25C, respectively. US 85 and US 87 are hidden routes not recognized nor signed by CDOT in southern Colorado. They are, however, established AASHTO routes maintaining continuity with signed portions in other states along their routes. In southern Colorado, the routes primarily follow I-25, including at Aguilar, but with deviations, such as along the Walsenburg business route. In addition to these, US 160 joins I-25 at Walsenburg and follows concurrently with the Interstate to Trinidad, including the portion bypassing Aguilar. Thus, in Walsenburg, US 160 crosses the business route in the town center and again at the business route's southern terminus.
Trinidad
Interstate 25 Business | |
---|---|
State Highway 25A | |
Location | Trinidad |
Length | 0.5 mi (800 m) |
Interstate 25 Business (I-25 Bus.), inventoried as State Highway 25A (SH 25A), was a business route of I-25 that connected Trinidad in Las Animas County to the Interstate. The 0.5-mile (0.80 km) route began as Animas Street, coming from University Street at a diamond interchange at exit 13 on I-25. The route was concurrent with US 160 along Main Street. The route turned southwest on Main Street and terminated at I-25. In 2009, a reconstruction project involved a replacement of the northbound viaduct crossing the Purgatoire River and more reconstruction in 2011, adding a new diamond interchange at Main Street and I-25 and replacing the antiquated ramps at Animas and University streets, which ultimately eliminated the route.
Major intersections
The entire route is in Las Animas County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Trinidad | 0.000 | 0.000 | I-25 / US 85 / US 87 / US 160 – Trinidad, Pueblo | Northern terminus; roadway continues as University Street | |
| 0.049 | 0.079 | US 160 north (Animas Street) – Trinidad | Begin overlay of US 160 | |
| 0.2 | 0.32 | US 160 south (Main Street) – Trinidad | End overlay of US 160 | |
| 0.5 | 0.80 | I-25 / US 85 / US 87 / US 160 – Trinidad, Pueblo | Southern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Aguilar
Interstate 25 Business | |
---|---|
State Highway 25B | |
Location | Aguilar |
Length | 1.981 mi (3.188 km) |
Interstate 25 Business (I-25 Bus.), inventoried as State Highway 25B (SH 25B), is a business spur of I-25 connecting the town of Aguilar in Las Animas County to the Interstate. The 1.981-mile (3.188 km) route begins at the corner of Main and Fir streets in Aguilar. The spur proceeds for one block north along North Fir Street before turning to the northwest along Lynn Road away from town. The route turns east along County Road 60 (CR 60) immediately before terminating at I-25 exit 34.
Major intersections
The entire route is in Las Animas County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Aguilar | 0.000 | 0.000 | Main Street / S. Fir Street | Western terminus; roadway continues south as S. Fir Street | |
| 1.981 | 3.188 | I-25 / US 85 / US 87 / US 160 – Trinidad, Pueblo | Eastern terminus; roadway continues east as County Road 60 | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Walsenburg
Interstate 25 Business | |
---|---|
State Highway 25C | |
Location | Walsenburg |
Length | 4.356 mi (7.010 km) |
Interstate 25 Business (I-25 Bus.), inventoried as State Highway 25C (SH 25C), is a business loop of I-25 serving the town of Walsenburg in Huerfano County. The 4.356-mile (7.010 km) route begins at I-25 exit 49 and proceeds to the west along the southern edge of Walsenburg. The route then turns to the northwest along Walsen Avenue. At Seventh Street, US 160 intersects from the west US 160 runs concurrently with the loop until US 160 turns off to the east along Fifth Street to I-25. The loop then continues northeast along Walsen Avenue, leaving town, and intersects SH 69 before terminating at I-25 exit 52.
CDOT does not recognize or sign US 85 in the southernmost part of its route within the state, nor does it recognize US 87 anywhere within Colorado, as they are redundant with other routes in the state highway system. The highways remain established by AASHTO primarily along I-25 in southern Colorado and along Walsenburg's I-25 business route.
Major intersections
The entire route is in Huerfano County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Walsenburg | 0.000 | 0.000 | I-25 / US 85 south / US 87 south / US 160 – Trinidad, Pueblo | Southern terminus; begin overlay of US 85 / US 87 | |
1.397 | 2.248 | US 160 west (Seventh Street) – Alamosa | Begin overlay of US 160 | ||
1.542 | 2.482 | US 160 east (Fifth Street) | End overlay of US 160 | ||
| 3.669 | 5.905 | SH 69 west – Westcliffe | Eastern terminus of SH 69 | |
| 4.356 | 7.010 | I-25 / US 85 north / US 87 north – Trinidad, Pueblo | Northern terminus; end overlay of US 85 / US 87 | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Colorado Springs
Interstate 25 Business | |
---|---|
State Highway 25 Business | |
Location | Colorado Springs, Colorado |
Length | 6.750 mi (10.863 km) |
Existed | 2007 |
Interstate 25 Business (I-25 Bus.), inventoried as State Highway 25 Business (SH 25 Bus.), was a business loop of I-25 that served downtown Colorado Springs and Northeast Colorado Springs. The route started at exit 140 on I-25 and ran along with Nevada Avenue. This route was also part of the CanAm Highway. It was a four-lane divided street that took a straight shot through downtown going north. The route terminated at exit 148 at I-25. In 2007, actions were taken to decommission the route, along with SH 38 and portions of SH 83, in an effort to add the alignment of SH 21 (Powers Boulevard).
Major intersections
The entire route is in El Paso County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Colorado Springs | 0.000 | 0.000 | I-25 / US 24 / US 85 / US 87 | Southern terminus | |
| 6.750 | 10.863 | I-25 / US 85 / US 87 | Northern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Castle Rock
Interstate 25 Business | |
---|---|
State Highway 25 Business | |
Location | Castle Rock |
Length | 1.200 mi (1.931 km) |
Existed | 1996 |
Interstate 25 Business (I-25 Bus.), inventoried as State Highway 25 Business (SH 25 Bus.), was a business loop that served the westside of Castle Rock. The route began at exit 181 as Plum Creek Pkwy and headed northwest. It then turned northeast on CR 46 (Wolfensburger Road), heading back to the Interstate, and then terminated at exit 182 as Wilcox Street. The route was decommissioned in 1996 and was likely unsigned.
Major intersections
The entire route is in Douglas County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Castle Rock | 0.000 | 0.000 | I-25 / US 85 / US 87 | Southern terminus | |
| 1.200 | 1.931 | I-25 / US 85 / US 87 | Northern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Wyoming
All business routes of I-25 within Wyoming are maintained by the Wyoming Department of Transportation (WYDOT). Wyoming has no naming convention for disambiguation between different business routes with all designated simply as I-25 Business (I-25 Bus.) along the Interstate. I-25 has seven business routes within the state. Road concurrences are frequent in Wyoming, and the seven business highways often overlay multiple other highways, including US 87 Bus., wholly or partly at most of these seven locations, as US 87 largely follows I-25 throughout the state.
Cheyenne
Interstate 25 Business | |
---|---|
Location | Cheyenne |
Length | 8.006 mi (12.884 km) |
U.S. Highway 87 Business | |
---|---|
Location | Cheyenne |
Interstate 25 Business (I-25 Bus.) and U.S. Highway 87 Business (US 87 Bus.) are business loops serving the city of Cheyenne in Laramie County. The 8.006-mile (12.884 km) multiplexed highway begins at exit 7 of I-25/US 87 and is routed along Wyoming Highway 212 (WYO 212) and named College Drive. At just over 2.5 miles (4.0 km), US 85 is intersected. Here, I-25 Bus. leaves WYO 212, turns north onto US 85, and remains paired with it until its end. I-25 Bus./US 85/US 87 Bus. enter Cheyenne from the south and intersect I-80 at exit 362. At this point, I-180 begins. Despite the Interstate designation, the I-180 portion is not a freeway. The I-180 concurrency only lasts for just over one mile (1.6 km) as I-180 ends at I-80 Bus./US 30 along Lincolnway. I-25 Bus. continues north with US 85 and US 87 Bus. now as a one-way couplet through central Cheyenne northbound as Warren Avenue and southbound as Central Avenue. Near Cheyenne Regional Airport, the one-way streets combine and continue as Central Avenue before intersecting the southern terminus of WYO 219 at Yellowstone Road. I-25 Bus. and US 87 Bus. terminate at exit 12 of I-25/US 87. Here, US 85 joins those routes northbound.
Major intersections
The entire route is in Laramie County.
Location | mi | km | Destinations | Notes | |||
---|---|---|---|---|---|---|---|
| 0.000 | 0.000 | I-25 (US 87) – Ft. Collins WYO 212 begins | Braided interchange; southern terminus of I-25 BL/US 87 Bus.; exit 7 on I-25; south end of WYO 212 concurrency; road continues as Clear Creek Parkway | |||
South Greeley | 2.705 | 4.353 | US 85 south (South Greeley Highway south) / WYO 212 east (College Drive east) – Greeley, Laramie County Community College | North end of WYO 212 concurrency; south end of US 85 concurrency | |||
Cheyenne | 3.898 | 6.273 | I-80 to US 30 west – Rock Springs, Sidney I-180 begins | South end of I-180 concurrency; exit 362 on I-80 | |||
See I-180 | |||||||
5.138 | 8.269 | I-180 ends I-80 BL / US 30 (Lincolnway) | North end of I-180 concurrency | ||||
7.188 | 11.568 | WYO 219 (Yellowstone Road) | Southern terminus of WYO 219 | ||||
8.006 | 12.884 | US 85 north / I-25 / US 87 / Central Avenue (WYO 224) – Fort Collins, Torrington, Casper, Wyoming Department of Transportation, Game and Fish, Warren AFB, National Guard | Northern terminus of I-25 BL/US 87 Bus.; exit 12 on I-25; north end of US 85 concurrency; road continues west as Central Avenue (WYO 224) | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Chugwater
Main article: Wyoming Highway 321Interstate 25 Business | |
---|---|
Location | Chugwater |
Length | 3.28 mi (5.28 km) |
Interstate 25 Business (I-25 Bus.) is a business route signed as WYO 321 and serving the town of Chugwater in southeastern Platte County. The highway begins at exit 54 of I-25/US 87. At this interchange lies the northern terminus of WYO 211. Here, I-25 Bus. travels east past the Chugwater rest area. At 0.6 miles (0.97 km) is the western terminus of WYO 313. Less than three miles (4.8 km) later, I-25 Bus. (WYO 321) reaches I-25/US 87 at exit 57, where they both end. WYO 321 is signed from the freeway as I-25 Bus. and serves as a de facto business route; however, I-25 Bus. is not signed anywhere along WYO 321.
Wheatland
Interstate 25 Business | |
---|---|
Location | Wheatland |
Length | 2.95 mi (4.75 km) |
U.S. Highway 87 Business | |
---|---|
Location | Wheatland |
Interstate 25 Business (I-25 Bus.) and U.S. Highway 87 Business (US 87 Bus.) are concurrent business loops serving the town of Wheatland in central Platte County. I-25 Bus./US 87 Bus. begin at exit 78 of I-25/US 87. Here, I-25 Bus./US 87 Bus. begin on a short section of Mariposa Parkway but then turn north onto South Wheatland Highway for 0.3 miles (0.48 km). WYO 310 and WYO 312 are then intersected as the business routes turn east along South Street. The business routes turn north 0.5 miles (0.80 km) later onto 9th Street and intersect WYO 316 (Gilchrist Street) shortly after. Further north, the southern terminus of WYO 320 is intersected as the business loops become South Swanson Road. At 2.95 miles (4.75 km), I-25 Bus./US 87 Bus. meet I-25/US 87 at exit 80 where they end.
Major intersections
The entire route is in Platte County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Wheatland | 0.000 | 0.000 | I-25 / US 87 – Cheyenne, Douglas | Southern terminus of I-25 BL/US 87 Bus.; I-25 exit 78; road continues west as Mariposa Parkway | |
0.590 | 0.950 | WYO 312 (South Street west) / WYO 310 (16th Street north) | Northern terminus of WYO 312; western terminus of WYO 310 | ||
1.279 | 2.058 | WYO 316 (Gilchrist Street) | Western terminus of WYO 316 | ||
2.198 | 3.537 | WYO 320 – Laramie River Power Station, Grayrocks Reservoir | Southern terminus of WYO 320 | ||
| 2.95 | 4.75 | I-25 / US 87 – Cheyenne, Douglas | Northern terminus of I-25 BL/US 87 Bus.; I-25 exit 80; road continues west, unpaved, as Swanson Road | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Douglas
Interstate 25 Business | |
---|---|
Location | Douglas |
Length | 4.966 mi (7.992 km) |
U.S. Highway 20 Business | |
---|---|
Location | Douglas |
U.S. Highway 26 Business | |
---|---|
Location | Douglas |
U.S. Highway 87 Business | |
---|---|
Location | Douglas |
Interstate 25 Business (I-25 Bus.), U.S. Highway 20 Business (US 20 Bus.), U.S. Highway 26 Business (US 26 Bus.), and U.S. Highway 87 Business (US 87 Bus.) are concurrent 4.966-mile (7.992 km) business loops serving the town of Douglas in southern Converse County. I-25 Bus./US 20 Bus./US 26 Bus./US 87 Bus. begin at exit 135 of I-25/US 20/US 26/US 87 southeast of Douglas. The loops follow East Richards Street into Douglas. At South 4th Street, the loops turn north through Douglas. The loops turn west onto Center Street one mile (1.6 km) later, which becomes Yellowstone Highway. Near their end, the northern terminus of WYO 94 and the southern terminus of WYO 59 are intersected at Riverbend Drive. Past that intersection, the business routes rejoin I-25/US 20/US 26/US 87 at exit 140.
Major intersections
The entire route is in Converse County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.000 | 0.000 | I-25 / US 20 / US 26 / US 87 – Cheyenne, Casper | Southern terminus of I-25 Bus./US 87 Bus., eastern terminus of US 20 Bus./US 26 Bus.; exit 135 on I-25 | |
Douglas | 4.599 | 7.401 | WYO 59 north / WYO 94 south (Riverbend Drive) to WYO 91 – Gillette, Esterbrook, Law Enforcement Academy, Eastern Wyoming College Douglas Campus | Southern terminus of WYO 59; northern terminus of WYO 94 | |
4.966 | 7.992 | I-25 / US 20 / US 26 / US 87 – Cheyenne, Casper | Northern terminus of I-25 Bus./US 87 Bus., western terminus of US 20 Bus./US 26 Bus.; exit 140 on I-25 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Glenrock
Interstate 25 Business | |
---|---|
Location | Glenrock |
Length | 6.98 mi (11.23 km) |
Interstate 25 Business (I-25 Bus.) is a business route serving the town of Glenrock in Converse County. I-25 Bus. begins at exit 165 of I-25. The business route travels north, concurrent with WYO 95, into Glenrock on Deer Creek Road and then South 4th Street. At approximately two miles (3.2 km), I-25 Bus./WYO 95 intersect US 20/US 26/US 87. Here, I-25 Bus. turns east onto Birch Street to travel with US 20/US 26/US 87 for the remainder of its route, while WYO 95 turns west onto Birch Street. I-25 Bus. continues east out of Glenrock, intersecting the northern terminus of WYO 90 (Boxelder Road), before reaching its eastern end at exit 160 of I-25. US 20/US 26/US 87 join eastbound I-25.
Major intersections
The entire route is in Converse County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.000 | 0.000 | US 20 / US 26 east / US 87 south / I-25 – Douglas, Casper | Eastern terminus; west end of concurrency with US 20/US 26/US 87; I-25 exit | |
Glenrock | 4.900 | 7.886 | US 20 / US 26 west / US 87 north (WYO 95 north) | East end of concurrency with US 20/US 26/US 87; west end of concurrency with WYO 95 | |
| 6.98 | 11.23 | WYO 95 ends / I-25 – Douglas, Casper | Western terminus of I-25 BL; west end of concurrency with WYO 95; southern terminus of WYO 95; I-25 exit 165; road continues as CR 19 (Don't Litter) | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Casper
Interstate 25 Business | |
---|---|
Location | Casper |
Length | 2.180 mi (3.508 km) |
Interstate 25 Business (I-25 Bus.) is a business loop serving the city of Casper in eastern Natrona County. The 2.18-mile (3.51 km) loop begins at exit 188A of I-25, heading south on Center Street along with US 20 Bus. and unsigned WYO 255. The loop turns left onto 1st Street, where it joins US 20 Bus. and US 26 Bus. WYO 251 intersects the loop from the south along Wolcott and Durbin streets before US 20/US 26/US 87 depart on Yellowstone Highway and their respective business routes end. There, I-25 Bus. turns north along Bryan Stock Trail, where eastbound US 20/US 26 and southbound US 87 are concurrent with I-25 Bus. westbound. The loop ends at exit 186 of I-25.
Major intersections
The entire route is in Casper, Natrona County.
mi | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 87 Bus. / WYO 255 begin / I-25 / US 20 / US 26 / US 87 – Buffalo, Shoshoni, Cheyenne | Western terminus of I-25 BL/US 87 Bus.; west end of unsigned WYO 255 concurrency; northern terminus of unsigned WYO 255; exit 188A on I-25; road continues north as Center Street | ||
0.480 | 0.772 | US 20 Bus. / US 26 Bus. west (1st Street west) / WYO 255 ends | West end of US 20 Bus./US 26 Bus. concurrency; east end of unsigned WYO 255 concurrency | ||
0.546 | 0.879 | Wolcott Street (WYO 251 south) | One-way street, outbound access only | ||
Durbin Street (WYO 251) | One-way street, inbound access only | ||||
2.130 | 3.428 | US 20 / US 26 east / US 87 south (Yellowstone Highway east) / US 20 Bus. / US 26 Bus. / US 87 Bus. end | Eastern terminus of US 20 Bus./US 26 Bus./US 87 Bus.; east end of US 20 Bus./US 26 Bus./US 87 Bus. concurrency | ||
2.180 | 3.508 | I-25 / US 87 north / US 20 / US 26 west – Buffalo, Shoshoni | Eastern terminus; east end of westbound concurrency with US 20/US 26/US 87; exit 186 on I-25; road continues north as Bryan Stock Trail; access to I-25 south via US 20/US 26 east/US 87 south (Yellowstone Hwy. east) | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Buffalo
Interstate 25 Business | |
---|---|
Location | Buffalo |
Length | 1.673 mi (2.692 km) |
Interstate 25 Business (I-25 Bus.) is a business spur serving the city of Buffalo in Johnson County that runs concurrently with US 87 Bus. The 1.673-mile (2.692 km) spur begins at exit 298 of I-25/US 87 south of Buffalo. I-25 Bus. intersects WYO 196 0.5 miles (0.80 km) into its route as it follows Main Street into Buffalo. US 16 joins the spur at Fort Street one mile (1.6 km) later. US 16 has a short 0.5-mile (0.80 km) concurrency with the spur until Hart Street, where it turns east along I-90 Bus. where I-25 Bus. terminates. I-90 Bus. approaches the intersection from the north along the northern extension of US 87 Bus.
Major intersections
The entire route is in Johnson County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.000 | 0.000 | US 87 Bus. begins / I-25 / US 87 to I-90 – Gillette, Sheridan, Casper | Southern termini of I-25 Bus. and US 87 Bus.; south end of US 87 Bus. concurrency | |
Buffalo | 0.426 | 0.686 | WYO 196 | Northern terminus of WYO 196 | |
1.256 | 2.021 | US 16 west (Fort Street) – Worland, Yellowstone | South end of US 16 concurrency | ||
1.673 | 2.692 | US 16 east (I-90 BL east) to I-25 / I-90 / Main Street north ( I-90 BL west / US 87 Bus. north) | Northern terminus; north end of US 16/US 87 Bus. concurrency; highway continues north as Main Street (I-90 Bus. west/US 87 Bus. north) | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ Staff, Data Management Bureau (March 16, 2010). "Posted Route–Legal Description; Business Loops" (PDF). New Mexico Department of Transportation. Retrieved September 10, 2014.
- ^ Staff, Data Management Bureau (March 27, 2014). "TIMS Road Segments by Posted Route/Point with AADT Info; BL, I, ICR, IX-Routes" (PDF). New Mexico Department of Transportation. Archived from the original (PDF) on September 3, 2014. Retrieved September 10, 2014.
- "Overview of Business Loop 11" (Map). Google Maps. Retrieved September 11, 2014.
- Staff, Data Management Bureau (March 16, 2010). "Posted Route–Legal Description; New Mexico Routes Sorted by Routes" (PDF). New Mexico Department of Transportation. Archived from the original (PDF) on December 3, 2020. Retrieved September 14, 2014.
- "Overview of Business Loop 12" (Map). Google Maps. Retrieved September 11, 2014.
- "Overview of Business Loop 13" (Map). Google Maps. Retrieved September 12, 2014.
- "Interstate Business Route 25". interstate-guide.com. September 1, 2016. Retrieved November 20, 2023.
- "Overview of Business Loop 15" (Map). Google Maps. Retrieved September 12, 2014.
- Microsoft; Nokia. "Overview of Business Loop 16" (Map). Bing Maps. Microsoft. Retrieved September 12, 2014.
- "Overview of Business Loop 17" (Map). Google Maps. Retrieved September 12, 2014.
- "Business Route 25".
- ^ Staff, Online Transportation Information System. "Highway 025B between 0 and 1.948". Colorado Department of Transportation. Archived from the original on September 10, 2012. Retrieved September 15, 2014.
- "Overview of State Highway 25B" (Map). Google Maps. Retrieved September 15, 2014.
- ^ Staff, Online Transportation Information System. "Highway 025C between 0 and 4.039". Colorado Department of Transportation. Archived from the original on September 10, 2012. Retrieved September 15, 2014.
- "Overview of SH 25C" (Map). Google Maps. Retrieved September 15, 2014.
- Staff. "Highway Data Explorer". Online Transportation Information System. Colorado Department of Transportation.
- Staff, Special Committee on U.S. Route Numbering (December 2009). "U.S. Route Number Database". American Association of State Highway and Transportation Officials. Archived from the original on July 14, 2011. Retrieved September 14, 2014.
- "Business Route 25".
- "Business Route 25".
- ^ Maintenance Staff (February 15, 2013). "2013 Maintenance Section Reference Book" (PDF). Wyoming Department of Transportation. Retrieved September 17, 2014.
- "Overview of I-25 Bus. in Cheyenne" (Map). Google Maps. Retrieved September 21, 2014.
- ^ Overview Map of I-25 Business (Chugwater) (Map). Yahoo Maps. Retrieved April 10, 2011.
- "WYO 321/I-25 Business - Chugwater". Archived from the original on September 24, 2012. Retrieved April 15, 2011.
- ^ Overview Map of I-25 Business (Wheatland) (Map). Yahoo Maps. Retrieved April 10, 2011.
- Wyoming Department of Transportation Reference Marker Book — November 2004 (PDF) (Map). WYDOT. Archived from the original (PDF) on July 17, 2011. Retrieved April 14, 2011.
- *I-25 Bus -Wheatland
- I-25 Bus - I-25/US 87 to WYO 320 Archived 2012-09-24 at the Wayback Machine
- I-25 Bus - WYO 320 to WYO 316 Archived 2012-09-24 at the Wayback Machine
- I-25 Bus - WYO 316 to WYO 310/WYO 312 Archived 2012-09-24 at the Wayback Machine
- I-25 Bus - WYO 310/WYO 312 to I-25/US 87 Archived September 24, 2012, at the Wayback Machine
- "Overview of I-25 Bus. in Douglas" (Map). Google Maps. Retrieved September 22, 2014.
- ^ Overview Map of I-25 Business (Glenrock) (Map). Yahoo Maps. Retrieved April 15, 2011.
- *I-25 Business - Glenrock
- I-25 Bus - I-25/WYO 95 to US 20/US 26/US 87/WYO 95 Archived 2012-09-24 at the Wayback Machine
- I-25 Bus - WYO 95 to WYO 90 Archived 2012-09-25 at the Wayback Machine
- I-25 Bus - WYO 90 to I-25/US 20/US 26/US 87 Archived 2012-09-25 at the Wayback Machine
- "Overview of I-25 Bus. in Casper" (Map). Google Maps. Retrieved September 23, 2014.
- "Overview of I-25 Bus. in Buffalo" (Map). Google Maps. Retrieved September 22, 2014.
External links
- Interstate 25 in Wyoming, AARoads
- Interstate Highways, Wyoming Routes, Corco Highways
- Business Interstate Highways
- Interstate 25
- Transportation in Huerfano County, Colorado
- Transportation in Las Animas County, Colorado
- Transportation in Colfax County, New Mexico
- Transportation in San Miguel County, New Mexico
- Transportation in Sierra County, New Mexico
- Transportation in Socorro County, New Mexico
- Transportation in Valencia County, New Mexico
- Transportation in Converse County, Wyoming
- Transportation in Johnson County, Wyoming
- Transportation in Laramie County, Wyoming
- Transportation in Natrona County, Wyoming