Interstate 269 | |||||||
---|---|---|---|---|---|---|---|
I-269 highlighted in red | |||||||
Route information | |||||||
Auxiliary route of I-69 | |||||||
Length | 45.19 mi (72.73 km) | ||||||
Existed | 2015–present | ||||||
History | Opened in 1998 as SR 385 | ||||||
NHS | Entire route | ||||||
Major junctions | |||||||
South end | I-55 / I-69 / MS 304 in Hernando, MS | ||||||
Major intersections |
| ||||||
North end | I-40 / SR 385 in Arlington, TN | ||||||
Location | |||||||
Country | United States | ||||||
States | Mississippi, Tennessee | ||||||
Counties | MS: DeSoto, Marshall TN: Fayette, Shelby | ||||||
Highway system | |||||||
|
Interstate 269 (I-269) is a beltway around the city of Memphis, Tennessee, and its adjacent suburban areas in southwestern Tennessee and northern Mississippi, completed in October 2018. I-269 was planned and built to serve as an outer bypass for the Memphis metropolitan area, funneling through traffic around the metro area while also functioning as a bypass of future I-69, which will run directly through the center of the metro area. I-269 currently connects to its parent route, I-69, at an interchange in Hernando, Mississippi, and will do so again in Millington, Tennessee, in the future.
Route description
I-269 begins at an interchange with I-69 near Hernando, Mississippi. The highway travels eastward across rural areas to the town of Byhalia, Mississippi, where it has an interchange with I-22/U.S. Route 78 (US 78). Here, the highway continues northeastward, slowly veering north towards the Tennessee state line. Entering Tennessee, I-269 has an interchange with US 72 and the southern segment of State Route 385 (SR 385) in Collierville. The route then proceeds north along former SR 385 to an interchange with I-40 and the northern segment of SR 385 in Arlington.
History
The Tennessee Department of Transportation's (TDOT) plans called for the two sections to be connected in phases. Plans had the portion extending south from an incomplete interchange with SR 385 south to the Mississippi state line to completed in October 2015 to coincide with completion of the section in Mississippi from the Tennessee state line to Mississippi Highway 302 (MS 302). On January 29, 2007, the Federal Highway Administration (FHWA) issued a record of decision giving final federal approval for I-269, paving the way for the two states to design and construct the remaining section between Hernando and Collierville.
The first section of what is now I-269, the Winfield Dunn Parkway, from I-40 to US 64 opened on September 4, 2007, signed as SR 385. The segment between US 64 and to SR 193 (Macon Road) opened on June 15, 2009, and the segment between SR 193 and SR 57 opened on November 22, 2013. The last section of the Bill Morris Parkway, most of which remains signed as SR 385, was opened between US 72 and SR 57 on August 23, 2007.
On October 18, 2007, the Mississippi Department of Transportation (MDOT) announced that a bond was successfully issued through the state's Highway Enhancements Through Local Partnerships (HELP) Program for $83 million (equivalent to $118 million in 2023) to cover planning and right-of-way acquisition costs for Mississippi's portion of the route. Mississippi began its part of I-269 construction on June 23, 2011, with the 25-mile (40 km) section from the state line to I-55 totaling construction costs of $640 million (equivalent to $811 million in 2023) as of 2014.
On October 23, 2015, the first signed segment of I-269 opened between the eastern terminus of SR 385 in Collierville and MS 302. On December 5, 2017, the second segment opened between MS 302 and MS 305, including the I-22 interchange.
In 2018, TDOT redesignated a portion of SR 385 between Collierville and I-40 in Arlington as I-269.
The segment of I-269 from the I-55/I-69 interchange in Hernando to MS 305 in Lewisburg, Mississippi, was completed on October 26, 2018, completing the connection between I-40 in Tennessee and I-55 in Mississippi.
The construction costs of the Tennessee portion of SR 385 from the 1980s until completion in 2013 was over $500 million (equivalent to $645 million in 2023). Both states' combined investments were over $1.2 billion (equivalent to $1.55 billion in 2023) for the 64.3-mile (103.5 km) I-269 project, including construction and rights-of-way expense listed above.
On October 13, 2021, a new interchange at McIngvale Road opened to traffic following a ribbon-cutting ceremony. The $8.7-million project also included realigning a 1.5-mile (2.4 km) section of McIngvale Road between Byhalia Road and Green T Road and widening it to five lanes.
Exit list
State | County | Location | mi | km | Exit | Destinations | Notes | |
---|---|---|---|---|---|---|---|---|
Mississippi | DeSoto | Hernando | 0.00 | 0.00 | 1A-B | I-69 south / MS 304 west – Tunica, Casinos I-55 / I-69 north – Memphis, Southaven, Jackson | Southern terminus; exit 283A on I-55; signed as exits 1A (south) and 1B (north); southern end of MS 304 concurrency; cloverleaf interchange; freeway continues as I-69 south/MS 304 west | |
| 1.31 | 2.11 | 1 | McIngvale Road | Opened to traffic on October 13, 2021 | |||
| 3.17 | 5.10 | 3 | Getwell Road | ||||
| 5.18 | 8.34 | 5 | Laughter Road | ||||
| 7.32 | 11.78 | 7 | Craft Road | ||||
| 9.37 | 15.08 | 9 | MS 305 – Olive Branch, Independence | ||||
| 13.41 | 21.58 | 13 | Red Banks Road | ||||
Byhalia | 15.57 | 25.06 | 16 | I-22 east / US 78 – Holly Springs, Tupelo, Birmingham, Olive Branch, Memphis | Signed as exits 16A (east) and 16B (west); western terminus of I-22; I-22/US 78 exit 12 | |||
Marshall | | 17.85 | 28.73 | 18 | MS 309 – Byhalia | |||
Cayce | 23.79 | 38.29 | 23 | MS 302 – Southaven, Olive Branch | ||||
Mississippi–Tennessee line | MS 304 ends | |||||||
Tennessee | Shelby–Fayette county line | Collierville–Piperton line | 27.24 | 43.84 | 1 | US 72 (SR 86) – Collierville, Corinth | ||
28.55 | 45.95 | 2 | SR 385 west (Bill Morris Parkway) – Memphis | Eastern terminus of SR 385 | ||||
Fayette | Piperton | 29.55 | 47.56 | 3 | SR 57 – Piperton, Collierville | |||
Fayette–Shelby county line | | 37.75 | 60.75 | 11 | SR 193 – Macon, Fisherville | |||
Shelby | Arlington | 41.70 | 67.11 | 15 | US 64 (SR 15) – Bartlett, Somerville | |||
44.56 | 71.71 | 18 | Donelson Farms Parkway | |||||
45.19 | 72.73 | 19 | I-40 / SR 385 north – Memphis, Nashville | Signed as exits 19A (east) and 19B (west); exit 24A on I-40; freeway continues as SR 385 north | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- "I-269 corridor finally opens, connecting I-55, I-40". October 26, 2018 – via www.actionnews5.com.
- Charlier, Tom (August 26, 2007). "Complete Tenn. 385 faces probable delays". The Commercial Appeal. Memphis. Archived from the original on September 30, 2007.
- "Proposal Contract for CNL024" (PDF). Tennessee Department of Transportation. Archived from the original (PDF) on October 12, 2012.
- "Tenn. 385 opens up Arlington — New stretch of highway hailed for its access to progress". The Commercial Appeal. September 5, 2007.
- Charlier, Tom (June 14, 2009). "Three-mile segment of Tenn. Hwy. 385 opening". The Commercial Appeal. Archived from the original on June 16, 2009. Retrieved May 5, 2020.
- ^ "Last Part of 385 Opens Friday". WREG-TV. November 22, 2013.
- McKenzie, Kevin (August 22, 2007). "Tenn. 385 opens new path: Access to Fayette County to be a Collierville short route". The Commercial Appeal. Memphis, Tennessee. Archived from the original on September 30, 2007. Retrieved August 23, 2007.
- ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- Risher, Wayne (September 7, 2007). "Good fit sought with I-269". The Commercial Appeal. Memphis. Archived from the original on May 17, 2011.
- "I-269, Mississippi's largest highway project, connects communities and encourages economic growth" (Press release). United States Department of Transportation. June 27, 2011. Archived from the original on June 29, 2011.
- "I-269 Construction Reaches Halfway Point". The Commercial Appeal. Memphis. March 26, 2014. Archived from the original on February 9, 2015.
- Charlier, Tom (October 19, 2015). "Section of I-269 from Collierville to Mississippi to open Friday". The Commercial Appeal. Memphis. Retrieved November 19, 2015.
- Bailey, Tom (December 8, 2017). "Memphis to Byhalia nonstop: I-269 and I-22 now intersect". The Commercial Appeal. Retrieved May 5, 2020.
- "Memphis to Byhalia nonstop: I-269 and I-22 now intersect". The Commercial Appeal. Retrieved December 10, 2017.
- Garland, Max (October 26, 2018). "I-269's completion marked with ribbon cutting in DeSoto County, opening its final stretch". The Commercial Appeal. Retrieved May 5, 2020.
- "Last section of I-269 set to open Oct. 26, completing new loop around Memphis". The Daily Memphian. Retrieved October 11, 2018.
- ^ Clevenger, Chance (October 13, 2021). "County cuts ribbon on McIngvale Road & I-269 Exit". The DeSoto Times Tribune. Retrieved October 17, 2021.
External links
KML file (edit • help) Template:Attached KML/Interstate 269KML is not from Wikidata- Design Public Hearing Announcement Archived May 29, 2008, at the Wayback Machine (Tennessee Department of Transportation)
- Original and current plans (Mississippi Department of Transportation)
- Kurumi.com entry
- I69Info.com: Memphis
- Interstate-Guide.com (I-269)
- Desoto Times
Auxiliary routes of Interstate 69 | ||
---|---|---|
|